BSI 22/30422764 DC 2022
$13.70
BS ISO 5091-3. Structural intervention of existing concrete structures using cementitious materials – Part 3. Bottom-surface (soffit) underlaying
Published By | Publication Date | Number of Pages |
BSI | 2022 | 37 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
7 | Foreword |
8 | Introduction |
9 | 1 Scope |
10 | 2 Normative references 3 Terms and definitions 3.1 General 4 Investigation of existing structure 4.1 General 4.2 Investigation 4.2.1 Investigation using documents, records, etc. |
11 | 4.2.2 On-site investigation 5 Intervention design 5.1 General |
12 | 5.2 Structural plan 5.3 Structural details 6 Materials 6.1 General |
13 | 6.2 Materials in existing structure 6.3 Materials used in repairing or strengthening parts 6.3.1 General 6.3.2 Cementitious materials 6.3.3 Reinforcing materials 6.3.4 Bonding products |
14 | 6.4 Characteristic values and design values of materials for repaired or strengthened parts 6.4.1 General 6.4.2 Cementitious materials 6.4.3 Reinforcing materials 6.4.4 Bonding products 7 Actions 7.1 General 7.2 Actions for intervention design 8 Performance verification for repaired or strengthened structure 8.1 General |
15 | 8.2 Calculation of response values 8.2.1 General 8.2.2 Modeling of structure 8.2.3 Structural analysis 8.2.4 Calculation of design response values |
19 | 8.3 Durability verification 8.4 Safety verification 8.4.1 General 8.4.2 Verification related to failure |
26 | 8.4.3 Verification related to fatigue failure |
28 | 8.5 Serviceability verification 8.5.1 General 8.5.2 Verification related to appearance |
29 | 8.5.3 Verification related to displacement and deformation 8.6 Restorability verification 8.7 Structural details 8.7.1 Thickness of bottom-surface (soffit) underlaying parts 8.7.2 Cover |
30 | 8.7.3 Space between reinforcing materials 8.7.4 Joints for reinforcing materials 8.7.5 Anchoring and securing methods of reinforcing materials 9 Construction 9.1 General |
31 | 9.2 Prior investigation and construction plan |
32 | 9.3 Surface treatment 9.4 Assembly of reinforcing materials |
33 | 9.5 Surface preparation 9.6 Storage, mixing and transportation of underlaying materials 9.7 Execution of underlaying |
34 | 9.8 Curing 9.9 Quality control |
35 | 9.10 Inspection 10 Records 11 Maintenance |
36 | Annex€A (informative) Examples of execution procedure |