{"id":110960,"date":"2024-10-18T16:03:47","date_gmt":"2024-10-18T16:03:47","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-980-1994\/"},"modified":"2024-10-24T21:59:46","modified_gmt":"2024-10-24T21:59:46","slug":"ieee-980-1994","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-980-1994\/","title":{"rendered":"IEEE 980 1994"},"content":{"rendered":"
Revision Standard – Active. The significance of oil-spillage regulations and their applicability to electric supply substations are discussed; the sources of oil spills are identified; typical designs and methods for dealing with oil containment and control of oil spills are discussed; and guidelines for preparation of a typical Spill Prevention Control and Countermeasures (SPCC) plan are provided. This guide excludes polychlorinated biphenyl (PCB) handling and disposal considerations.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1. Overview <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 2. References 3. Definitions 4. Statutory requirements <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5. Oil spill sources <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6. Criteria <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 7. Containment <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 8. Control and cleanup <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex A\u2014Typical notification form and spill report <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex B\u2014Collecting pit volume calculation <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Annex C\u2014Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Containment and Control of Oil Spills in Substations<\/b><\/p>\n |