{"id":244514,"date":"2024-10-19T16:03:57","date_gmt":"2024-10-19T16:03:57","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-61784-5-82013\/"},"modified":"2024-10-25T11:03:09","modified_gmt":"2024-10-25T11:03:09","slug":"bs-en-61784-5-82013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-61784-5-82013\/","title":{"rendered":"BS EN 61784-5-8:2013"},"content":{"rendered":"

This part of IEC 61784-5 specifies the installation profiles for CPF 8 ( CC-Link 1).<\/p>\n

The installation profiles are specified in the annex es. These annexes are read in conjunction with IEC 61918:2013.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
6<\/td>\nEnglish
CONTENTS <\/td>\n<\/tr>\n
16<\/td>\nINTRODUCTION
Figures
Figure\u00a01 \u2013 Standards relationships <\/td>\n<\/tr>\n
17<\/td>\n1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
4 CPF 8: Overview of installation profiles <\/td>\n<\/tr>\n
18<\/td>\n5 Installation profile conventions
6 Conformance to installation profiles <\/td>\n<\/tr>\n
20<\/td>\nAnnex A (normative) CP 8\/1 and CP 8\/2 (CC-Link\/V1 and CC-Link\/V2) specific installation profile
A.1 Installation profile scope
A.2 Normative references
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
A.3.2 Abbreviated terms
A.3.3 Conventions for installation profiles
A.4 Installation planning
A.4.1 General
A.4.1.1 Objective
A.4.1.2 Cabling in industrial premises
A.4.1.3 The planning process
A.4.1.4 Specific requirements for CPs <\/td>\n<\/tr>\n
21<\/td>\nA.4.1.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
A.4.2 Planning requirements
A.4.2.1 Safety
A.4.2.2 Security
A.4.2.3 Environmental considerations and EMC
A.4.2.4 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
A.4.3 Network capabilities
A.4.3.1 Network topology <\/td>\n<\/tr>\n
22<\/td>\nA.4.3.2 Network characteristics
Figure A.1 \u2013 Pass-through connector configuration
Figure A.2 \u2013 Bus t-branch topology <\/td>\n<\/tr>\n
23<\/td>\nA.4.4 Selection and use of cabling components
A.4.4.1 Cable selection
Table A.1 \u2013 Basic network characteristics for balanced cabling not based on Ethernet
Table A.2 \u2013 Bus t-branch network characteristics <\/td>\n<\/tr>\n
24<\/td>\nTable A.3 \u2013 Information relevant to copper cable: fixed cables <\/td>\n<\/tr>\n
25<\/td>\nA.4.4.2 Connecting hardware selection
Figure A.3 \u2013 Wiring
Table A.4 \u2013 Connectors for copper cabling CPs not based on Ethernet <\/td>\n<\/tr>\n
26<\/td>\nA.4.4.3 Connections within a channel\/permanent link
A.4.4.4 Terminators
A.4.4.5 Device location and connection <\/td>\n<\/tr>\n
27<\/td>\nA.4.4.6 Coding and labelling
A.4.4.7 Earthing and bonding of equipment and devices and shielded cabling <\/td>\n<\/tr>\n
28<\/td>\nA.4.4.8 Storage and transportation of cables
A.4.4.9 Routing of cables
A.4.4.10 Separation of circuit
A.4.4.11 Mechanical protection of cabling components
A.4.4.12 Installation in special areas
A.4.5 Cabling planning documentation
A.4.6 Verification of cabling planning specification
A.5 Installation implementation
A.5.1 General requirements
A.5.1.1 Common description
A.5.1.2 Installation of CPs
A.5.1.3 Installation of generic cabling in industrial premises
A.5.2 Cable installation
A.5.2.1 General requirements for all cabling types <\/td>\n<\/tr>\n
29<\/td>\nA.5.2.2 Installation and routing
A.5.2.3 Specific requirements for CPs
A.5.2.4 Specific requirements for wireless installation
A.5.2.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
A.5.3 Connector installation
A.5.3.1 Common description
Table A.5 \u2013 Parameters for balanced cables <\/td>\n<\/tr>\n
30<\/td>\nA.5.3.2 Shielded connectors
A.5.3.3 Unshielded connectors
A.5.3.4 Specific requirements for CPs
A.5.3.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
A.5.4 Terminator installation
A.5.4.1 Common description
A.5.4.2 Specific requirements for CPs
A.5.5 Device installation
A.5.6 Coding and labelling
A.5.6.1 Common description
A.5.6.2 Specific requirements for CPs
A.5.7 Earthing and bonding of equipment and devices and shield cabling
A.5.7.1 Common description
A.5.7.2 Bonding and earthing of enclosures and pathways
A.5.7.3 Earthing methods
Table A.6 \u2013 Cable conductor assignments <\/td>\n<\/tr>\n
31<\/td>\nA.5.7.4 Shield termination methods
A.5.7.5 Specific requirements for CPs
A.5.7.6 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
A.5.8 As-implemented cabling documentation
A.6 Installation verification and installation acceptance test
A.6.1 General
A.6.2 Installation verification
A.6.2.1 General
A.6.2.2 Verification according to cabling planning documentation
A.6.2.3 Verification of earthing and bonding
A.6.2.4 Verification of shield earthing
A.6.2.5 Verification of cabling system
A.6.2.6 Cable selection verification <\/td>\n<\/tr>\n
32<\/td>\nA.6.2.7 Connector verification
A.6.2.8 Connection verification
A.6.2.9 Terminators verification
A.6.2.10 Coding and labelling verification
A.6.2.11 Verification report
A.6.3 Installation acceptance test
A.6.3.1 General
A.6.3.2 Acceptance test of Ethernet-based cabling
A.6.3.3 Acceptance test of non-Ethernet-based cabling
A.6.3.4 Specific requirements for wireless installation
A.6.3.5 Acceptance test report <\/td>\n<\/tr>\n
33<\/td>\nA.7 Installation administration
A.8 Installation maintenance and installation troubleshooting <\/td>\n<\/tr>\n
34<\/td>\nAnnex B (normative) CP 8\/3 (CC-Link\/LT) specific installation profile
B.1 Installation profile scope
B.2 Normative references
B.3 Installation profile terms, definitions, and abbreviated terms
B.3.1 Terms and definitions
B.3.2 Abbreviated terms
B.3.3 Conventions for installation profiles
B.4 Installation planning
B.4.1 General
B.4.1.1 Objective
B.4.1.2 Cabling in industrial premises
B.4.1.3 The planning process
B.4.1.4 Specific requirements for CPs <\/td>\n<\/tr>\n
35<\/td>\nB.4.1.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
B.4.2 Planning requirements
B.4.2.1 Safety
B.4.2.2 Security
B.4.2.3 Environmental considerations and EMC
B.4.2.4 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
B.4.3 Network capabilities
B.4.3.1 Network topology <\/td>\n<\/tr>\n
36<\/td>\nB.4.3.2 Network characteristics
Figure B.1 \u2013 Powered network topology
Figure B.2 \u2013 Bus t-branch topology <\/td>\n<\/tr>\n
37<\/td>\nTables
Table B.1 \u2013 Basic network characteristics for balanced cabling not based on Ethernet
Table B.2 \u2013 CP 8\/3 additional topology length limits <\/td>\n<\/tr>\n
38<\/td>\nB.4.4 Selection and use of cabling components
B.4.4.1 Cable selection
Figure B.3 \u2013 Flat cable cross section with key
Figure B.4 \u2013 Flat cable cross section without key
Figure B.5 \u2013 Flat cable polarity marking <\/td>\n<\/tr>\n
39<\/td>\nTable B.3 \u2013 Information relevant to copper cable: flat cable <\/td>\n<\/tr>\n
40<\/td>\nB.4.4.2 Connecting hardware selection
Figure B.6 \u2013 Wiring <\/td>\n<\/tr>\n
41<\/td>\nFigure B.7 \u2013 Flat cable connector and terminal cover <\/td>\n<\/tr>\n
42<\/td>\nB.4.4.3 Connections within a channel\/permanent link
Table B.4 \u2013 Connectors for copper cabling CPs not based on Ethernet <\/td>\n<\/tr>\n
43<\/td>\nB.4.4.4 Terminators
B.4.4.5 Device location and connection
B.4.4.6 Coding and labelling
B.4.4.7 Earthing and bonding of equipment and devices and shielded cabling <\/td>\n<\/tr>\n
44<\/td>\nB.4.4.8 Storage and transportation of cables
B.4.4.9 Routing of cables
B.4.4.10 Separation of circuit
B.4.4.11 Mechanical protection of cabling components
B.4.4.12 Installation in special areas <\/td>\n<\/tr>\n
45<\/td>\nB.4.5 Cabling planning documentation
B.4.6 Verification of cabling planning specification
B.5 Installation implementation
B.5.1 General requirements
B.5.1.1 Common description
B.5.1.2 Installation of CPs
B.5.1.3 Installation of generic cabling in industrial premises
B.5.2 Cable installation
B.5.2.1 General requirements for all cabling types
Table B.5 \u2013 Parameters for balanced cables <\/td>\n<\/tr>\n
46<\/td>\nB.5.2.2 Installation and routing
B.5.2.3 Specific requirements for CPs
B.5.2.4 Specific requirements for wireless installation
B.5.2.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
B.5.3 Connector installation
B.5.3.1 Common description
B.5.3.2 Shielded connectors
Table B.6 \u2013 Flat cable conductor assignments <\/td>\n<\/tr>\n
47<\/td>\nB.5.3.3 Unshielded connectors
B.5.3.4 Specific requirements for CPs
B.5.3.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
B.5.4 Terminator installation
B.5.4.1 Common description
B.5.4.2 Specific requirements for CPs
B.5.5 Device installation
B.5.6 Coding and labelling
B.5.7 Earthing and bonding of equipment and devices and shield cabling
B.5.7.1 Common description
B.5.7.2 Bonding and earthing of enclosures and pathways
B.5.7.3 Earthing methods
B.5.7.4 Shield termination methods
B.5.7.5 Specific requirements for CPs <\/td>\n<\/tr>\n
48<\/td>\nB.5.7.6 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
B.5.8 As-implemented cabling documentation
B.6 Installation verification and installation acceptance test
B.6.1 General
B.6.2 Installation verification
B.6.2.1 General
B.6.2.2 Verification according to cabling planning documentation
B.6.2.3 Verification of earthing and bonding
B.6.2.4 Verification of shield earthing
B.6.2.5 Verification of cabling system
B.6.2.6 Cable selection verification
B.6.2.7 Connector verification
B.6.2.8 Connection verification <\/td>\n<\/tr>\n
49<\/td>\nB.6.2.9 Terminators verification
B.6.2.10 Coding and labelling verification
B.6.2.11 Verification report
B.6.3 Installation acceptance test
B.6.3.1 General
B.6.3.2 Acceptance test of Ethernet-based cabling
B.6.3.3 Acceptance test of non-Ethernet-based cabling
B.6.3.4 Specific requirements for wireless installation
B.6.3.5 Acceptance test report
B.7 Installation administration
B.8 Installation maintenance and installation troubleshooting <\/td>\n<\/tr>\n
50<\/td>\nAnnex C (normative) CP 8\/4 (CC-Link IE Controller Network) specific installation profile
C.1 Installation profile scope
C.2 Normative references
C.3 Installation profile terms, definitions, and abbreviated terms
C.3.1 Terms and definitions
C.3.2 Abbreviated terms
C.3.3 Conventions for installation profiles
C.4 Installation planning
C.4.1 General
C.4.1.1 Objective
C.4.1.2 Cabling in industrial premises
C.4.1.3 The planning process
C.4.1.4 Specific requirements for CPs
C.4.1.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
C.4.2 Planning requirements
C.4.2.1 Safety <\/td>\n<\/tr>\n
51<\/td>\nC.4.2.2 Security
C.4.2.3 Environmental considerations and EMC
C.4.2.4 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
C.4.3 Network capabilities
C.4.3.1 Network topology
C.4.3.2 Network characteristics <\/td>\n<\/tr>\n
52<\/td>\nC.4.4 Selection and use of cabling components
C.4.4.1 Cable selection
Table C.1 \u2013 Network characteristics for optical fibre cabling <\/td>\n<\/tr>\n
53<\/td>\nC.4.4.2 Connecting hardware selection
Table C.2 \u2013 Information relevant to optical fibre cables <\/td>\n<\/tr>\n
54<\/td>\nC.4.4.3 Connections within a channel\/permanent link
Table C.3 \u2013 Optical fibre connecting hardware
Table C.4 \u2013 Relationship between FOC and fibre types (CP 8\/4) <\/td>\n<\/tr>\n
55<\/td>\nC.4.4.4 Terminators
C.4.4.5 Device location and connection
C.4.4.6 Coding and labelling
C.4.4.7 Earthing and bonding of equipment and devices and shielded cabling <\/td>\n<\/tr>\n
56<\/td>\nC.4.4.8 Storage and transportation of cables
C.4.4.8.1 Common description
C.4.4.8.2 Specific requirements for CPs
C.4.4.8.3 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
C.4.4.9 Routing of cables
C.4.4.10 Separation of circuit
C.4.4.11 Mechanical protection of cabling components
C.4.4.11.1 Common description
C.4.4.11.2 Specific requirements for CPs <\/td>\n<\/tr>\n
57<\/td>\nC.4.4.11.3 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
C.4.4.12 Installation in special areas
C.4.4.12.1 Common description
C.4.4.12.2 Specific requirements for CPs
C.4.4.12.3 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
C.4.5 Cabling planning documentation
C.4.5.1 Common description
C.4.5.2 Cabling planning documentation for CPs
C.4.5.3 Network certification documentation
C.4.5.4 Cabling planning documentation for generic cabling in accordance with ISO\/IEC 24702
C.4.6 Verification of cabling planning specification
C.5 Installation implementation
C.5.1 General requirements
C.5.1.1 Common description
C.5.1.2 Installation of CPs
C.5.1.3 Installation of generic cabling in industrial premises
C.5.2 Cable installation
C.5.2.1 General requirements for all cabling types <\/td>\n<\/tr>\n
58<\/td>\nC.5.2.2 Installation and routing
C.5.2.3 Specific requirements for CPs
C.5.2.4 Specific requirements for wireless installation
Table C.5 \u2013 Parameters for silica optical fibre cables <\/td>\n<\/tr>\n
59<\/td>\nC.5.2.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
C.5.3 Connector installation
C.5.3.1 Common description
C.5.3.2 Shielded connectors
C.5.3.3 Unshielded connectors
C.5.3.4 Specific requirements for CPs
C.5.3.5 Specific requirements for wireless installation
C.5.4 Terminator installation
C.5.5 Device installation
C.5.5.1 Common description
C.5.5.2 Specific requirements for CPs
C.5.6 Coding and labelling
C.5.6.1 Common description
C.5.6.2 Specific requirements for CPs
C.5.7 Earthing and bonding of equipment and devices and shield cabling
C.5.7.1 Common description
C.5.7.2 Bonding and earthing of enclosures and pathways
C.5.7.3 Earthing methods <\/td>\n<\/tr>\n
60<\/td>\nC.5.7.4 Shield termination methods
C.5.7.5 Specific requirements for CPs
C.5.7.6 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
C.5.8 As-implemented cabling documentation
C.6 Installation verification and installation acceptance test
C.6.1 General
C.6.2 Installation verification
C.6.2.1 General
C.6.2.2 Verification according to cabling planning documentation
C.6.2.3 Verification of earthing and bonding
C.6.2.4 Verification of shield earthing
C.6.2.5 Verification of cabling system
C.6.2.6 Cable selection verification <\/td>\n<\/tr>\n
61<\/td>\nC.6.2.7 Connector verification
C.6.2.8 Connection verification
C.6.2.9 Terminators verification
C.6.2.10 Coding and labelling verification
C.6.2.11 Verification report
C.6.3 Installation acceptance test
C.6.3.1 General
C.6.3.2 Acceptance test of Ethernet based cabling
C.6.3.3 Acceptance test of non Ethernet based cabling
C.6.3.4 Specific requirements for wireless installation <\/td>\n<\/tr>\n
62<\/td>\nC.6.3.5 Acceptance test report
C.7 Installation administration
C.8 Installation maintenance and installation troubleshooting <\/td>\n<\/tr>\n
63<\/td>\nAnnex D (normative) CP 8\/5 (CC-Link IE Field Network) specific installation profile
D.1 Installation profile scope
D.2 Normative references
D.3 Installation profile terms, definitions, and abbreviated terms
D.3.1 Terms and definitions
D.3.2 Abbreviated terms
D.3.3 Conventions for installation profiles
D.4 Installation planning
D.4.1 General
D.4.1.1 Objective
D.4.1.2 Cabling in industrial premises
D.4.1.3 The planning process
D.4.1.4 Specific requirements for CPs
D.4.1.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
D.4.2 Planning requirements
D.4.2.1 Safety <\/td>\n<\/tr>\n
64<\/td>\nD.4.2.2 Security
D.4.2.3 Environmental considerations and EMC
D.4.2.4 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
D.4.3 Network capabilities
D.4.3.1 Network topology
D.4.3.2 Network characteristics <\/td>\n<\/tr>\n
65<\/td>\nD.4.4 Selection and use of cabling components
D.4.4.1 Cable selection
Table D.1 \u2013 Network characteristics for balanced cabling based on Ethernet <\/td>\n<\/tr>\n
66<\/td>\nD.4.4.2 Connecting hardware selection
Table D.2 \u2013 Information relevant to copper cable: fixed cables <\/td>\n<\/tr>\n
67<\/td>\nD.4.4.3 Connections within a channel\/permanent link
Table D.3 \u2013 Connectors for balanced cabling CPs based on Ethernet <\/td>\n<\/tr>\n
68<\/td>\nD.4.4.4 Terminators
D.4.4.5 Device location and connection
D.4.4.6 Coding and labelling
D.4.4.7 Earthing and bonding of equipment and devices and shielded cabling <\/td>\n<\/tr>\n
69<\/td>\nD.4.4.8 Storage and transportation of cables
D.4.4.9 Routing of cables <\/td>\n<\/tr>\n
70<\/td>\nD.4.4.10 Separation of circuit
D.4.4.11 Mechanical protection of cabling components
D.4.4.12 Installation in special areas
D.4.5 Cabling planning documentation
D.4.5.1 Common description
D.4.5.2 Cabling planning documentation for CPs
D.4.5.3 Network certification documentation
D.4.5.4 Cabling planning documentation for generic cabling in accordance with ISO\/IEC 24702
D.4.6 Verification of cabling planning specification
D.5 Installation implementation
D.5.1 General requirements
D.5.1.1 Common description
D.5.1.2 Installation of CPs
D.5.1.3 Installation of generic cabling in industrial premises
D.5.2 Cable installation <\/td>\n<\/tr>\n
71<\/td>\nD.5.2.1 General requirements for all cabling types
D.5.2.2 Installation and routing
D.5.2.3 Specific requirements for CPs
D.5.2.4 Specific requirements for wireless installation
Table D.4 \u2013 Parameters for balanced cables <\/td>\n<\/tr>\n
72<\/td>\nD.5.2.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
D.5.3 Connector installation
D.5.3.1 Common description
D.5.3.2 Shielded connectors
D.5.3.3 Unshielded connectors
D.5.3.4 Specific requirements for CPs
D.5.3.5 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
D.5.4 Terminator installation
D.5.5 Device installation
D.5.5.1 Common description
D.5.5.2 Specific requirements for CPs
D.5.6 Coding and labelling
D.5.6.1 Common description
D.5.6.2 Specific requirements for CPs
D.5.7 Earthing and bonding of equipment and devices and shield cabling
D.5.7.1 Common description
D.5.7.2 Bonding and earthing of enclosures and pathways
D.5.7.3 Earthing methods <\/td>\n<\/tr>\n
73<\/td>\nD.5.7.4 Shield termination methods
D.5.7.5 Specific requirements for CPs
D.5.7.6 Specific requirements for generic cabling in accordance with ISO\/IEC 24702
D.5.8 As-implemented cabling documentation
D.6 Installation verification and installation acceptance test
D.6.1 General
D.6.2 Installation verification
D.6.2.1 General
D.6.2.2 Verification according to cabling planning documentation
D.6.2.3 Verification of earthing and bonding
D.6.2.3.1 General
D.6.2.3.2 Specific requirements for earthing and bonding
D.6.2.4 Verification of shield earthing
D.6.2.5 Verification of cabling system
D.6.2.5.1 Verification of cable routing
D.6.2.5.2 Verification of cable protection and proper strain relief
D.6.2.6 Cable selection verification
D.6.2.6.1 Common description
D.6.2.6.2 Specific requirements for CPs
D.6.2.6.3 Specific requirements for wireless installation
D.6.2.7 Connector verification <\/td>\n<\/tr>\n
74<\/td>\nD.6.2.7.1 Common description
D.6.2.7.2 Specific requirements for CPs
D.6.2.7.3 Specific requirements for wireless installation
D.6.2.8 Connection verification
D.6.2.8.1 Common description
D.6.2.8.2 Number of connections and connectors
D.6.2.8.3 Wire mapping
D.6.2.9 Terminators verification
D.6.2.10 Coding and labelling verification
D.6.2.10.1 Common description
D.6.2.10.2 Specific coding and labelling verification requirements
D.6.2.11 Verification report
D.6.3 Installation acceptance test
D.6.3.1 General
D.6.3.2 Acceptance test of Ethernet-based cabling
D.6.3.3 Acceptance test of non-Ethernet-based cabling
D.6.3.4 Specific requirements for wireless installation <\/td>\n<\/tr>\n
75<\/td>\nD.6.3.5 Acceptance test report
D.7 Installation administration
D.8 Installation maintenance and installation troubleshooting <\/td>\n<\/tr>\n
76<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Industrial communication networks. Profiles – Installation of fieldbuses. Installation profiles for CPF 8<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2014<\/td>\n78<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":244521,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[385,2641],"product_tag":[],"class_list":{"0":"post-244514","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-25-040-40","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/244514","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/244521"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=244514"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=244514"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=244514"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}