Shopping Cart

No products in the cart.

ACI 347.2R 05 2005

$22.48

347.2R-05: Guide for Shoring/Reshoring of Concrete Multistory Buildings

Published By Publication Date Number of Pages
ACI 2005 18
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This guide presents information and design criteria for shoring/reshoring operations during the construction of reinforced and post-tensioned multi-story buildings. It provides methods for developing safe construction schedules and provides design examples. It is written for the use of form-work engineer/contractors and engineer/architects. Keywords: construction loads; falsework; form removal, formwork; post-tensioning; reshoring; shoring.

PDF Catalog

PDF Pages PDF Title
1 CONTENTS
2 CHAPTER 1— INTRODUCTION
CHAPTER 2— SHORING/RESHORING CONSTRUCTION NEEDS
2.1—Definitions
3 2.2—Advantages of reshoring
2.3—Types of forming systems
CHAPTER 3— CONSTRUCTION LOADS ON FORMWORK
3.1—Construction loads
4 3.1.1 Gravity loads
3.1.2 Lateral loads
3.1.3 Other loads and conditions
3.1.4 Post-Tensioning load distribution
3.2—Load combinations
3.3—Typical phases of construction
5 3.4—Construction load distribution
6 3.5—Application of the simplified method
3.6—Factors affecting the construction load distribution
3.6.1 Shore/reshore stiffness
7 3.6.2 Floor stiffness and type
3.6.3 Shore system configuration
3.6.4 Number of shored levels
3.6.5 Number of reshored levels
3.6.6 Rate of construction
3.7—Post-tensioning load redistribution
8 CHAPTER 4— STRENGTH ADEQUACY OF CONCRETE SLABS AND FORMWORK
4.1—Early-age concrete material strength development
4.1.1 Compressive strength
4.1.2 Tensile strength
4.1.3 Modulus of elasticity
9 4.2—Construction load factors
4.3—Early-age capacity of concrete slabs
4.3.1 Flexural strength
4.3.2 Shear strength
10 4.4—Serviceability requirements
4.5—Formwork adequacy
CHAPTER 5— CONSTRUCTION EXAMPLES
5.1— Two- way slab construction
5.1.1 Construction example data
11 5.1.2 Construction load distribution
12 5.1.3 Concrete strength development
5.1.4 Adequacy of concrete slabs
5.1.4.1 Available early-age slab load capacity
13 5.1.4.2 Applied construction load
5.1.4.3 Strength adequacy
5.1.4.4 Slab deflections
5.1.5 Adequacy of shoring/reshoring system
14 5.2—Post-tensioned construction example
5.2.1 Post-tensioned example data
5.2.1.1 Member sizes
5.2.1.2 Design loads
5.2.1.3 Concrete mixtures
5.2.1.4 Shoring system
5.2.1.5 Construction loads
5.2.1.6 Construction weather conditions
15 5.2.1.7 Construction rate
5.2.1.8 Post-tensioning sequence
5.2.2 Construction load distribution
5.2.2.1 Concrete placement stage
5.2.2.2 Post-tensioning stage
5.2.2.3 Post-tensioning of slabs
5.2.2.4 Post-tensioning of beams
16 5.2.2.5 Post-tensioning of girders
5.2.3 Adequacy of concrete members
17 5.2.4 Adequacy of shoring/reshoring system
5.2.4.1 Slab shores
5.2.4.2 Beam shores
5.2.4.3 Girder shores
CHAPTER 6— REFERENCES
6.1— Referenced standards and reports
18 6.2—Cited references
ACI 347.2R 05 2005
$22.48