{"id":424915,"date":"2024-10-20T06:54:03","date_gmt":"2024-10-20T06:54:03","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iec-61784-5-202018-2\/"},"modified":"2024-10-26T12:59:35","modified_gmt":"2024-10-26T12:59:35","slug":"bs-en-iec-61784-5-202018-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iec-61784-5-202018-2\/","title":{"rendered":"BS EN IEC 61784-5-20:2018"},"content":{"rendered":"
This part of IEC 61784 specifies the installation profiles for CPF 20 (ADS-net1<\/sup>).<\/p>\n The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018.<\/p>\n Industrial communication networks. Profiles – Installation of fieldbuses. Installation profiles for CPF 20<\/b><\/p>\nPDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 2<\/td>\n undefined <\/td>\n<\/tr>\n \n 5<\/td>\n Annex ZA(normative)Normative references to international publicationswith their corresponding European publications <\/td>\n<\/tr>\n \n 7<\/td>\n CONTENTS <\/td>\n<\/tr>\n \n 9<\/td>\n FOREWORD <\/td>\n<\/tr>\n \n 11<\/td>\n INTRODUCTION
Figure 1 \u2013 Standards relationships <\/td>\n<\/tr>\n\n 12<\/td>\n 1 Scope
2 Normative references
3 Terms, definitions, symbols and abbreviations
4 CPF 20: Overview of installation profiles <\/td>\n<\/tr>\n\n 13<\/td>\n 5 Installation profile conventions
6 Conformance to installation profiles <\/td>\n<\/tr>\n\n 15<\/td>\n Annex A (normative)CP 20\/1 (ADS-net\/\u03bc\u03a3NETWORK-1000) specific installation profile
A.1 Installation profile scope
A.2 Normative references
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
A.3.2 Abbreviated terms
A.3.3 Conventions for installation profiles <\/td>\n<\/tr>\n\n 16<\/td>\n A.4 Installation planning
A.4.1 General
A.4.2 Planning requirements
A.4.3 Network capabilities <\/td>\n<\/tr>\n\n 17<\/td>\n Tables
Table A.1 \u2013 Network characteristics for balanced cabling based on Ethernet <\/td>\n<\/tr>\n\n 18<\/td>\n A.4.4 Selection and use of cabling components
Table A.2 \u2013 Network characteristics for optical fibre cabling <\/td>\n<\/tr>\n\n 19<\/td>\n Table A.3 \u2013 Information relevant to copper cable: fixed cables
Table A.4 \u2013 Information relevant to copper cable: cords <\/td>\n<\/tr>\n\n 20<\/td>\n Table A.5 \u2013 Information relevant to optical fibre cables
Table A.6 \u2013 Connectors for balanced cabling CPs based on Ethernet <\/td>\n<\/tr>\n\n 21<\/td>\n Table A.7 \u2013 Optical fibre connecting hardware
Table A.8 \u2013 Relationship between FOC and fibre types (CP 20\/1) <\/td>\n<\/tr>\n\n 25<\/td>\n A.4.5 Cabling planning documentation
A.4.6 Verification of cabling planning specification
A.5 Installation implementation
A.5.1 General requirements
A.5.2 Cable installation
Table A.9 \u2013 Parameters for balanced cables <\/td>\n<\/tr>\n\n 26<\/td>\n Table A.10 \u2013 Parameters for silica optical fibre cables <\/td>\n<\/tr>\n \n 27<\/td>\n A.5.3 Connector installation
A.5.4 Terminator installation
A.5.5 Device installation
A.5.6 Coding and labelling <\/td>\n<\/tr>\n\n 28<\/td>\n A.5.7 Earthing and bonding of equipment and devices and shield cabling
A.5.8 As-implemented cabling documentation
A.6 Installation verification and installation acceptance test
A.6.1 General
A.6.2 Installation verification <\/td>\n<\/tr>\n\n 30<\/td>\n A.6.3 Installation acceptance test
A.7 Installation administration
A.8 Installation maintenance and installation troubleshooting <\/td>\n<\/tr>\n\n 31<\/td>\n Annex B (normative)CP 20\/2 (ADS-net\/NX) specific installation profile
B.1 Installation profile scope
B.2 Normative references
B.3 Installation profile terms, definitions, and abbreviated terms
B.3.1 Terms and definitions
B.3.2 Abbreviated terms
B.3.3 Conventions for installation profiles <\/td>\n<\/tr>\n\n 32<\/td>\n B.4 Installation planning
B.4.1 General
B.4.2 Planning requirements
B.4.3 Network capabilities <\/td>\n<\/tr>\n\n 33<\/td>\n Table B.1 \u2013 Network characteristics for balanced cabling based on Ethernet <\/td>\n<\/tr>\n \n 34<\/td>\n B.4.4 Selection and use of cabling components
Table B.2 \u2013 Network characteristics for optical fibre cabling <\/td>\n<\/tr>\n\n 35<\/td>\n Table B.3 \u2013 Information relevant to copper cable: fixed cables
Table B.4 \u2013 Information relevant to copper cable: cords <\/td>\n<\/tr>\n\n 36<\/td>\n Table B.5 \u2013 Information relevant to optical fibre cables
Table B.6 \u2013 Connectors for balanced cabling CPs based on Ethernet <\/td>\n<\/tr>\n\n 37<\/td>\n Table B.7 \u2013 Optical fibre connecting hardware
Table B.8 \u2013 Relationship between FOC and fibre types (CP 20\/2) <\/td>\n<\/tr>\n\n 41<\/td>\n B.4.5 Cabling planning documentation
B.4.6 Verification of cabling planning specification
B.5 Installation implementation
B.5.1 General requirements
B.5.2 Cable installation
Table B.9 \u2013 Parameters for balanced cables <\/td>\n<\/tr>\n\n 42<\/td>\n Table B.10 \u2013 Parameters for silica optical fibre cables <\/td>\n<\/tr>\n \n 43<\/td>\n B.5.3 Connector installation
B.5.4 Terminator installation
B.5.5 Device installation
B.5.6 Coding and labelling <\/td>\n<\/tr>\n\n 44<\/td>\n B.5.7 Earthing and bonding of equipment and devices and shield cabling
B.5.8 As-implemented cabling documentation
B.6 Installation verification and installation acceptance test
B.6.1 General
B.6.2 Installation verification <\/td>\n<\/tr>\n\n 46<\/td>\n B.6.3 Installation acceptance test
B.7 Installation administration
B.8 Installation maintenance and installation troubleshooting <\/td>\n<\/tr>\n\n 47<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" \n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2019<\/td>\n 48<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":424925,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[672,2641],"product_tag":[],"class_list":{"0":"post-424915","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-35-100-40","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/424915","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/424925"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=424915"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=424915"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=424915"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}