{"id":431567,"date":"2024-10-20T07:28:56","date_gmt":"2024-10-20T07:28:56","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bicsi-g1-2017\/"},"modified":"2024-10-26T14:13:13","modified_gmt":"2024-10-26T14:13:13","slug":"bicsi-g1-2017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bicsi\/bicsi-g1-2017\/","title":{"rendered":"BICSI G1 2017"},"content":{"rendered":"
BICSI G1-17 is the first in a series of standards focused on the construction and installation of ICT cabling infrastructure within OSP pathways and applications. BICSI G1 is designed to provide general information relevant to all OSP construction and pathways, with additional standards under development providing in-depth detail on the specific pathways and associated tasks. Given the nature of development, this standard has been placed under continuous revision, so that as additional material is developed and approved, content within this standard can be modified to expand areas not present or remove conflicts if they arise.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | TABLE OF CONTENTS <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | INDEX OF TABLES <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 1 Introduction 1.1 Purpose 1.2 Categories of Criteria 2 Scope <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3 Required Standards and Documents 3.1 Standards 3.2 Regulatory Documents 3.2.1 United States Code of Federal Regulations (CFR) <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4 Definitions, Acronyms, Abbreviations, and Units of Measurement 4.1 Definitions <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 4.2 Acronyms and Abbreviations <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4.3 Units of Measurement <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5 General Safety Considerations 5.1 Underground and Buried Utilities Locates 5.1.1 Overview 5.1.2 American Public Works Association (APWA) Uniform Color Code (ANSI Z535.1) Table 5-1 APWA Uniform Color Code (ANSI Z535.1) 5.2 Pre Mobilization Project and Safety Briefing <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.3 Initial Job Site Arrival Assessment 5.4 On Site Set Up 5.5 On Site Work Tasks 5.6 Site Conditions 5.7 Personal Protective Equipment (PPE) 5.7.1 Hardhat 5.7.2 Hand and Foot Protection 5.7.3 Eye and Face Protection 5.7.4 Hearing Protection Type <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.7.5 Clothing or Non-conductive Covering 5.8 Confined Spaces 5.8.1 Requirements 5.9 Qualifications of Personnel 5.9.1 Overview <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.10 Energized Electrical Equipment 5.10.1 Approach Distances Table 5-2 Approach Distances to Exposed Energized Overhead Power Lines and Parts 5.10.2 Climbing Spaces <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6 Tools 6.1 Overview 6.2 Tools \u2013 General 6.2.1 Digging 6.2.2 Hardware and Cable Installation 6.2.3 Power Tools 6.3 Commonly Used Tools for Aerial Plant 6.3.1 Pole Setting Tools 6.3.2 Hardware and Cable Installation <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.3.3 Guy, Messenger Installation 6.3.4 Cable Hanging and Lashing 6.3.5 Power Tools 6.4 Commonly Used Tools for Underground and Direct-Buried Plant Plant 6.4.1 Digging Equipment 6.4.2 Power Tools 6.4.3 Safety Equipment <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 7 Aerial OSP Installation 7.1 General Aerial Safety Considerations 7.1.1 Job Site Arrival Safety Size Up 7.1.2 On Site Set Up 7.1.3 On Site Work Tasks 7.1.4 Work Site Demobilization 7.2 Aerial Pathway Safety Considerations 7.2.1 Rigging 7.2.2 Bucket Truck, Auger Truck, Boom Truck 7.2.3 Pole Climbing <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 7.2.4 Ladders 7.3 Underground and Direct-Buried Pathway Safety Considerations <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 8 Bonding and Grounding 8.1 Overview 8.2 Grounding 8.2.1 Overview 8.2.2 Recommendations 8.3 Bonding 8.3.1 Overview 8.3.2 Requirements <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 9 Right of Way 9.1 Overview 9.2 Types of Right of Way 9.3 Verification <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 9.4 Permits <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 10 Drawings and Specifications (Construction Documents) 10.1 Overview 10.2 Elements 10.3 Requirements <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Appendix A One Call Center Information (Informative) A.1 One Call Centers <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | A.2 Click Before You Dig A.3 Locations Without a Once Call Center <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Appendix B Commonly Encountered AHJ Definitions (Informative) B.1 Introduction B.2 Code of Federal Regulations (CFR) Table B-1 Terms from Title 29 Labor, Part 1910 Occupational Safety and Health Administration <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Appendix C Related Documents (Informative) <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BICSI G1-17, ICT Outside Plant Construction and Installation: General Practices<\/b><\/p>\n |