IEEE 933-2013(Redline)
$148.42
IEEE Guide for the Definition of Reliability Program Plans for Nuclear Generating Stations and Other Nuclear Facilities (Redline)
Published By | Publication Date | Number of Pages |
IEEE | 2013 | 65 |
Revision Standard – Superseded. Guidelines for the definition of a reliability program at nuclear generating stations and other nuclear facilities are provided. The document emphasizes reliability programs during the operating phase of such stations; however, the general approach applies to all phases of the nuclear power generating station life cycle (e.g., design, construction, start-up, operating, and decommissioning).
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 933-2013 Front Cover |
3 | Title page |
5 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
8 | Participants |
10 | Introduction |
12 | Contents |
13 | Important Notice 1. Overview |
14 | 1.1 Scope 1.2 Purpose 2. Normative references 3. Definitions, acronyms, and abbreviations 3.1 Definitions |
18 | 3.2 Acronyms and abbreviations |
19 | 4. Program elements 4.1 Performance monitoring |
22 | 4.2 Performance evaluation |
27 | 4.3 Problem prioritization |
29 | 4.4 Problem analysis and corrective action recommendation |
33 | 4.5 Corrective action implementation and feedback |
35 | 5. Major programmatic resources |
36 | 5.1 Operations |
37 | 5.2 Maintenance 5.3 Engineering |
38 | 5.4 Safety |
39 | 5.5 Licensing 5.6 Quality assurance 5.7 Procurement |
40 | Annex A (informative) Reliability program management A.1 Planning |
41 | A.2 Integration A.3 Organization |
43 | A.4 Controlling A.5 Leadership |
45 | Annex B (informative) Case study—Application of Excelsior Power Company’s reliability program plan to service water pumps B.1 Overview B.2 Service water pump performance |
47 | Annex C (informative) Sample RAM specification for replacement service water pumps |
49 | C.1 Section 1: General C.2 Section 2: Scope C.3 Section 3: Specific RAM requirements |
50 | C.4 Section 4: RAM tasks |
54 | C.5 Section 5: Availability demonstration |
55 | C.6 Section 6: Root cause analysis |
56 | Annex D (informative) Bibliography |