WRC volume 41 No. 11-12:1986
$27.95
Progress Reports Volume 41 No. 11-12
Published By | Publication Date | Number of Pages |
WRC | 1986 | 98 |
Contents
– Executive Meeting & Attachments, October 8, 1986
– PVRC Steering Committee on Piping Systems, October 6, 1986
– Technical Committee on Piping Systems, October 6, 1986 and August 20, 1986
– Design Division, October 8, 1986
– Subcommittee on Bolted Flanged Connections, October 7, 1986
– Task Group on Elevated Temperature Behavior of BFC, October 6, 1986
– Task Group on Gasket Testing, October 7, 1986
– Subcommittee on Reinforced Openings and Ext. Loads, October 6, 1986
– Subcommittee on Elevated Temperature Design, October 7, 1986
– Subcommittee on Shells and Ligaments, October 7, 1986
– Subcommittee on Dynamic Analysis of Pressure Components, October 7, 1986
– Task Group on Dynamic Stress Criteria, October 7, 1986
– Materials Division, October 8, 1986
– Subcommittee on Failure Modes in Pressure Vessel Materials, October 8, 1986
– Subcommittee on Pressure Vessel Steel, October 7, 1986
– Subcommittee on Nondestructive Examination of Materials, September 8, 1986
– Fabrication Division, October 7, 1986
– Subcommittee on Cyclic and Creep Behavior of Components, October 6, 1986
– Subcommittee on Thermal and Mechanical Effects, October 7, 1986
– PVRC Future Meeting Dates