Shopping Cart

No products in the cart.

BICSI G1 2017

$8.13

BICSI G1-17, ICT Outside Plant Construction and Installation: General Practices

Published By Publication Date Number of Pages
BICSI 2017
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

BICSI G1-17 is the first in a series of standards focused on the construction and installation of ICT cabling infrastructure within OSP pathways and applications. BICSI G1 is designed to provide general information relevant to all OSP construction and pathways, with additional standards under development providing in-depth detail on the specific pathways and associated tasks. Given the nature of development, this standard has been placed under continuous revision, so that as additional material is developed and approved, content within this standard can be modified to expand areas not present or remove conflicts if they arise.

PDF Catalog

PDF Pages PDF Title
6 TABLE OF CONTENTS
8 INDEX OF TABLES
12 1 Introduction
1.1 Purpose
1.2 Categories of Criteria
2 Scope
14 3 Required Standards and Documents
3.1 Standards
3.2 Regulatory Documents
3.2.1 United States Code of Federal Regulations (CFR)
16 4 Definitions, Acronyms, Abbreviations, and Units of Measurement
4.1 Definitions
24 4.2 Acronyms and Abbreviations
25 4.3 Units of Measurement
26 5 General Safety Considerations
5.1 Underground and Buried Utilities Locates
5.1.1 Overview
5.1.2 American Public Works Association (APWA) Uniform Color Code (ANSI Z535.1)
Table 5-1 APWA Uniform Color Code (ANSI Z535.1)
5.2 Pre Mobilization Project and Safety Briefing
27 5.3 Initial Job Site Arrival Assessment
5.4 On Site Set Up
5.5 On Site Work Tasks
5.6 Site Conditions
5.7 Personal Protective Equipment (PPE)
5.7.1 Hardhat
5.7.2 Hand and Foot Protection
5.7.3 Eye and Face Protection
5.7.4 Hearing Protection Type
28 5.7.5 Clothing or Non-conductive Covering
5.8 Confined Spaces
5.8.1 Requirements
5.9 Qualifications of Personnel
5.9.1 Overview
29 5.10 Energized Electrical Equipment
5.10.1 Approach Distances
Table 5-2 Approach Distances to Exposed Energized Overhead Power Lines and Parts
5.10.2 Climbing Spaces
30 6 Tools
6.1 Overview
6.2 Tools – General
6.2.1 Digging
6.2.2 Hardware and Cable Installation
6.2.3 Power Tools
6.3 Commonly Used Tools for Aerial Plant
6.3.1 Pole Setting Tools
6.3.2 Hardware and Cable Installation
31 6.3.3 Guy, Messenger Installation
6.3.4 Cable Hanging and Lashing
6.3.5 Power Tools
6.4 Commonly Used Tools for Underground and Direct-Buried Plant Plant
6.4.1 Digging Equipment
6.4.2 Power Tools
6.4.3 Safety Equipment
32 7 Aerial OSP Installation
7.1 General Aerial Safety Considerations
7.1.1 Job Site Arrival Safety Size Up
7.1.2 On Site Set Up
7.1.3 On Site Work Tasks
7.1.4 Work Site Demobilization
7.2 Aerial Pathway Safety Considerations
7.2.1 Rigging
7.2.2 Bucket Truck, Auger Truck, Boom Truck
7.2.3 Pole Climbing
33 7.2.4 Ladders
7.3 Underground and Direct-Buried Pathway Safety Considerations
34 8 Bonding and Grounding
8.1 Overview
8.2 Grounding
8.2.1 Overview
8.2.2 Recommendations
8.3 Bonding
8.3.1 Overview
8.3.2 Requirements
36 9 Right of Way
9.1 Overview
9.2 Types of Right of Way
9.3 Verification
37 9.4 Permits
38 10 Drawings and Specifications (Construction Documents)
10.1 Overview
10.2 Elements
10.3 Requirements
40 Appendix A One Call Center Information (Informative)
A.1 One Call Centers
41 A.2 Click Before You Dig
A.3 Locations Without a Once Call Center
42 Appendix B Commonly Encountered AHJ Definitions (Informative)
B.1 Introduction
B.2 Code of Federal Regulations (CFR)
Table B-1 Terms from Title 29 Labor, Part 1910 Occupational Safety and Health Administration
56 Appendix C Related Documents (Informative)
BICSI G1 2017
$8.13