ASTM-E929 2009
$40.63
E929-83(2009) Standard Test Method for Measuring Electrical Energy Requirements of Processing Equipment
Published By | Publication Date | Number of Pages |
ASTM | 2009 | 7 |
ASTM E929-83-Reapproved2009
Withdrawn Standard: Standard Test Method for Measuring Electrical Energy Requirements of Processing Equipment (Withdrawn 2014)
ASTM E929
Scope
1.1 This test method covers the determination of the composition of a materials stream in a solid waste resource recovery processing facility. The composition is determined with respect to one or more defined components. The results are used for determining the purity resulting from the operation of one or more separators, and in conjunction with Test Method E1108 used to measure the efficiency of a materials separation device.
1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information only.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For hazard statements, see Section 7.
Keywords
Mass; Polynary separator; Purity analysis–environmental applications; Refuse-derived fuel (RDF); Separators (in municipal waste treatment)
ICS Code
ICS Number Code 03.100.50 (Production. Production management)
DOI: 10.1520/E0929-83R09
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Scope Terminology Summary of Test Method Significance and Use |
2 | Apparatus Hazards Equipment Calibration Procedure FIG. 1 |
3 | Calculation |
4 | FIG. 2 |
5 | Precision and Bias FIG. 3 |
6 | A1. PROCEDURES FOR CHECKING METER INSTALLATIONS A1.1 Single Phase A1.2 Three-Phase, Three-Wire A1.3 Three-Phase, Four-Wire Delta (Two Stators) A1.4 Three-Phase, Four-Wire āYāĀ (Two Stators) A1.5 Time Load Method (Not to be used for calibration) |
7 | TABLE A1.1 |