{"id":197842,"date":"2024-10-19T12:35:41","date_gmt":"2024-10-19T12:35:41","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-pom-102-2014-r2019\/"},"modified":"2024-10-25T05:09:07","modified_gmt":"2024-10-25T05:09:07","slug":"asme-pom-102-2014-r2019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-pom-102-2014-r2019\/","title":{"rendered":"ASME POM 102 2014 R2019"},"content":{"rendered":"

This Standard provides guidelines for operating equipment walkdowns that are designed to ultimately improve the thermal performance and efficiency of the power plant. Following these guidelines may also lead to more proactive maintenance practices, which can also be expected to improve the reliability of the plant.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
5<\/td>\nCONTENTS <\/td>\n<\/tr>\n
6<\/td>\nNOTICE <\/td>\n<\/tr>\n
7<\/td>\nFOREWORD <\/td>\n<\/tr>\n
8<\/td>\nASME PTC COMMITTEE ROSTER <\/td>\n<\/tr>\n
9<\/td>\nCORRESPONDENCE WITH THE PAP COMMITTEE <\/td>\n<\/tr>\n
10<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
11<\/td>\n1 OBJECT AND SCOPE
1.1 Object
1.2 Scope
2 ACRONYMS
3 GUIDING PRINCIPLES
3.1 Safety Considerations
3.2 Pre-Walkdown Activities <\/td>\n<\/tr>\n
12<\/td>\n3.3 Walkdown Plan
3.4 Inspection-Walkdown Activities
3.5 Postinspection-Walkdown Activities
4 SPECIFIC EQUIPMENT CONSIDERATIONS
5 INSTRUMENTS AND METHODS OF MEASUREMENT
6 REPORT OF RESULTS <\/td>\n<\/tr>\n
13<\/td>\nNONMANDATORY APPENDIX A GAS TURBINE INLET AIR CONDITIONING SYSTEMS
A-1 PERFORMANCE CONSIDERATIONS
A-2 EQUIPMENT WALKDOWN
A-2.1 Evaporative Coolers
A-2.2 Chillers
A-2.3 Foggers <\/td>\n<\/tr>\n
14<\/td>\nNONMANDATORY APPENDIX B GAS TURBINES
B-1 PERFORMANCE CONSIDERATIONS
B-2 EQUIPMENT WALKDOWN <\/td>\n<\/tr>\n
15<\/td>\nNONMANDATORY APPENDIX C HEAT RECOVERY STEAM GENERATORS
C-1 INTRODUCTION
C-2 SAFETY CONSIDERATIONS
C-3 DUCTWORK
C-4 PRIOR TO INSPECTION
C-5 DURING INSPECTION
C-6 VISUAL INSPECTION <\/td>\n<\/tr>\n
17<\/td>\nNONMANDATORY APPENDIX D WATER CHEMISTRY — SAMPLE PANEL
D-1 PERFORMANCE CONSIDERATIONS
D-2 EQUIPMENT WALKDOWN <\/td>\n<\/tr>\n
18<\/td>\nNONMANDATORY APPENDIX E STEAM GENERATORS
E-1 PREINSPECTION REVIEW
E-2 SYNERGISTIC CONSIDERATIONS
E-3 IMPACT OF FUELS ON PERFORMANCE <\/td>\n<\/tr>\n
19<\/td>\n E-4 EFFECTS OF THE AIR HEATER
E-5 OPERATIONAL CHECKS <\/td>\n<\/tr>\n
21<\/td>\nNONMANDATORY APPENDIX F STEAM TURBINE AND GENERATOR
F-1 INSPECTION OF ACCESSIBLE STEAM TURBINE-GENERATOR <\/td>\n<\/tr>\n
22<\/td>\nNONMANDATORY APPENDIX G STEAM SURFACE CONDENSERS
G-1 PRIOR TO INSPECTION
G-2 INSPECTION-WALKDOWN <\/td>\n<\/tr>\n
23<\/td>\nNONMANDATORY APPENDIX H AIR-COOLED STEAM CONDENSER
H-1 INSPECTION-WALKDOWN <\/td>\n<\/tr>\n
24<\/td>\nNONMANDATORY APPENDIX I COOLING TOWERS
I-1 PREPLANNING
I-2 PERFORMANCE CONSIDERATIONS
I-3 EQUIPMENT WALKDOWN <\/td>\n<\/tr>\n
25<\/td>\nNONMANDATORY APPENDIX J EMISSIONS CONTROL SYSTEMS
J-1 INSPECTION <\/td>\n<\/tr>\n
26<\/td>\nNONMANDATORY APPENDIX K PIPING SYSTEMS
K-1 GENERAL INSPECTION <\/td>\n<\/tr>\n
27<\/td>\nNONMANDATORY APPENDIX L FUEL DELIVERY SYSTEMS — SOLID FUELS
L-1 INTRODUCTION
L-2 TRUCK SCALES
L-3 ELECTRONIC SCALING
L-4 TRUCK DUMPS
L-5 MAGNETIC SEPARATORS <\/td>\n<\/tr>\n
28<\/td>\nL-6 METAL DETECTORS
L-7 DISC SCREENS (SCALPERS)
L-8 VIBRATING SCREENS <\/td>\n<\/tr>\n
29<\/td>\nL-9 WOOD GRINDERS AND HOGS
L-10 FUEL DIVERTER GATES
L-11 CONVEYOR BELTING <\/td>\n<\/tr>\n
30<\/td>\nL-12 CONVEYOR TRANSITIONS
L-13 DRAG CHAIN CONVEYORS <\/td>\n<\/tr>\n
31<\/td>\nL-14 INSTRUMENTATION
L-15 SAFETY
L-16 FIRE PROTECTION <\/td>\n<\/tr>\n
32<\/td>\nNONMANDATORY APPENDIX M PLANT AUXILIARY SYSTEMS — PUMPS
M-1 ROUTINE INSPECTION
M-2 SAFETY
M-3 PUMP DESCRIPTIONS
M-4 NOISE
M-5 PACKING AND SEALS
M-6 LUBRICATION <\/td>\n<\/tr>\n
33<\/td>\nM-7 BEARINGS
M-8 OIL
M-9 GREASE
M-10 VIBRATION
M-11 ROUTINE INSPECTION-WALKDOWN
M-12 DISCERNIBLE CHANGES <\/td>\n<\/tr>\n
34<\/td>\nM-13 REFERENCES <\/td>\n<\/tr>\n
35<\/td>\nNONMANDATORY APPENDIX N SAFETY CONSIDERATIONS
N-1 GENERAL CONSIDERATIONS
N-2 EQUIPMENT-SPECIFIC CONSIDERATIONS
N-2.1 Cooling Towers
N-2.2 Heat Recovery Steam Generators
N-2.3 Boiler Setting Air In-Leakage and Regenerative Rotary Air Heaters
N-2.4 Boiler: Steam and Water Side <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME POM 102-2014 – Operating Walkdowns of Power Plants – Reapproved 2019<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2014<\/td>\n40<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":197846,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-197842","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/197842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/197846"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=197842"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=197842"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=197842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}