{"id":106682,"date":"2024-10-18T14:33:03","date_gmt":"2024-10-18T14:33:03","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-d75-2003\/"},"modified":"2024-10-24T21:37:33","modified_gmt":"2024-10-24T21:37:33","slug":"astm-d75-2003","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-d75-2003\/","title":{"rendered":"ASTM-D75 2003"},"content":{"rendered":"

ASTM D75-03<\/h3>\n

Historical Standard: Standard Practice for Sampling Aggregates<\/h4>\n
\n

ASTM D75<\/h4>\n

Scope<\/strong><\/p>\n

1.1 This practice covers sampling of coarse and fine aggregates for the following purposes:<\/p>\n

1.1.1 Preliminary investigation of the potential source of supply,<\/p>\n

1.1.2 Control of the product at the source of supply,<\/p>\n

1.1.3 Control of the operations at the site of use, and<\/p>\n

1.1.4 Acceptance or rejection of the materials.<\/p>\n

Note 1\u2014 Sampling plans and acceptance and control tests vary with the type of construction in which the material is used. Attention is directed to Practices E 105 and D 3665.<\/p>\n

1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.<\/i><\/p>\n

Keywords<\/strong><\/p>\n

aggregates, exploration of potential sources; aggregates, number of sizes needed to estimate character; aggregates, sampling<\/p>\n

ICS Code<\/strong><\/p>\n

ICS Number Code 91.100.30 (Concrete and concrete products)<\/p>\n

DOI:<\/strong> 10.1520\/D0075-03<\/p>\n<\/div>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nScope
Referenced Documents
Terminology
Significance and Use <\/td>\n<\/tr>\n
2<\/td>\nSecuring Samples
Shipping Samples <\/td>\n<\/tr>\n
3<\/td>\nKeywords
X1. SAMPLING AGGREGATE FROM STOCKPILES OR TRANSPORTATION UNITS
X1.1 Scope
X1.2 Sampling from Stockpiles
X1.3 Sampling from Transportation Units
TABLE 1 <\/td>\n<\/tr>\n
4<\/td>\nX2. EXPLORATION OF POTENTIAL AGGREGATE SOURCES
X2.1 Scope
X2.2 Sampling Stone from Quarries or Ledges
X2.3 Sampling Roadside or Bank Run Sand and Gravel Deposits
X3. NUMBER AND SIZE OF INCREMENTS NEEDED TO ESTIMATE CHARACTER OF UNIT SAMPLED
X3.1 Scope
X3.2 Descriptions of Terms Specific to This Standard
X3.3 Test Unit, Size, and Variability <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

D75-03 Standard Practice for Sampling Aggregates<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASTM<\/b><\/a><\/td>\n2003<\/td>\n5<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":106683,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1258,2637],"product_tag":[],"class_list":{"0":"post-106682","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-100-30","7":"product_cat-astm","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/106682","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/106683"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=106682"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=106682"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=106682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}