BS EN 13071-3:2019
$86.31
Stationary waste containers up to 5 000 l, top lifted and bottom emptied – Recommended lifting connections
Published By | Publication Date | Number of Pages |
BSI | 2019 | 14 |
This document specifies the requirements for the container lifting and opening/closing/locking connections to be used during the loading and unloading operations of the containers top lifted and bottom emptied.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
6 | 1 Scope 2 Normative references 3 Terms and definitions |
8 | 4 Requirements 4.1 General requirements 4.2 Specific requirements 4.2.1 General 4.2.2 Loop 4.2.2.1 Single loop 4.2.2.2 Two loops in line 4.2.2.3 Two loops parallel 4.2.2.4 Three loops in line 4.2.3 Mushroom 4.2.4 Compatibility between handling system and mushroom |
9 | 4.2.5 Movement of a locking loop / mushroom 4.2.6 Twin lifting bars |
11 | Annex A (normative)Upper shape for loop |
12 | Annex B (informative)Dimensions of mushroom lifting connection |