{"id":457234,"date":"2024-10-20T09:50:13","date_gmt":"2024-10-20T09:50:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-933-2023\/"},"modified":"2024-10-26T18:17:00","modified_gmt":"2024-10-26T18:17:00","slug":"ieee-933-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-933-2023\/","title":{"rendered":"IEEE 933-2023"},"content":{"rendered":"
Revision Standard – Active. Guidelines for the definition of a reliability program at nuclear power generating stations and other nuclear facilities are provided. The document emphasizes reliability programs during the operating phase of such stations; however, the general approach applies to all phases of the nuclear power generating station life cycle (e.g., design, construction, start-up, operating, and decommissioning).<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 933\u2122-2023 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1.\u2002Overview <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 1.1\u2002Scope 1.2\u2002Purpose 1.3\u2002Word usage 2.\u2002Normative references <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3.\u2002Definitions, acronyms, and abbreviations 3.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 3.2\u2002Acronyms and abbreviations 4.\u2002Program elements 4.1\u2002General <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.2\u2002Performance monitoring <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.3\u2002Performance evaluation <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 4.4\u2002Problem prioritization <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 4.5\u2002Problem analysis and corrective action recommendation <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 4.6\u2002Corrective action implementation and feedback <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.\u2002Major programmatic resources 5.1\u2002General <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 5.2\u2002Operations <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 5.3\u2002Maintenance 5.4\u2002Engineering <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 5.5\u2002Safety 5.6\u2002Licensing <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 5.7\u2002Quality assurance 5.8\u2002Training 5.9\u2002Procurement <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex\u00a0A (informative) Reliability program management A.1\u2002General A.2\u2002Planning <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | A.3\u2002Integration A.4\u2002Organization <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | A.5\u2002Control A.6\u2002Leadership <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex\u00a0B (informative) Case study\u2014Application of Excelsior Power Company\u2019s reliability program plan to service water pumps B.1\u2002Overview B.2\u2002Service water pump performance <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex\u00a0C (informative) Sample RAM specification for replacement service water pumps <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Annex\u00a0D (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for the Definition of Reliability Program Plans for Nuclear Generating Stations and Other Nuclear Facilities (Approved Draft)<\/b><\/p>\n |