ACI 347.2R 17:2017 Edition
$29.25
347.2R-17: Guide for Shoring/Reshoring of Concrete Multistory Buildings
Published By | Publication Date | Number of Pages |
ACI | 2017 | 28 |
This guide presents information and design criteria for shoring/reshoring operations during the construction of reinforced and post-tensioned multistory buildings. Methods for developing safe construction practices, including sequencing and timing, as well as design examples, are provided. It is written for the use of formwork engineer/contractors and engineer/architects. Keywords: construction loads; falsework; form removal; formwork; post-tensioning; reshoring; shoring.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | TITLE PAGE |
4 | CHAPTER 1—INTRODUCTION 1.2—Scope CHAPTER 2—NOTATION AND DEFINITIONS 2.1—Notation |
5 | 2.2—Definitions CHAPTER 3—SHORING/RESHORING CONSTRUCTION NEEDS 3.1—Use of reshoring 3.2—Types of forming systems |
6 | CHAPTER 4—CONSTRUCTION LOADS ON FORMWORK 4.1—Construction loads 4.2—Load combinations |
7 | 4.3—Typical construction phases |
8 | 4.4—Construction load distribution 4.5—Application of the simplified method |
10 | 4.6—Factors affecting the construction load distribution |
11 | 4.7—Post-tensioning load redistribution |
12 | CHAPTER 5—STRENGTH OF CONCRETE SLABS AND FORMWORK 5.1—Early-age concrete material strength development |
13 | 5.2—Construction load factors 5.3—Early-age strength of concrete slabs |
14 | 5.4—Serviceability of concrete slabs 5.5—Strength of formwork CHAPTER 6—CONSTRUCTION EXAMPLES 6.1—Two-way slab construction |
20 | 6.2—Post-tensioned construction example |
22 | CHAPTER 7—REFERENCES |
23 | Authored documents |