IEEE 26702-2007
$138.67
ISO/IEC Standard for Systems Engineering – Application and Management of the Systems Engineering Process
Published By | Publication Date | Number of Pages |
IEEE | 2007 |
New IEEE Standard – Superseded. The interdisciplinary tasks, which are required throughout a system’s life cycle to transform customer needs, requirements, and constraints into a system solution, are defined. In addition, the requirements for the systems engineering process and its application throughout the product life cycle are specified. The focus of this standard is on engineering activities necessary to guide product development while ensuring that the product is properly designed to make it affordable to produce, own, operate, maintain, and eventually to dispose of, without undue risk to health or the environment.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ISO/IEC 26702 (IEEE Std 1220-2005) |
5 | IEEE Standard for Application and Management of the Systems Engineering Process |
8 | IEEE Introduction |
10 | Participants |
12 | Contents |
14 | 1. Overview 1.1 Scope |
15 | 1.2 Purpose 1.3 How to use this standard |
19 | 1.4 Organization of this standard 2. Normative references |
20 | 3. Definitions and acronyms 3.1 Definitions |
23 | 3.2 Acronyms 4. General requirements |
24 | 4.1 Systems engineering process 4.2 Policies and procedures for systems engineering |
25 | 4.3 Planning the technical effort |
26 | 4.4 Development strategies 4.5 Modeling and prototyping 4.6 Integrated repository |
27 | 4.7 Integrated data package |
29 | 4.8 Specification tree 4.9 Drawing tree |
30 | 4.10 System breakdown structure 4.11 Integration of the systems engineering effort |
32 | 4.12 Technical reviews 4.13 Quality management 4.14 Product and process improvement |
33 | 5. Application of systems engineering throughout the system life cycle |
34 | 5.1 System definition stage |
38 | 5.2 Preliminary design stage |
42 | 5.3 Detailed design stage |
45 | 5.4 Fabrication, assembly, integration, and test stage |
47 | 5.5 Production and support stages |
49 | 5.6 Simultaneous engineering of life cycle processes |
50 | 6. The systems engineering process 6.1 Requirements analysis |
56 | 6.2 Requirements validation |
58 | 6.3 Functional analysis |
61 | 6.4 Functional verification |
62 | 6.5 Synthesis |
66 | 6.6 Design verification |
70 | 6.7 Systems analysis |
74 | 6.8 Control |
80 | Annex A—The role of systems engineering within an enterprise |
84 | Annex B—The systems engineering management plan |
92 | Annex C—Use of IEEE Std 1220 in an ISO/IEC 15288 context |
100 | Annex D—Bibliography |