ACI 347.2R 05 2005
$22.48
347.2R-05: Guide for Shoring/Reshoring of Concrete Multistory Buildings
Published By | Publication Date | Number of Pages |
ACI | 2005 | 18 |
This guide presents information and design criteria for shoring/reshoring operations during the construction of reinforced and post-tensioned multi-story buildings. It provides methods for developing safe construction schedules and provides design examples. It is written for the use of form-work engineer/contractors and engineer/architects. Keywords: construction loads; falsework; form removal, formwork; post-tensioning; reshoring; shoring.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | CONTENTS |
2 | CHAPTER 1— INTRODUCTION CHAPTER 2— SHORING/RESHORING CONSTRUCTION NEEDS 2.1—Definitions |
3 | 2.2—Advantages of reshoring 2.3—Types of forming systems CHAPTER 3— CONSTRUCTION LOADS ON FORMWORK 3.1—Construction loads |
4 | 3.1.1 Gravity loads 3.1.2 Lateral loads 3.1.3 Other loads and conditions 3.1.4 Post-Tensioning load distribution 3.2—Load combinations 3.3—Typical phases of construction |
5 | 3.4—Construction load distribution |
6 | 3.5—Application of the simplified method 3.6—Factors affecting the construction load distribution 3.6.1 Shore/reshore stiffness |
7 | 3.6.2 Floor stiffness and type 3.6.3 Shore system configuration 3.6.4 Number of shored levels 3.6.5 Number of reshored levels 3.6.6 Rate of construction 3.7—Post-tensioning load redistribution |
8 | CHAPTER 4— STRENGTH ADEQUACY OF CONCRETE SLABS AND FORMWORK 4.1—Early-age concrete material strength development 4.1.1 Compressive strength 4.1.2 Tensile strength 4.1.3 Modulus of elasticity |
9 | 4.2—Construction load factors 4.3—Early-age capacity of concrete slabs 4.3.1 Flexural strength 4.3.2 Shear strength |
10 | 4.4—Serviceability requirements 4.5—Formwork adequacy CHAPTER 5— CONSTRUCTION EXAMPLES 5.1— Two- way slab construction 5.1.1 Construction example data |
11 | 5.1.2 Construction load distribution |
12 | 5.1.3 Concrete strength development 5.1.4 Adequacy of concrete slabs 5.1.4.1 Available early-age slab load capacity |
13 | 5.1.4.2 Applied construction load 5.1.4.3 Strength adequacy 5.1.4.4 Slab deflections 5.1.5 Adequacy of shoring/reshoring system |
14 | 5.2—Post-tensioned construction example 5.2.1 Post-tensioned example data 5.2.1.1 Member sizes 5.2.1.2 Design loads 5.2.1.3 Concrete mixtures 5.2.1.4 Shoring system 5.2.1.5 Construction loads 5.2.1.6 Construction weather conditions |
15 | 5.2.1.7 Construction rate 5.2.1.8 Post-tensioning sequence 5.2.2 Construction load distribution 5.2.2.1 Concrete placement stage 5.2.2.2 Post-tensioning stage 5.2.2.3 Post-tensioning of slabs 5.2.2.4 Post-tensioning of beams |
16 | 5.2.2.5 Post-tensioning of girders 5.2.3 Adequacy of concrete members |
17 | 5.2.4 Adequacy of shoring/reshoring system 5.2.4.1 Slab shores 5.2.4.2 Beam shores 5.2.4.3 Girder shores CHAPTER 6— REFERENCES 6.1— Referenced standards and reports |
18 | 6.2—Cited references |