BS EN 62337:2012:2013 Edition

$167.15

Commissioning of electrical, instrumentation and control systems in the process industry. Specific phases and milestones

Published By Publication Date Number of Pages
BSI 2013 40
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This International Standard defines specific phases and milestones (see Figure 1) in the commissioning of electrical, instrumentation and control systems in the process industry. By way of example, it describes activities following the “c ompletion-of-erection” milestone o f the project and prior to the “a cceptance-of-the-plant” phase by the owner. Such activities need to be adapted for each t ype of process/plant concerned.

NOTE This standard assumes that the “acceptance -of-the-plant” milestone will occur after the performance test. If there is a reduced scope, this document should be adapted accordingly.

NOTE Construction and precommissioning activities could be overlapping.

For application in the pharmaceutical or other highly specialized industries, additional guidelines (for example, Good Automated Manufacturing Practice (GAMP)), definitions and stipulations should apply in accordance with existing standards, for example, for GMP Compliance 21 CFR (FDA) and the Standard Operating Procedure of the European Medicines Agency (SOP/INSP/2003).

PDF Catalog

PDF Pages PDF Title
6 English
CONTENTS
7 INTRODUCTION
8 1 Scope
2 Normative references
Figure 1 – Definition of phases and milestones
9 3 Terms and definition
12 4 General preparations before acceptance of plant
5 Completion of erection
5.1 Mechanical checks and tests
13 5.2 Procedure
6 Precommissioning (mechanical completion)
6.1 General
6.2 Procedure
14 7 Commissioning
7.1 General
7.2 Procedure
15 7.3 Execution of performance test
Untitled
16 8 Performance test and acceptance of plant
8.1 General
8.2 Conditions for commencement of performance test
17 8.3 Execution of performance test
8.4 Evaluation and report of performance test
19 Annex A (informative) List of documents to be used forthe precommissioning and commissioning phase
21 Annex B (informative) Description of precommissioning activities
Tables
Table B.1 – General procedures
25 Table B.2 – Specific procedures
32 Annex C (informative) Mechanical completion certificate
33 Annex D (informative) Description of commissioning activities
Table D.1 – Activities to be performed during the commissioning stage
35 Annex E (informative) Acceptance of plant certificate
36 Annex F (informative) Project-specific items
Table F.1 – Project-specific items to be discussed and agreed upon
37 Bibliography
BS EN 62337:2012
$167.15