BSI PD ISO/IEC TR 29110-5-6-2:2014
$215.11
Systems and software engineering. Lifecycle profiles for Very Small Entities (VSEs) – Systems engineering. Management and engineering guide: Generic profile group: Basic profile
Published By | Publication Date | Number of Pages |
BSI | 2014 | 72 |
1.1 Fields of application
This part of ISO/IEC 29110 is applicable to Very Small Entities (VSEs). VSEs are enterprises, organizations, departments or projects having up to 25 people. The lifecycle processes described in the set of International Standards (IS) and Technical Reports (TR) are not intended to preclude or discourage their use by organizations bigger than VSEs.
This part of ISO/IEC 29110 provides the management and engineering guide to the Basic Profile described in ISO/IEC 29110-4-6 through Project Management and System Definition and realization processes. This part of ISO/IEC 29110 is a standalone guide; it is not intended for a VSE to use the standardized profile to implement this part of ISO/IEC 29110.
This part of ISO/IEC 29110 applies for non-critical systems development projects. The system development should fulfil the project requirements and the system description.
Using this part of ISO/IEC 29110, a VSE can obtain benefits in the following aspects:
-
An agreed set of project requirements (technical part of contract) and expected products are agreed by the Acquirer.
-
A disciplined management process, that provides project visibility and corrective actions of project problems and deviations, is performed.
-
A systematic System Definition and Realization process, that satisfies Acquirer needs and ensures quality products, is followed.
VSEs developing software that is part of a larger system, and for stand-alone software products and services, are encouraged to use the management and engineering guide of the Basic Profile (ISO/IEC 29110-5-1-2[9]).
1.2 Target Audience
This part of ISO/IEC 29110 is targeted at VSEs who do not develop critical systems and do not have experience with SE process planning and implementation using ISO/IEC 15288.
It is intended to be used with any processes, techniques and methods that enhance the VSE’s Stakeholder satisfaction and productivity.
PDF Catalog
PDF Pages | PDF Title |
---|---|
6 | Foreword |
7 | Introduction |
8 | Table tab_1 |
9 | Figure fig_1 |
11 | Section sec_1 Section sec_1.1 Section sec_1.2 Section sec_2 1 Scope 1.1 Fields of application 1.2 Target Audience 2 Normative references |
12 | Section sec_3 Section sec_3.1 Section sec_3.2 Section sec_3.3 Section sec_3.4 Section sec_3.5 3 Terms and definitions |
13 | Section sec_3.6 Section sec_3.7 Section sec_3.8 Section sec_3.9 Section sec_3.10 Section sec_3.11 Section sec_3.12 |
14 | Section sec_4 Section sec_4.1 4 Symbols and abbreviated terms 4.1 Naming, diagramming and definition conventions |
15 | Section sec_4.2 Section sec_5 4.2 Abbreviated Terms 5 Systems Thinking |
16 | Section sec_6 6 Overview |
17 | Figure fig_2 Section sec_7 Section sec_7.1 7 Project Management (PM) process 7.1 PM purpose |
18 | Section sec_7.2 Section sec_7.3 Table tab_2 Section sec_7.4 Table tab_3 7.2 PM objectives 7.3 PM input products 7.4 PM output products |
19 | Section sec_7.5 Table tab_4 Section sec_7.6 Table tab_5 Section sec_7.7 7.5 PM internal products 7.6 PM roles involved 7.7 PM diagram |
20 | Figure fig_3 Section sec_7.7.1 |
21 | Section sec_7.7.1.1 Table tab_6 |
24 | Section sec_7.7.1.2 Table tab_7 |
26 | Section sec_7.7.1.3 Table tab_8 |
27 | Section sec_7.7.1.4 |
28 | Table tab_9 Section sec_7.7.2 Table tab_10 Section sec_8 Section sec_8.1 Section sec_8.2 8 System Definition and Realization (SR) process 8.1 SR purpose 8.2 SR objectives |
29 | Section sec_8.3 Table tab_11 Section sec_8.4 Table tab_12 Section sec_8.5 Table tab_13 8.3 SR input products 8.4 SR output products 8.5 SR internal products |
30 | Section sec_8.6 Table tab_14 Section sec_8.7 8.6 SR roles involved 8.7 SR diagram |
31 | Figure fig_4 Section sec_8.7.1 |
32 | Section sec_8.7.1.1 Table tab_15 Section sec_8.7.1.2 |
33 | Table tab_16 |
36 | Section sec_8.7.1.3 |
37 | Table tab_17 |
39 | Section sec_8.7.1.4 |
40 | Table tab_18 Section sec_8.7.1.5 |
41 | Table tab_19 |
42 | Section sec_8.7.1.6 |
43 | Table tab_20 |
44 | Section sec_8.7.2 Table tab_21 Section sec_9 9 Roles |
45 | Table tab_22 |
46 | Section sec_10 Table tab_23 10 Product description |
59 | Section sec_11 Section sec_11.1 11 System tools requirements 11.1 System tools requirements overview |
60 | Section sec_11.2 Table tab_24 Section sec_11.3 Table tab_25 11.2 Project Management process 11.3 System Definition and Realization process |
61 | Annex sec_A Table tab_A.1 Annex A (informative) Systems Engineering Deployment Packages |
63 | Annex sec_B Annex sec_B.1 Annex B (informative) Mapping between the objectives of ISO/IEC TR 29110-5-6-2 and ISO/IEC 15288:2008 |
65 | Annex sec_B.2 |
68 | Reference ref_1 Reference ref_2 Reference ref_3 Reference ref_4 Reference ref_5 Reference ref_6 Reference ref_7 Reference ref_8 Reference ref_9 Reference ref_10 Reference ref_11 Reference ref_12 Reference ref_13 Bibliography |