{"id":78991,"date":"2024-10-17T18:27:52","date_gmt":"2024-10-17T18:27:52","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-9780784409237-2007\/"},"modified":"2024-10-24T19:38:45","modified_gmt":"2024-10-24T19:38:45","slug":"asce-9780784409237-2007","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-9780784409237-2007\/","title":{"rendered":"ASCE 9780784409237 2007"},"content":{"rendered":"

This report explores methodologies and techniques for applying rehabilitation engineering to aging hydroelectric infrastructure.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
10<\/td>\nTable of Contents <\/td>\n<\/tr>\n
18<\/td>\n1.0 CHAPTER 1 \u2013 INTRODUCTION
1.1 Objective
LIST OF TABLES <\/td>\n<\/tr>\n
19<\/td>\nLIST OF FIGURES <\/td>\n<\/tr>\n
20<\/td>\n1.2 About This Guideline <\/td>\n<\/tr>\n
21<\/td>\n1.3 Historical Perspective <\/td>\n<\/tr>\n
23<\/td>\n1.3.1 Dam and Hydropower Development & Aging Infrastructure <\/td>\n<\/tr>\n
24<\/td>\n1.3.2 Evolving Design Criteria and Regulatory Demands <\/td>\n<\/tr>\n
27<\/td>\n1.4 Initiating Change <\/td>\n<\/tr>\n
28<\/td>\n1.4.1 Make It Last Longer and Work Better <\/td>\n<\/tr>\n
30<\/td>\n1.5 Technical References
1.6 Collective Knowledge <\/td>\n<\/tr>\n
31<\/td>\n2.0 CHAPTER 2 \u2013 PLANNING AND EVALUATION
2.1 Introduction
2.2 Planning and Evaluation Process <\/td>\n<\/tr>\n
32<\/td>\n2.3 Identify Need for Project
2.3.1 Mandatory Actions
2.3.2 Discretionary Actions <\/td>\n<\/tr>\n
33<\/td>\n2.4 Assemble Data and Information and Assess Condition <\/td>\n<\/tr>\n
34<\/td>\n2.4.1 Sources of Information <\/td>\n<\/tr>\n
38<\/td>\n2.4.2 Condition Assessment <\/td>\n<\/tr>\n
39<\/td>\n2.4.3 Beyond Engineering <\/td>\n<\/tr>\n
43<\/td>\n2.5 Identify Parties Involved <\/td>\n<\/tr>\n
44<\/td>\n2.6 Plan and Evaluate Alternatives
2.6.1 Regulatory Considerations <\/td>\n<\/tr>\n
45<\/td>\n2.6.2 Cost Estimates
2.6.3 Constructability <\/td>\n<\/tr>\n
46<\/td>\n2.6.4 Staging and Scheduling <\/td>\n<\/tr>\n
47<\/td>\n2.6.5 Access
2.6.6 Contracting Options <\/td>\n<\/tr>\n
48<\/td>\n2.7 Selection of Preferred Course of Action
2.7.1 Comparison of Alternatives
2.7.2 Economic Comparisons <\/td>\n<\/tr>\n
50<\/td>\n2.7.3 Financial Considerations
2.8 Moving Forward with a Life Extension or Upgrade Project <\/td>\n<\/tr>\n
51<\/td>\n2.9 Technical References <\/td>\n<\/tr>\n
52<\/td>\n3.0 CHAPTER 3 \u2013 INNOVATIVE TECHNOLOGIES
3.1 Introduction <\/td>\n<\/tr>\n
55<\/td>\n3.2 Surveillance
3.2.1 Underwater Surveillance and Remote Operated Vehicles <\/td>\n<\/tr>\n
56<\/td>\n3.2.2 Automation of Instrumentation and Monitoring <\/td>\n<\/tr>\n
57<\/td>\n3.2.3 Flow Measurement
3.3 Assessment Techniques
3.3.1 Condition Assessment <\/td>\n<\/tr>\n
59<\/td>\n3.3.2 Business Risk Assessment <\/td>\n<\/tr>\n
60<\/td>\n3.3.3 Testing <\/td>\n<\/tr>\n
61<\/td>\n3.4 Performance Analysis
3.4.1 Alkali-Aggregate Reaction (AAR) <\/td>\n<\/tr>\n
64<\/td>\n3.4.2 Reduction of Hydraulic Losses <\/td>\n<\/tr>\n
65<\/td>\n3.4.3 Sealing Dams and Hydraulic Structures <\/td>\n<\/tr>\n
67<\/td>\n3.5 Life Extension Methods
3.5.1 Underwater Repairs <\/td>\n<\/tr>\n
68<\/td>\n3.5.2 Construction Methods
3.5.3 Relining and Repairing Water Passages <\/td>\n<\/tr>\n
71<\/td>\n3.5.4 Protective Coatings <\/td>\n<\/tr>\n
72<\/td>\n3.5.5 Repairing Concrete and Masonry Dams <\/td>\n<\/tr>\n
73<\/td>\n3.5.6 Rehabilitation of Gates <\/td>\n<\/tr>\n
74<\/td>\n3.5.7 Use of Roller Compacted Concrete (RCC) <\/td>\n<\/tr>\n
75<\/td>\n3.6 Modernization (Upgrade) <\/td>\n<\/tr>\n
76<\/td>\n3.7 Environmental Considerations
3.7.1 Preserving Historical Structures <\/td>\n<\/tr>\n
77<\/td>\n3.7.2 Removal of Hazardous Materials
3.7.3 Habitat Maintenance
3.7.4 Reservoir Ice <\/td>\n<\/tr>\n
78<\/td>\n3.7.5 Reservoir Debris
3.7.6 Water Quality <\/td>\n<\/tr>\n
79<\/td>\n3.7.7 Fish Passage
3.7.8 Noise Reduction <\/td>\n<\/tr>\n
80<\/td>\n3.8 Management and Knowledge Systems
3.8.1 Management Approaches <\/td>\n<\/tr>\n
81<\/td>\n3.8.2 Decision Support
3.8.3 Guides and Standards <\/td>\n<\/tr>\n
82<\/td>\n3.9 Technical References <\/td>\n<\/tr>\n
90<\/td>\n4.0 CHAPTER 4 \u2013 STRUCTURES
4.1 Introduction <\/td>\n<\/tr>\n
100<\/td>\n4.2 Intakes
4.2.1 Function <\/td>\n<\/tr>\n
101<\/td>\n4.2.2 Problems <\/td>\n<\/tr>\n
102<\/td>\n4.2.3 Corrective Measures <\/td>\n<\/tr>\n
103<\/td>\n4.2.4 Case Histories <\/td>\n<\/tr>\n
110<\/td>\n4.2.5 Collective Knowledge
4.2.6 Technical References <\/td>\n<\/tr>\n
111<\/td>\n4.3 Dams, Spillways, and Reservoirs
4.3.1 General <\/td>\n<\/tr>\n
112<\/td>\n4.3.2 Concrete Dams & Spillways <\/td>\n<\/tr>\n
119<\/td>\n4.3.3 Embankment Dams <\/td>\n<\/tr>\n
126<\/td>\n4.3.4 Timber Crib Dams <\/td>\n<\/tr>\n
127<\/td>\n4.3.5 Reservoirs <\/td>\n<\/tr>\n
129<\/td>\n4.3.6 Case Histories <\/td>\n<\/tr>\n
172<\/td>\n4.3.7 Collective Knowledge
4.3.8 Technical References <\/td>\n<\/tr>\n
175<\/td>\n4.4 Powerhouses
4.4.1 Function <\/td>\n<\/tr>\n
176<\/td>\n4.4.2 Problems <\/td>\n<\/tr>\n
181<\/td>\n4.4.3 Corrective Measures <\/td>\n<\/tr>\n
184<\/td>\n4.4.4 Case Histories <\/td>\n<\/tr>\n
188<\/td>\n4.4.5 Collective Knowledge <\/td>\n<\/tr>\n
189<\/td>\n4.4.6 Technical References
4.5 Fish Passage Facilities
4.5.1 Function <\/td>\n<\/tr>\n
190<\/td>\n4.5.2 Problems <\/td>\n<\/tr>\n
206<\/td>\n4.5.3 Corrective Measures
4.5.4 Opportunities <\/td>\n<\/tr>\n
208<\/td>\n4.5.5 Case Histories <\/td>\n<\/tr>\n
226<\/td>\n4.5.6 Collective Knowledge <\/td>\n<\/tr>\n
228<\/td>\n4.5.7 Technical References
4.6 Trash Racks
4.6.1 Function <\/td>\n<\/tr>\n
230<\/td>\n4.6.2 Problems <\/td>\n<\/tr>\n
231<\/td>\n4.6.3 Corrective Measures <\/td>\n<\/tr>\n
233<\/td>\n4.6.4 Opportunities
4.6.5 Case Histories <\/td>\n<\/tr>\n
237<\/td>\n4.6.6 Collective Knowledge
4.6.7 Technical References <\/td>\n<\/tr>\n
238<\/td>\n4.7 Trash Rakes
4.7.1 Function <\/td>\n<\/tr>\n
239<\/td>\n4.7.2 Problems <\/td>\n<\/tr>\n
240<\/td>\n4.7.3 Corrective Measures
4.7.4 Opportunities
4.7.5 Case Histories <\/td>\n<\/tr>\n
244<\/td>\n4.7.6 Collective Knowledge
4.7.7 Technical References <\/td>\n<\/tr>\n
245<\/td>\n5.0 CHAPTER 5 \u2013 WATER CONVEYANCES
5.1 Introduction <\/td>\n<\/tr>\n
251<\/td>\n5.2 Intake, Canals, Flumes, and Forebays
5.2.1 Function <\/td>\n<\/tr>\n
252<\/td>\n5.2.2 Problems <\/td>\n<\/tr>\n
255<\/td>\n5.2.3 Corrective Measures <\/td>\n<\/tr>\n
256<\/td>\n5.2.4 Opportunities <\/td>\n<\/tr>\n
257<\/td>\n5.2.5 Case Histories <\/td>\n<\/tr>\n
262<\/td>\n5.2.6 Collective Knowledge <\/td>\n<\/tr>\n
263<\/td>\n5.2.7 Technical References
5.3 Tunnels, Shafts, and Other Underground Openings
5.3.1 Function <\/td>\n<\/tr>\n
264<\/td>\n5.3.2 Problems <\/td>\n<\/tr>\n
265<\/td>\n5.3.3 Corrective Measures <\/td>\n<\/tr>\n
266<\/td>\n5.3.4 Opportunities
5.3.5 Case Histories <\/td>\n<\/tr>\n
274<\/td>\n5.3.6 Collective Knowledge <\/td>\n<\/tr>\n
275<\/td>\n5.3.7 Technical References
5.4 Penstocks
5.4.1 Function <\/td>\n<\/tr>\n
276<\/td>\n5.4.2 Problems <\/td>\n<\/tr>\n
278<\/td>\n5.4.3 Corrective Measures <\/td>\n<\/tr>\n
279<\/td>\n5.4.4 Opportunities
5.4.5 Case Histories <\/td>\n<\/tr>\n
286<\/td>\n5.4.6 Collective Knowledge <\/td>\n<\/tr>\n
287<\/td>\n5.4.7 Technical References
5.5 Tailraces
5.5.1 Function <\/td>\n<\/tr>\n
288<\/td>\n5.5.2 Problems <\/td>\n<\/tr>\n
290<\/td>\n5.5.3 Corrective Measures <\/td>\n<\/tr>\n
291<\/td>\n5.5.4 Opportunities <\/td>\n<\/tr>\n
292<\/td>\n5.5.5 Case Histories <\/td>\n<\/tr>\n
296<\/td>\n5.5.6 Collective Knowledge
5.5.7 Technical References <\/td>\n<\/tr>\n
298<\/td>\n6.0 CHAPTER 6 \u2013 WATER CONTROL DEVICES
6.1 Introduction <\/td>\n<\/tr>\n
303<\/td>\n6.2 Gates and Gate Hoists
6.2.1 Function <\/td>\n<\/tr>\n
304<\/td>\n6.2.2 Problems <\/td>\n<\/tr>\n
325<\/td>\n6.2.3 Corrective Measures
6.2.4 Opportunities <\/td>\n<\/tr>\n
327<\/td>\n6.2.5 Case Histories <\/td>\n<\/tr>\n
338<\/td>\n6.2.6 Collective Knowledge <\/td>\n<\/tr>\n
340<\/td>\n6.2.7 Technical References <\/td>\n<\/tr>\n
341<\/td>\n6.3 Valves and Operators
6.3.1 Function <\/td>\n<\/tr>\n
342<\/td>\n6.3.2 Problems, Causes, Solutions <\/td>\n<\/tr>\n
357<\/td>\n6.3.3 Corrective Measures
6.3.4 Opportunities
6.3.5 Case Histories <\/td>\n<\/tr>\n
358<\/td>\n6.3.6 Collective Knowledge <\/td>\n<\/tr>\n
359<\/td>\n6.3.7 Technical References
6.4 Flashboards
6.4.1 Function <\/td>\n<\/tr>\n
361<\/td>\n6.4.2 Problems <\/td>\n<\/tr>\n
362<\/td>\n6.4.3 Corrective Measures <\/td>\n<\/tr>\n
370<\/td>\n6.4.4 Case Histories <\/td>\n<\/tr>\n
382<\/td>\n6.4.5 Collective Knowledge
6.4.6 Technical References <\/td>\n<\/tr>\n
383<\/td>\n7.0 CHAPTER 7 \u2013 ANCILLARY SYSTEMS, SAFETY AND SECURITY
7.1 Introduction
7.2 Civil Works Systems
7.2.1 Structural Instrumentation <\/td>\n<\/tr>\n
387<\/td>\n7.2.2 Pressure Relief Systems <\/td>\n<\/tr>\n
389<\/td>\n7.2.3 Flood-Proofing <\/td>\n<\/tr>\n
391<\/td>\n7.2.4 Oil Containment Systems <\/td>\n<\/tr>\n
393<\/td>\n7.3 Systems Critical for Emergency Operations <\/td>\n<\/tr>\n
394<\/td>\n7.3.1 Electrical Backup Power (EBP) <\/td>\n<\/tr>\n
399<\/td>\n7.3.2 Communications <\/td>\n<\/tr>\n
401<\/td>\n7.3.3 Access During Emergencies <\/td>\n<\/tr>\n
402<\/td>\n7.4 Recreational Project Safety <\/td>\n<\/tr>\n
404<\/td>\n7.5 Project Security <\/td>\n<\/tr>\n
408<\/td>\n7.6 References <\/td>\n<\/tr>\n
409<\/td>\nLIST OF APPENDICES
Appendix A: Hydroelectric and Dam Engineering, Library of General Resources <\/td>\n<\/tr>\n
424<\/td>\nAppendix B: Project Information <\/td>\n<\/tr>\n
439<\/td>\nAppendix C: Tables <\/td>\n<\/tr>\n
460<\/td>\nAppendix D: Summary of Case Histories <\/td>\n<\/tr>\n
479<\/td>\nIndex
A
B
C <\/td>\n<\/tr>\n
480<\/td>\nD <\/td>\n<\/tr>\n
481<\/td>\nE <\/td>\n<\/tr>\n
482<\/td>\nF <\/td>\n<\/tr>\n
483<\/td>\nG <\/td>\n<\/tr>\n
484<\/td>\nH
I <\/td>\n<\/tr>\n
485<\/td>\nJ
K
L
M <\/td>\n<\/tr>\n
486<\/td>\nN
O
P <\/td>\n<\/tr>\n
487<\/td>\nQ
R <\/td>\n<\/tr>\n
488<\/td>\nS <\/td>\n<\/tr>\n
489<\/td>\nT <\/td>\n<\/tr>\n
490<\/td>\nU
V
W
Y
Z <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Civil Works for Hydroelectric Facilities<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASCE<\/b><\/a><\/td>\n2007<\/td>\n490<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":78992,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2660],"product_tag":[],"class_list":{"0":"post-78991","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asce","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/78991","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/78992"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=78991"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=78991"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=78991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}