Shopping Cart

No products in the cart.

BS EN 60974-4:2011

$102.76

Arc welding equipment – Periodic inspection and testing

Published By Publication Date Number of Pages
BSI 2011 20
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This part of IEC 60974 specifies test procedures for periodic inspection and, after repair, to ensure electrical safety. These test procedures are also applicable for maintenance.

This standard is applicable to power sources for arc welding and allied processes designed in accordance with IEC 60974-1 or IEC 60974-6. Stand-alone ancillary equipment designed in accordance with other part of IEC 60974 may be tested in accordance with relevant requirement of this part of IEC 60974.

NOTE 1 The welding power source may be tested with any ancillary equipment fitted that could affect the test results.

This standard is not applicable to testing of new power sources or engine-driven power sources.

NOTE 2 For a power source not built in accordance with IEC 60974-1, see Annex C.

PDF Catalog

PDF Pages PDF Title
6 English
CONTENTS
7 1 Scope
2 Normative references
3 Terms and definitions
8 4 General requirements
4.1 Qualification of test personnel
4.2 Test conditions
4.3 Measuring instruments
9 4.4 Periodic inspection and test
4.5 Maintenance
4.6 Repair
4.7 Test sequence
Table 1 – Test sequence on used arc welding equipment
10 5 Protection against electrical shock
5.1 Visual inspection
5.2 Continuity of the protective circuit
5.3 Insulation resistance
5.4 Welding circuit leakage current
Table 2 – Insulation resistance
11 5.5 Primary leakage current
Figures
Figure 1 – Measurement of leakage current of welding circuit
12 Figure 2 – Measuring network for primary leakage current
Figure 3 – Principles of primary leakage current measurement for single phase equipment
13 5.6 No-load voltage (U0)
6 Functional test
6.1 Function
Figure 4 – Measurement of peak values
14 6.2 Supply-circuit on/off switching device
6.3 Voltage-reducing device
6.4 Magnetic gas valve
6.5 Signal and control lamps
7 Documentation
7.1 Test report
15 7.2 Labelling
16 Annex A (informative) Check-list for the visual inspection
17 Annex B (informative) Example of a test report after repair
18 Annex C (informative) Equipment not built in accordance with IEC 60974-1
BS EN 60974-4:2011
$102.76