Shopping Cart

No products in the cart.

BS EN 16602-10-04:2014

$142.49

Space product assurance. Critical-item control

Published By Publication Date Number of Pages
BSI 2014 32
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This Standard defines the principles, process, implementation and requirements for critical-items control.

Clause 4 is the informative part of this Standard whereas clause 5 and Annex A form the normative part.

This standard may be tailored for the specific characteristics and constraints of a space project, in accordance with ECSS-S-ST-00.

PDF Catalog

PDF Pages PDF Title
8 1 Scope
9 2 Normative references
10 3 Terms, definitions and abbreviated terms
3.1 Terms defined in other standards
3.2 Abbreviated terms
11 4 Overview of the critical-item control process
4.1 General
4.2 Critical-item control process
4.2.1 Critical items and critical-item control
4.2.2 Interfaces between critical-item control and risk management
12 4.2.3 Interfaces between critical-item control and product assurance
4.2.4 Interfaces between critical-item control and product engineering
13 4.2.5 Integration of CI control activities
14 5 Requirements
5.1 Critical-item control process
5.1.1 General requirements
15 5.2 Implementation requirements
5.2.1 General
5.2.2 Step 1: Define CI control requirement
5.2.2.1 Task 1: Establish the CI definition for the project
16 5.2.2.2 Task 2: Define the CI control process scope and objectives
5.2.2.3 Task 3: Plan the implementation of the CI control process for the project
5.2.3 Step 2: Identify and classify the critical items
5.2.3.1 Task 4: Identify critical items
5.2.3.2 Task 5: Classify critical items
17 5.2.4 Step 3: Decide and act
5.2.4.1 Task 6: Prioritise critical items
5.2.4.2 Task 7: Propose CI control measures
5.2.4.3 Task 8: Decide on the CI control measures
5.2.4.4 Task 9: Implement agreed CI control measures
18 5.2.5 Step 4: Communicate and close�out
5.2.5.1 Task 10: Monitor and communicate the results of the CI control process
5.2.5.2 Task 11: Close�out the CI control process for the project
5.3 Integration of CI control activities
5.3.1 Consolidation and gathering method
19 5.3.2 Preliminary design review (PDR)
5.3.3 Critical design review (CDR)
5.3.4 Acceptance review (AR)
BS EN 16602-10-04:2014
$142.49