{"id":460168,"date":"2024-10-20T10:08:10","date_gmt":"2024-10-20T10:08:10","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-ts-185712024\/"},"modified":"2024-10-26T18:44:06","modified_gmt":"2024-10-26T18:44:06","slug":"bsi-pd-iso-ts-185712024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-ts-185712024\/","title":{"rendered":"BSI PD ISO\/TS 18571:2024"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4 Abbreviated terms and symbols 4.1 Abbreviated terms 4.2 General 4.3 Corridor score <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4.4 Phase, magnitude and slope scores 4.4.1 General 4.4.2 Phase score 4.4.3 Magnitude score <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.4.4 Slope score 4.5 Overall ISO rating <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5 General data requirements 6 ISO metric 6.1 General 6.2 Calculation of the overall ISO rating <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.3 Corridor score 6.3.1 General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6.3.2 Calculation <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 6.3.3 Step by step procedure 6.4 Phase, magnitude and slope scores <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.4.1 Phase score <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.4.2 Magnitude score <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.4.3 Slope score <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.4.4 Step by step procedure 7 Meaning of the overall ISO rating <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8 Pre-processing of the data 8.1 General 8.2 Synchronization of the signals 8.3 Sampling rate 8.4 Filtering <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8.5 Interval of evaluation <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 9 Limitations 9.1 General 9.2 Type of signals 9.3 Metric validation <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 9.4 Meaning of the results 9.5 Multiple responses <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex A (informative) Case studies <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Road vehicles. Objective rating metric for non-ambiguous signals<\/b><\/p>\n |