{"id":194982,"date":"2024-10-19T12:22:21","date_gmt":"2024-10-19T12:22:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-3001-2-2017\/"},"modified":"2024-10-25T04:53:16","modified_gmt":"2024-10-25T04:53:16","slug":"ieee-3001-2-2017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-3001-2-2017\/","title":{"rendered":"IEEE 3001.2 2017"},"content":{"rendered":"
New IEEE Standard – Active. Commercial, institutional, and industrial design of electrical services, interconnecting with a utility distribution or transmission system is explored. The electrical system information needed by the designer concerning the utility\u2019s system characteristics, and the electrical load information needed by the utility to design a satisfactory electrical interface between the serving utility and the premise electrical distribution system is considered<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 3001.2\u2122-2017 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | IMPORTANT NOTICE 1.\u2002Scope 2.\u2002Normative references <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3.\u2002Common relationships with electric utilities 4.\u2002Planning for utility service 4.1\u2002Introduction <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.2\u2002Utility\/designer communication 4.3\u2002Service availability <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.4\u2002Facility load information <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.5\u2002Information from the utility <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 4.6\u2002Interrelated utility and project factors that influence design <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.\u2002Electric rates 5.1\u2002Demand and fixed charges 5.2\u2002Energy and variable charges <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 5.3\u2002Power factor credits and penalties 6.\u2002Electric utility metering and billing 6.1\u2002Introduction <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.2\u2002Metering by type of premises 6.3\u2002Metering by service voltage characteristics 6.4\u2002Meter location <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6.5\u2002Meter mounting, control, and associated equipment <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.6\u2002Metering equipment guidelines and types <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.7\u2002Metering for energy conservation 6.8\u2002Utility billing <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 7.\u2002Distribution circuit arrangements 7.1\u2002Introduction 7.2\u2002Network systems 7.3\u2002Small commercial buildings 7.4\u2002Medium and large commercial buildings <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 7.5\u2002Large industrial facilities 7.6\u2002Medium-voltage distribution 7.7\u2002Multiple services 7.8\u2002Multiple tenants 8.\u2002Incoming lines and service laterals 8.1\u2002Introduction <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 8.2\u2002Overhead service <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 8.3\u2002Underground service <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 8.4\u2002Service entrance conductors within a building <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 9.\u2002Service entrance installations 9.1\u2002Introduction 9.2\u2002Number of services <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 9.3\u2002Physical arrangement 9.4\u2002Service design considerations <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 9.5\u2002Medium-voltage services <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 9.6\u2002Vaults and pads for service equipment <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 9.7\u2002Network vaults for high-rise buildings <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 9.8\u2002Service rooms and electrical closets <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 10.\u2002Large services 10.1\u2002Introduction 10.2\u2002Purpose <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 10.3\u2002Substation justification 10.4\u2002Development stages <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 10.5\u2002Project participants 10.6\u2002Planning stage <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 10.7\u2002Design stage <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 10.8\u2002Construction stage <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Annex\u00a0A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Evaluating the Electrical Service Requirements of Industrial and Commercial Power Systems<\/b><\/p>\n |