{"id":74235,"date":"2024-10-17T16:47:37","date_gmt":"2024-10-17T16:47:37","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/fema-p758-2010\/"},"modified":"2024-10-24T19:14:32","modified_gmt":"2024-10-24T19:14:32","slug":"fema-p758-2010","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/fema\/fema-p758-2010\/","title":{"rendered":"FEMA P758 2010"},"content":{"rendered":"
0<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Substantial Improvement\/Substantial Damage Desk Reference <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Preface <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Acknowledgments <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Table of Contents <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 1 Introduction 1.1 Overview <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 1.2 What is Covered in This Desk Reference? <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 1.3 Relevant Requirements 1.4 Answers to Questions About SI\/SD <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 1.5 Where to Get Help <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 2 The NFIP: Roles and Responsibilities 2.1 Purposes and Overview of the NFIP <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 2.2 The Community’s Role <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 2.3 The State’s Role <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 2.4 The Federal Role <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 3 NFIP Substantial Improvement and Substantial Damage: Requirements and Definitions 3.1 Overview 3.2 Introduction to the SI\/SD Requirements <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 3.3 NFIP Regulations for SI\/SD <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 3.4 Selected Definitions and Terms <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 3.4.1 Definitions: NFIP Regulations <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 3.4.2 Comparison of Definitions and Terms: NFIP and I-Codes <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 4 Making Substantial Improvement and Substantial Damage Determinations 4.1 Overview <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 4.2 Accuracy and Verification 4.3 Making SI\/SD Determinations <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 4.3.1 SI\/SD Provisions in the 2006 and 2009 I-Codes <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 4.4 Determining Costs of Improvements and Costs to Repair <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 4.4.1 Costs That Must be Included in SI\/SD Determinations <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 4.4.2 Costs That May be Excluded from SI\/SD Determinations 4.4.3 Acceptable Sources of Cost Information <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 4.4.4 Estimates for Donated or Discounted Materials 4.4.5 Estimates of Owner and Volunteer Labor <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 4.4.6 Demolition and Construction Debris Disposal 4.4.7 Clean-up and Trash Removal 4.4.8 Costs to Correct Existing Health, Safety, and Sanitary Code Violations <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 4.5 Determining Market Value <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 4.5.1 Professional Property Appraisals <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 4.5.2 Adjusted Assessed Value <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 4.5.3 Actual Cash Value 4.5.4 Qualified Estimates <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 5 Administering Substantial Improvement and Substantial Damage Requirements 5.1 Overview 5.2 Community Responsibilities <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 5.3 Property Owner\/Applicant Responsibilities <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 5.4 Important Community Actions <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 5.5 Informing the Public 5.5.1 Permit Application Forms 5.5.2 Websites and Handouts <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 5.6 Administering the SI\/SD Requirements 5.6.1 Combinations of Types of Work <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 5.6.2 Phased Improvements <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 5.6.3 Incremental Repair of Damaged Buildings 5.6.4 Damaged Buildings <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 5.6.5 Special Circumstances (Damaged Buildings) <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 5.6.6 Appeals of Decisions 5.6.7 Variances to the Requirements <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | 5.6.8 Floodways <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 5.6.9 V Zones 5.6.10 Coastal Barrier Resource Areas <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 5.6.11 Revisions of the FIRM 5.6.12 Inspections <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 5.6.13 Enforcement and Violations <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 5.6.14 Recordkeeping <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 5.6.15 Issuing SI\/SD Determination Letters 5.6.16 Rescinding SI\/SD Determinations <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 5.7 Exceeding NFIP Minimum Requirements 5.7.1 Community Rating System <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 5.7.2 Lower Threshold for SI\/SD <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | 5.7.3 Cumulative SI\/SD <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | 5.8 Recommendations to Improve Flood Resistance <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 6 Factors to Consider and Illustrations of Substantial Improvement and Repair of Substantial Damage 6.1 Overview 6.2 Factors to Consider When Evaluating Permit Applications forImprovements and Repairs 6.2.1 Pre-FIRM or Post-FIRM <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | 6.2.2 A Zone or V Zone <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | 6.2.3 More Than One Flood Zone 6.2.4 Residential or Non-Residential 6.3 Bringing Substantially Improved and Substantially DamagedBuildings into Compliance <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | 6.3.1 Lowest Floor Elevations <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | 6.3.2 Enclosures <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | 6.3.3 Basements 6.3.4 Utility and Building Service Equipment <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | 6.3.5 Flood Damage-Resistant Materials 6.3.6 Making Buildings Reasonably Safe from Flooding <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 6.4 Illustrations of Improvements and Repairs <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | 6.4.1 Rehabilitation and Remodeling <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 6.4.2 Lateral Additions <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | 6.4.3 Vertical Additions <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | 6.4.4 Repair, Reinforce, or Replace Foundations <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | 6.4.5 Repair of Damaged Buildings 6.4.6 Reconstruction of Demolished or Destroyed Buildings 6.4.7 Work on Post-FIRM Buildings 6.4.8 Work on Buildings Where Flood Maps Have Been Revised <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | 6.5 Requirements for Certain Structures 6.5.1 Historic Structures <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | 6.5.2 Manufactured Homes <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | 6.5.3 Accessory Structures and Certain AgriculturalStructures <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | 6.6 NFIP Flood Insurance Implications <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 7 Substantial Damage in the Disaster Recovery Environment 7.1 Overview 7.2 Preparing for Post-Disaster Recovery <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | 7.2.1 Sources of Assistance <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | 7.3 Assessing Building Damage 7.3.1 Preliminary Damage Assessments 7.3.2 Rapid Evaluations and Detailed Safety <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 7.4 Using Estimates of Repair Costs and Market Values to Screen for Substantial Damage <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | 7.4.1 Insurance Estimates of Repair Costs <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | 7.4.2 Unadjusted Assessed Values as Estimates of Market Values 7.4.3 Replacement Cost Values as Estimates of Market Values 7.5 Damage Assessments for Substantial Damage Determinations <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | 7.5.1 FEMA’s Substantial Damage Estimator Software <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | 7.6 Increased Cost of Compliance Coverage <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | 7.7 Post-Disaster Permits and Inspections 7.8 Appeals and Variances <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | 7.9 Post-Disaster Communications with Property Owners 7.9.1 Information About Clean-up and Repairs 7.9.2 Information About Permits <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 7.9.3 Information About Increased Cost of Compliance Coverage 7.9.4 Interactions with the Public During Damage Assessments <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | 7.9.5 Providing Determination Letters to Owners <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | 8 Mitigation Projects 8.1 Overview 8.2 Mitigation Planning <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | 8.3 Types of Flood Mitigation Projects 8.3.1 Identifying Flood Mitigation Projects <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | 8.3.2 Property Acquisition\/Demolition and Relocation 8.3.3 Building Elevation <\/td>\n<\/tr>\n | ||||||
124<\/td>\n | 8.3.4 Relocation 8.3.5 Floodproofing for Non-Residential Structures or Historic Structures 8.3.6 Other Types of Projects 8.4 FEMA’s Mitigation Grant Programs <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | 8.4.1 Elements Common to All Grant Programs 8.4.2 Pre-Disaster Mitigation Program <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | 8.4.3 Hazard Mitigation Grant Program <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | 8.4.4 Flood Mitigation Assistance Program 8.4.5 Repetitive Flood Claims Program <\/td>\n<\/tr>\n | ||||||
128<\/td>\n | 8.4.6 Severe Repetitive Loss Program <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | 8.5 Additional Information <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | A FEMA Regional Offices, NFIP State Coordinating Agencies, and State Hazard Mitigation Offices FEMA Offices <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | NFIP State Coordinating Agencies <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | State Hazard Mitigation Offices <\/td>\n<\/tr>\n | ||||||
143<\/td>\n | B References <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | C Glossary and Acronyms Glossary <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | Acronyms <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | D Sample Notices to Property Owners, Worksheet, and Other Materials <\/td>\n<\/tr>\n | ||||||
167<\/td>\n | E Sample Letters of Determination <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" FEMA P-758 – Substantial Improvement\/Substantial Damage Desk Reference<\/b><\/p>\n |