{"id":98393,"date":"2024-10-18T11:12:53","date_gmt":"2024-10-18T11:12:53","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-9780784477946-2013\/"},"modified":"2024-10-24T21:11:51","modified_gmt":"2024-10-24T21:11:51","slug":"asce-9780784477946-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-9780784477946-2013\/","title":{"rendered":"ASCE 9780784477946 2013"},"content":{"rendered":"
“Prepared by the Committee on Specifications of the Construction Institute of ASCE Preparation of Construction Specifications for Civil Projects provides a ready, convenient resource for the recommended principles and approaches used for specification production in civil-engineered projects. Poorly written and ambiguous specifications can result in construction claims, increased cost, and litigation. This guide includes step-by-step instructions, checklists, and sample documents for various specifications. Topics include:
\n purpose, goals, philosophy, and developmental planning for specifications; formatting, writing, and review of specifications; and bidding and contract award documents. This guide is an update to Preparing Specifications for Design-Bid Build Projects and will be of interest to engineers, contractors, and construction professionals.”<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Cover <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Table of Contents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1.0 Introduction 1.1 General Purpose and Goals 1.1.1 Guide Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1.1.2 Contractual Relationships 1.1.3 Bid and Contract Documents <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1.2 Challenges and Suggested Solutions 1.2.1 Introduction 1.2.2 Specification Deficiencies <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1.2.3 Complicating Circumstances <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1.2.4 Engineering Concerns 1.2.5 Rising to the Challenge <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 1.2.6 Specification Writing Procedures 1.3 Specification Development Planning <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 1.4 Specification Writing Groups 1.4.1 Construction Document Production Organization <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 1.4.2 Group Functions 1.4.3 Maintaining Standards and Procedures <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 2.0 Writing the Specifications 2.1 Philosophy 2.1.1 Coverage <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 2.1.2 Coordination of Contract Documents 2.1.3 Project Complexity <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 2.1.4 Prescriptive Specifications <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 2.1.5 Performance Specifications <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 2.1.6 Comparison of Prescriptive and Performance Specifications <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 2.1.7 Combining Prescriptive and Performance Specifications <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 2.1.8 Separate Scope of Work Memorandum <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 2.1.9 Specifications and Sustainability <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 2.2 Format 2.2.1 Contract Format 2.2.2 Specification Numbering <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 2.2.3 Specification Contents <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 2.3 Technical Requirements 2.3.1 Coordination with Drawings <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 2.3.2 Workmanship <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 2.3.3 Testing and Acceptance <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 2.4 Computerized Specification Systems 2.4.1 Standard Specifications 2.4.2 Revisions 2.4.3 Specifications with BIM <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 2.5 Specification Writing 2.5.1 Clarity <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 2.5.2 Consistency 2.5.3 Vocabulary <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 2.5.4 Abbreviations and Symbols 2.6 Specification Review 2.7 Specification Example <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 3.0 Issuing Specifications 3.1 Issuance for Bidding 3.1.1 Bidding Documents 3.1.2 Issuance to Bidders 3.2 Bidding Phase 3.2.1 Addenda 3.2.2 Issuance and Receipt of Addenda <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 3.2.3 Addenda Format <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 3.2.4 Responding to Questions from Bidders 3.2.5 Pre-bid Conferences 3.3 Contract Award and Construction 3.3.1 Conforming Documents <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 3.3.2 Specification Revisions 3.4 Final Results <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Appendices Appendix A: Additional ASCE Guidance <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Appendix B: Definitions <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Appendix C: Codes and Standards <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Appendix D: Sample Specification <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | Appendix E: Specification Engineer\u2014Job Descriptions <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Appendix F: Specification Language Problems <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Appendix G: Checklist for Writing Specifications <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Bibliography <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Index A B C D E P S T <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Preparation of Construction Specifications for Civil Projects<\/b><\/p>\n |