Shopping Cart

No products in the cart.

WRC volume 42 No. 11-12:1987

$27.95

Progress Reports Volume 42 No. 11-12

Published By Publication Date Number of Pages
WRC 1987 94
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Contents

– Executive and Main Committees, October 14, 1987
– PVRC Steering/Technical Committees on Piping Systems, October 12, 1987
– PVRC Technical Committee on Piping Systems, May 18, 1987
– Special Meeting on Coordination of ASME Sections III and XI, October 12, 1987
– Materials and Fabrication Division, October 14, 1987
– Subcommittee on Thermal and Mechanical Effects on Materials, October 14, 1987
– Subcommittee on Failure Modes of Components, October 13, 1987
– Subcommittee on Nondestructive Examination of Components, August 24, 1987
– Subcommittee on Elevated Temperature Behavior of Components, October 12, 1987
– Design Division, October 14, 1987
– Subcommittee on Elevated Temperature Design, October 13, 1987
– Subcommittee on Shells and Ligaments, October 13, 1987
– Subcommittee on Reinforced Opening and External Loads, October 12, 1987
– Subcommittee on Dynamic Analysis of Pressure Components, October 13, 1987
– Subcommittee on Piping, Pumps, and Valves, October 13, 1987
– Subcommittee on Bolted Flanged Connections, October 13, 1987
– Joint Task Group on Elevated Temperature Behavior of Bolted Flanges, October 12, 1987

WRC volume 42 No. 11-12:1987
$27.95