{"id":449302,"date":"2024-10-20T09:01:50","date_gmt":"2024-10-20T09:01:50","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/icc-ifgc-2024-1stptg\/"},"modified":"2024-10-26T16:53:56","modified_gmt":"2024-10-26T16:53:56","slug":"icc-ifgc-2024-1stptg","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/icc\/icc-ifgc-2024-1stptg\/","title":{"rendered":"ICC IFGC 2024 1stptg"},"content":{"rendered":"
The 2024 International Codes\u00ae (I-Codes\u00ae) have undergone substantial formatting changes as part of the digital transformation strategy of the International Code Council\u00ae (ICC\u00ae) to improve the user experience. The changes, promoting a cleaner, more modern look and enhancing readability and sustainability, include: Single column text format and modernized font styles improves readability QR Codes replace vertical margin sidebars and arrows to identify code changes more accurately Shading for table headers and notes improves locating tables and applicable notes Grouping of associated content brings tables and figures immediately after the parent section Users have capability to validate authenticity of their book and register it with the ICC to receive incentives. The 2024 IFGC\u00ae addresses the design and installation of fuel gas systems and gas fired appliances through prescriptive and performance requirements. Key changes in the 2024 IFGC\u00ae include: Appendix D- D105.2, Test for combustion air and vent drafting for natural draft and Category I appliances. Existing code language has been deleted. The entire section is new for the 2024 Codes. [BS] 302.3.1 Engineered wood products. Sections 302.3.2, 302.3.3, and 302.3.4 have all been deleted. 304.1 -General. The entire section is new for the 2024 Codes. Existing code language has been deleted. The entire section is new for the 2024 Codes. 304.12 Protection from fumes and gases. Existing code language has been deleted. The entire section is new for the 2024 Codes. 403.6 Workmanship and defects. Existing code language has been rewritten and additional code language has been added for the 2024 Codes. Table 503.8- Note: Revisions to Table 503.8 are errata to the 2021 IFGS text that is also applicable to the 2024 IFGS text.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 2024 INTERNATIONAL FUEL GAS CODE\u00ae <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | 2024 INTERNATIONAL FUEL GAS CODE\u00ae <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | COPYRIGHT <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | NEW DESIGN FOR THE 2024 INTERNATIONAL CODES <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | PREFACE <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | CHAPTER 1 SCOPE AND ADMINISTRATION PART 1\u2014SCOPE AND APPLICATION SECTION 101 (IFGC)\u2014SCOPE AND GENERAL REQUIREMENTS <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | SECTION 102 (IFGC)\u2014APPLICABILITY <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | PART 2\u2014ADMINISTRATION AND ENFORCEMENT SECTION 103 (IFGC)\u2014CODE COMPLIANCE AGENCY SECTION 104 (IFGC)\u2014DUTIES AND POWERS OF THE CODE OFFICIAL <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | SECTION 105 (IFGC)\u2014PERMITS <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | SECTION 106 (IFGC)\u2014CONSTRUCTION DOCUMENTS <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | SECTION 107 (IFGC)\u2014NOTICE OF APPROVAL SECTION 108 (IFGC)\u2014FEES SECTION 109 (IFGC)\u2014SERVICE UTILITIES <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | SECTION 110 (IFGC)\u2014TEMPORARY USES, EQUIPMENT AND SYSTEMS SECTION 111 (IFGC)\u2014INSPECTIONS AND TESTING <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | SECTION 112 (IFGC)\u2014MEANS OF APPEALS SECTION 113 (IFGC)\u2014VIOLATIONS <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | SECTION 114 (IFGC)\u2014STOP WORK ORDER <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | CHAPTER 2 DEFINITIONS SECTION 201 (IFGC)\u2014GENERAL SECTION 202 (IFGC)\u2014GENERAL DEFINITIONS <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | CHAPTER 3 GENERAL REGULATIONS SECTION 301 (IFGC)\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | SECTION 302 (IFGC)\u2014STRUCTURAL SAFETY SECTION 303 (IFGC)\u2014APPLIANCE LOCATION <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | SECTION 304 (IFGS)\u2014COMBUSTION, VENTILATION AND DILUTION AIR EQUATION 3-1 EQUATION 3-2 <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | FIGURE 304.5.3\u2014ALL AIR FROM INSIDE THE BUILDING (see Section 304.5.3) <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | FIGURE 304.6.1(1)\u2014ALL AIR FROM OUTDOORS\u2014INLET AIR FROM VENTILATED CRAWL SPACE AND OUTLET AIR TO VENTILATED ATTIC (see Section 304.6.1) FIGURE 304.6.1(2)\u2014ALL AIR FROM OUTDOORS THROUGH VENTILATED ATTIC (see Section 304.6.1) <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | FIGURE 304.6.1(3)\u2014ALL AIR FROM OUTDOORS (see Section 304.6.1) FIGURE 304.6.2\u2014SINGLE COMBUSTION AIR OPENING, ALL AIR FROM THE OUTDOORS (see Section 304.6.2) <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | SECTION 305 (IFGC)\u2014INSTALLATION <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | SECTION 306 (IFGC)\u2014ACCESS AND SERVICE SPACE <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | SECTION 307 (IFGC)\u2014CONDENSATE DISPOSAL SECTION 308 (IFGS)\u2014CLEARANCE REDUCTION <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | TABLE 308.2\u2014REDUCTION OF CLEARANCES WITH SPECIFIED FORMS OF PROTECTIONa through k <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | FIGURE 308.2(1)\u2014EXTENT OF PROTECTION NECESSARY TO REDUCE CLEARANCES FROM APPLIANCE OR VENT CONNECTIONS FIGURE 308.2(2)\u2014WALL PROTECTOR CLEARANCE REDUCTION SYSTEM FIGURE 308.2(3)\u2014MASONRY CLEARANCE REDUCTION SYSTEM <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | SECTION 309 (IFGC)\u2014ELECTRICAL SECTION 310 (IFGS)\u2014ELECTRICAL BONDING <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | CHAPTER 4 GAS PIPING INSTALLATIONS SECTION 401 (IFGC)\u2014GENERAL SECTION 402 (IFGS)\u2014PIPE SIZING <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | EQUATION 4-1 EQUATION 4-2 TABLE 402.4\u2014Cr AND Y VALUES FOR NATURAL GAS AND UNDILUTED PROPANE AT STANDARD CONDITIONS <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | TABLE 402.4(1)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | TABLE 402.4(1)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued TABLE 402.4(2)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | TABLE 402.4(2)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued TABLE 402.4(3)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | TABLE 402.4(3)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | TABLE 402.4(4)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | TABLE 402.4(4)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued TABLE 402.4(5)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | TABLE 402.4(5)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued TABLE 402.4(6)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | TABLE 402.4(6)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | TABLE 402.4(7)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | TABLE 402.4(7)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued TABLE 402.4(8)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | TABLE 402.4(8)\u2014SEMIRIGID COPPER TUBING\u2014continued TABLE 402.4(9)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | TABLE 402.4(9)\u2014SEMIRIGID COPPER TUBING\u2014continued <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | TABLE 402.4(9)\u2014SEMIRIGID COPPER TUBING\u2014continued TABLE 402.4(10)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | TABLE 402.4(10)\u2014SEMIRIGID COPPER TUBING\u2014continued <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | TABLE 402.4(11)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | TABLE 402.4(11)\u2014SEMIRIGID COPPER TUBING\u2014continued TABLE 402.4(12)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | TABLE 402.4(12)\u2014SEMIRIGID COPPER TUBING\u2014continued <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | TABLE 402.4(13)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | TABLE 402.4(13)\u2014SEMIRIGID COPPER TUBING\u2014continued TABLE 402.4(14)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | TABLE 402.4(14)\u2014SEMIRIGID COPPER TUBING\u2014continued <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | TABLE 402.4(15)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST) TABLE 402.4(16)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST) <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | TABLE 402.4(16)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST)\u2014continued TABLE 402.4(17)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST) <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | TABLE 402.4(17)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST)\u2014continued TABLE 402.4(18)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST) <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | TABLE 402.4(18)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST)\u2014continued TABLE 402.4(19)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST) <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | TABLE 402.4(20)\u2014POLYETHYLENE PLASTIC PIPE TABLE 402.4(21)\u2014POLYETHYLENE PLASTIC PIPE <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | TABLE 402.4(21)\u2014POLYETHYLENE PLASTIC PIPE\u2014continued TABLE 402.4(22)\u2014POLYETHYLENE PLASTIC PIPE <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | TABLE 402.4(22)\u2014POLYETHYLENE PLASTIC PIPE\u2014continued <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | TABLE 402.4(23)\u2014POLYETHYLENE PLASTIC PIPE <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | TABLE 402.4(24)\u2014POLYETHYLENE PLASTIC PIPE <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | TABLE 402.4(25)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | TABLE 402.4(25)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued TABLE 402.4(26)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | TABLE 402.4(26)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued TABLE 402.4(27)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | TABLE 402.4(27)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | TABLE 402.4(27)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued TABLE 402.4(28)\u2014SCHEDULE 40 METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | TABLE 402.4(28)\u2014SCHEDULE 40 METALLIC PIPE\u2014continued <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | TABLE 402.4(29)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | TABLE 402.4(29)\u2014SEMIRIGID COPPER TUBING\u2014continued TABLE 402.4(30)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | TABLE 402.4(30)\u2014SEMIRIGID COPPER TUBING\u2014continued <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | TABLE 402.4(31)\u2014SEMIRIGID COPPER TUBING <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | TABLE 402.4(31)\u2014SEMIRIGID COPPER TUBING\u2014continued TABLE 402.4(32)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST) <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | TABLE 402.4(32)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST)\u2014continued TABLE 402.4(33)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST) <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | TABLE 402.4(34)\u2014CORRUGATED STAINLESS STEEL TUBING (CSST) TABLE 402.4(35)\u2014POLYETHYLENE PLASTIC PIPE <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | TABLE 402.4(35)\u2014POLYETHYLENE PLASTIC PIPE\u2014continued TABLE 402.4(36)\u2014POLYETHYLENE PLASTIC PIPE <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | TABLE 402.4(36)\u2014POLYETHYLENE PLASTIC PIPE\u2014continued <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | TABLE 402.4(36)\u2014POLYETHYLENE PLASTIC PIPE\u2014continued TABLE 402.4(37)\u2014POLYETHYLENE PLASTIC PIPE <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | TABLE 402.4(37)\u2014POLYETHYLENE PLASTIC PIPE\u2014continued <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | SECTION 403 (IFGS)\u2014PIPING MATERIALS <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | TABLE 403.8.2\u2014SPECIFICATIONS FOR THREADING METALLIC PIPE <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | SECTION 404 (IFGC)\u2014PIPING SYSTEM INSTALLATION <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | SECTION 405 (IFGS)\u2014PIPING BENDS AND CHANGES IN DIRECTION SECTION 406 (IFGS)\u2014INSPECTION, TESTING AND PURGING <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | TABLE 406.7.1.1\u2014SIZE AND LENGTH OF PIPING <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | TABLE 406.7.1.1\u2014SIZE AND LENGTH OF PIPING\u2014continued <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | SECTION 407 (IFGC)\u2014PIPING SUPPORT SECTION 408 (IFGC)\u2014DRIPS AND SLOPED PIPING FIGURE 408.4\u2014METHOD OF INSTALLING A TEE FITTING SEDIMENT TRAP <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | SECTION 409 (IFGC)\u2014SHUTOFF VALVES TABLE 409.1.1\u2014MANUAL GAS VALVE STANDARDS <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | SECTION 410 (IFGC)\u2014FLOW CONTROLS SECTION 411 (IFGC)\u2014APPLIANCE AND MANUFACTURED HOME CONNECTIONS <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | SECTION 412 (IFGC)\u2014LIQUEFIED PETROLEUM GAS MOTOR VEHICLE FUEL-DISPENSING FACILITIES <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | SECTION 413 (IFGC)\u2014COMPRESSED NATURAL GAS MOTOR VEHICLE FUEL-DISPENSING FACILITIES <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | [F] TABLE 413.10.2.3\u2014SEPARATION DISTANCE FOR ATMOSPHERIC VENTING OF CNG <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | SECTION 414 (IFGC)\u2014SUPPLEMENTAL AND STANDBY GAS SUPPLY SECTION 415 (IFGS)\u2014PIPING SUPPORT INTERVALS TABLE 415.1\u2014SUPPORT OF PIPING SECTION 416 (IFGS)\u2014OVERPRESSURE PROTECTION DEVICES <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | CHAPTER 5 CHIMNEYS AND VENTS SECTION 501 (IFGC)\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | SECTION 502 (IFGC)\u2014VENTS <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | SECTION 503 (IFGS)\u2014VENTING OF APPLIANCES <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | TABLE 503.4\u2014TYPE OF VENTING SYSTEM TO BE USED <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | FIGURE 503.6.5\u2014TERMINATION LOCATIONS FOR GAS VENTS WITH LISTED CAPS 12 INCHES OR LESS IN SIZE NOT LESS THAN 8 FEET FROM A VERTICAL WALL <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | FIGURE 503.8\u2014THROUGH-THE-WALL VENT TERMINAL CLEARANCE TABLE 503.8\u2014THROUGH-THE-WALL VENT TERMINAL CLEARANCE <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | TABLE 503.10.2.4\u2014MINIMUM THICKNESS FOR GALVANIZED STEEL VENT CONNECTORS FOR LOW-HEAT APPLIANCES <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | TABLE 503.10.2.5\u2014MINIMUM THICKNESS FOR STEEL VENT CONNECTORS FOR MEDIUM-HEAT APPLIANCES TABLE 503.10.5\u2014CLEARANCES FOR CONNECTORSa <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | TABLE 503.10.5\u2014CLEARANCES FOR CONNECTORSa\u2014continued <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | SECTION 504 (IFGS)\u2014SIZING OF CATEGORY I APPLIANCE VENTING SYSTEMS <\/td>\n<\/tr>\n | ||||||
124<\/td>\n | TABLE 504.2(1)\u2014TYPE B DOUBLE-WALL GAS VENT <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | TABLE 504.2(1)\u2014TYPE B DOUBLE-WALL GAS VENT\u2014continued <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | TABLE 504.2(1)\u2014TYPE B DOUBLE-WALL GAS VENT <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | TABLE 504.2(1)\u2014TYPE B DOUBLE-WALL GAS VENT\u2014continued <\/td>\n<\/tr>\n | ||||||
128<\/td>\n | TABLE 504.2(2)\u2014TYPE B DOUBLE-WALL GAS VENT <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | TABLE 504.2(2)\u2014TYPE B DOUBLE-WALL GAS VENT\u2014continued <\/td>\n<\/tr>\n | ||||||
130<\/td>\n | TABLE 504.2(3)\u2014MASONRY CHIMNEY <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | TABLE 504.2(3)\u2014MASONRY CHIMNEY\u2014continued <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | TABLE 504.2(4)\u2014MASONRY CHIMNEY <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | TABLE 504.2(4)\u2014MASONRY CHIMNEY\u2014continued <\/td>\n<\/tr>\n | ||||||
134<\/td>\n | TABLE 504.2(5)\u2014SINGLE-WALL METAL PIPE OR TYPE B ASBESTOS CEMENT VENT <\/td>\n<\/tr>\n | ||||||
135<\/td>\n | TABLE 504.2(6)\u2014EXTERIOR MASONRY CHIMNEY <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | TABLE 504.2(6)\u2014EXTERIOR MASONRY CHIMNEY\u2014continued <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | TABLE 504.3(1)\u2014TYPE B DOUBLE-WALL VENT <\/td>\n<\/tr>\n | ||||||
139<\/td>\n | TABLE 504.3(1)\u2014TYPE B DOUBLE-WALL VENT\u2014continued <\/td>\n<\/tr>\n | ||||||
140<\/td>\n | TABLE 504.3(1)\u2014TYPE B DOUBLE-WALL VENT\u2014continued <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | TABLE 504.3(2)\u2014TYPE B DOUBLE-WALL VENT <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | TABLE 504.3(2)\u2014TYPE B DOUBLE-WALL VENT\u2014continued <\/td>\n<\/tr>\n | ||||||
143<\/td>\n | TABLE 504.3(3)\u2014MASONRY CHIMNEY <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | TABLE 504.3(3)\u2014MASONRY CHIMNEY\u2014continued <\/td>\n<\/tr>\n | ||||||
145<\/td>\n | TABLE 504.3(4)\u2014MASONRY CHIMNEY <\/td>\n<\/tr>\n | ||||||
146<\/td>\n | TABLE 504.3(4)\u2014MASONRY CHIMNEY\u2014continued <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | TABLE 504.3(5)\u2014SINGLE-WALL METAL PIPE OR TYPE ASBESTOS CEMENT VENT <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | TABLE 504.3(6a)\u2014EXTERIOR MASONRY CHIMNEY TABLE 504.3(6b)\u2014EXTERIOR MASONRY CHIMNEY <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | TABLE 504.3(6b)\u2014EXTERIOR MASONRY CHIMNEY\u2014continued TABLE 504.3(7a)\u2014EXTERIOR MASONRY CHIMNEY <\/td>\n<\/tr>\n | ||||||
150<\/td>\n | TABLE 504.3(7b)\u2014EXTERIOR MASONRY CHIMNEY <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | TABLE 504.3(7b)\u2014EXTERIOR MASONRY CHIMNEY\u2014continued TABLE 504.3.2\u2014MAXIMUM VENT CONNECTOR LENGTH <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | TABLE 504.3.2\u2014MAXIMUM VENT CONNECTOR LENGTH\u2014continued <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | SECTION 505 (IFGC)\u2014DIRECT-VENT, INTEGRAL VENT,MECHANICAL VENT AND VENTILATION\/EXHAUST HOOD VENTING SECTION 506 (IFGC)\u2014FACTORY-BUILT CHIMNEYS <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | CHAPTER 6 SPECIFIC APPLIANCES SECTION 601 (IFGC)\u2014GENERAL SECTION 602 (IFGC)\u2014DECORATIVE APPLIANCES FOR INSTALLATION IN FIREPLACES SECTION 603 (IFGC)\u2014LOG LIGHTERS SECTION 604 (IFGC)\u2014VENTED GAS FIREPLACES (DECORATIVE APPLIANCES) SECTION 605 (IFGC)\u2014VENTED GAS FIREPLACE HEATERS SECTION 606 (IFGC)\u2014INCINERATORS AND CREMATORIES SECTION 607 (IFGC)\u2014COMMERCIAL-INDUSTRIAL INCINERATORS SECTION 608 (IFGC)\u2014VENTED WALL FURNACES <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | SECTION 609 (IFGC)\u2014FLOOR FURNACES SECTION 610 (IFGC)\u2014DUCT FURNACES SECTION 611 (IFGC)\u2014NONRECIRCULATING DIRECT-FIRED INDUSTRIAL AIR HEATERS <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | SECTION 612 (IFGC)\u2014RECIRCULATING DIRECT-FIRED INDUSTRIAL AIR HEATERS SECTION 613 (IFGC)\u2014CLOTHES DRYERS SECTION 614 (IFGC)\u2014CLOTHES DRYER EXHAUST <\/td>\n<\/tr>\n | ||||||
158<\/td>\n | TABLE 614.9.4.1 [M] TABLE 614.9.4.1\u2014DRYER EXHAUST DUCT FITTING EQUIVALENT LENGTH <\/td>\n<\/tr>\n | ||||||
159<\/td>\n | SECTION 615 (IFGC)\u2014SAUNA HEATERS <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | SECTION 616 (IFGC)\u2014ENGINE AND GAS TURBINE-POWERED EQUIPMENT SECTION 617 (IFGC)\u2014POOL AND SPA HEATERS SECTION 618 (IFGC)\u2014FORCED-AIR WARM-AIR FURNACES <\/td>\n<\/tr>\n | ||||||
161<\/td>\n | SECTION 619 (IFGC)\u2014CONVERSION BURNERS SECTION 620 (IFGC)\u2014UNIT HEATERS SECTION 621 (IFGC)\u2014UNVENTED ROOM HEATERS <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | SECTION 622 (IFGC)\u2014VENTED ROOM HEATERS SECTION 623 (IFGC)\u2014COOKING APPLIANCES SECTION 624 (IFGC)\u2014WATER HEATERS SECTION 625 (IFGC)\u2014REFRIGERATORS SECTION 626 (IFGC)\u2014GAS-FIRED TOILETS <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | SECTION 627 (IFGC)\u2014AIR-CONDITIONING APPLIANCES SECTION 628 (IFGC)\u2014ILLUMINATING APPLIANCES <\/td>\n<\/tr>\n | ||||||
164<\/td>\n | SECTION 629 (IFGC)\u2014SMALL CERAMIC KILNS SECTION 630 (IFGC)\u2014INFRARED RADIANT HEATERS SECTION 631 (IFGC)\u2014BOILERS SECTION 632 (IFGC)\u2014EQUIPMENT INSTALLED IN EXISTING UNLISTED BOILERS SECTION 633 (IFGC)\u2014STATIONARY FUEL-CELL POWER SYSTEMS SECTION 634 (IFGC)\u2014GASEOUS HYDROGEN SYSTEMS SECTION 635 (IFGC)\u2014OUTDOOR DECORATIVE APPLIANCES <\/td>\n<\/tr>\n | ||||||
165<\/td>\n | CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 (IFGC)\u2014GENERAL SECTION 702 (IFGC)\u2014GENERAL DEFINITIONS SECTION 703 (IFGC)\u2014GENERAL REQUIREMENTS <\/td>\n<\/tr>\n | ||||||
166<\/td>\n | SECTION 704 (IFGC)\u2014PIPING, USE AND HANDLING <\/td>\n<\/tr>\n | ||||||
167<\/td>\n | SECTION 705 (IFGC)\u2014TESTING OF HYDROGEN PIPING SYSTEMS <\/td>\n<\/tr>\n | ||||||
168<\/td>\n | SECTION 706 (IFGC)\u2014LOCATION OF GASEOUS HYDROGEN SYSTEMS SECTION 707 (IFGC)\u2014OPERATION AND MAINTENANCE OF GASEOUS HYDROGEN SYSTEMS SECTION 708 (IFGC)\u2014DESIGN OF LIQUEFIED HYDROGEN SYSTEMS ASSOCIATED WITH HYDROGEN VAPORIZATION OPERATIONS <\/td>\n<\/tr>\n | ||||||
169<\/td>\n | CHAPTER 8 REFERENCED STANDARDS (IFGC\/IFGS) AISI ANSI <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | ASME ASSP ASTM <\/td>\n<\/tr>\n | ||||||
172<\/td>\n | CGA CSA DOTn <\/td>\n<\/tr>\n | ||||||
173<\/td>\n | ICC MSS NFPA SMACNA <\/td>\n<\/tr>\n | ||||||
174<\/td>\n | UL <\/td>\n<\/tr>\n | ||||||
175<\/td>\n | APPENDIX A SIZING AND CAPACITIES OF GAS PIPING (IFGS) SECTION A101\u2014GENERAL PIPING CONSIDERATIONS SECTION A102\u2014DESCRIPTION OF TABLES <\/td>\n<\/tr>\n | ||||||
176<\/td>\n | TABLE A102.2\u2014EQUIVALENT LENGTHS OF PIPE FITTINGS AND VALVES <\/td>\n<\/tr>\n | ||||||
177<\/td>\n | TABLE A102.2\u2014EQUIVALENT LENGTHS OF PIPE FITTINGS AND VALVES\u2014continued TABLE A102.4\u2014MULTIPLIERS TO BE USED WITHTABLES 402.4(1) THROUGH 402.4(22) WHERE THE SPECIFIC GRAVITY OF THE GAS IS OTHER THAN 0.60 <\/td>\n<\/tr>\n | ||||||
178<\/td>\n | SECTION A103\u2014USE OF CAPACITY TABLES <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | EQUATION A-1 EQUATION A-2 <\/td>\n<\/tr>\n | ||||||
180<\/td>\n | TABLE A103.4\u2014THOUSANDS OF BTU\/H (MBH) OF NATURAL GAS PER 100 FEET OF PIPE AT VARIOUS PRESSURE DROPS AND PIPE DIAMETERS SECTION A104\u2014USE OF SIZING EQUATIONS SECTION A105\u2014PIPE AND TUBE DIAMETERS TABLE A105.1\u2014SCHEDULE 40 STEEL PIPE STANDARD SIZES <\/td>\n<\/tr>\n | ||||||
181<\/td>\n | TABLE A105.1\u2014SCHEDULE 40 STEEL PIPE STANDARD SIZES\u2014continued TABLE A105.2\u2014COPPER TUBE STANDARD SIZES <\/td>\n<\/tr>\n | ||||||
182<\/td>\n | SECTION A106\u2014EXAMPLES OF PIPING SYSTEM DESIGN AND SIZING FIGURE A106.1\u2014PIPING PLAN SHOWING A STEEL PIPING SYSTEM <\/td>\n<\/tr>\n | ||||||
183<\/td>\n | FIGURE A106.2\u2014PIPING PLAN SHOWING A CSST SYSTEM <\/td>\n<\/tr>\n | ||||||
184<\/td>\n | FIGURE A106.3\u2014PIPING PLAN SHOWING A COPPER TUBING SYSTEM <\/td>\n<\/tr>\n | ||||||
185<\/td>\n | FIGURE A106.4\u2014PIPING PLAN SHOWING A MODIFICATION TO EXISTING PIPING SYSTEM <\/td>\n<\/tr>\n | ||||||
187<\/td>\n | APPENDIX B SIZING OF VENTING SYSTEMS SERVING APPLIANCES EQUIPPED WITH DRAFT HOODS, CATEGORY I APPLIANCES AND APPLIANCES LISTEDFOR USE WITH TYPE B VENTS (IFGS) SECTION B101\u2014EXAMPLES USING SINGLE-APPLIANCE VENTING TABLES FIGURE B101.1\u2014EXAMPLE 1\u2014SINGLE DRAFT-HOOD-EQUIPPED APPLIANCE <\/td>\n<\/tr>\n | ||||||
188<\/td>\n | FIGURE B101.2\u2014EXAMPLE 2\u2014SINGLE FAN-ASSISTED APPLIANCE <\/td>\n<\/tr>\n | ||||||
189<\/td>\n | FIGURE B101.4(1)\u2014TYPE B DOUBLE-WALL VENT SYSTEM SERVING A SINGLE APPLIANCE WITH A TYPE B DOUBLE-WALL VENT FIGURE B101.4(2)\u2014TYPE B DOUBLE-WALL VENT SYSTEM SERVING A SINGLE APPLIANCE WITH A SINGLE-WALL METAL VENT CONNECTOR <\/td>\n<\/tr>\n | ||||||
190<\/td>\n | FIGURE B101.4(3)\u2014VENT SYSTEM SERVING A SINGLE APPLIANCE WITH A MASONRY CHIMNEY OF TYPE B DOUBLE-WALL VENT CONNECTOR FIGURE B101.4(4)\u2014VENT SYSTEM SERVING A SINGLE APPLIANCE USING A MASONRY CHIMNEY AND A SINGLE-WALL METAL VENT CONNECTOR <\/td>\n<\/tr>\n | ||||||
191<\/td>\n | FIGURE B101.4(5)\u2014ASBESTOS CEMENT TYPE B OR SINGLE-WALL METAL VENT SYSTEM SERVING A SINGLE DRAFT-HOOD-EQUIPPED APPLIANCE SECTION B102\u2014EXAMPLES USING COMMON VENTING TABLES <\/td>\n<\/tr>\n | ||||||
192<\/td>\n | FIGURE B102.1\u2014EXAMPLE 4\u2014COMMON VENTING TWO DRAFT-HOOD-EQUIPPED APPLIANCES <\/td>\n<\/tr>\n | ||||||
193<\/td>\n | FIGURE B102.2\u2014EXAMPLE 5A\u2014COMMON VENTING A DRAFT HOOD WITHA FAN-ASSISTED FURNACE INTO A TYPE B DOUBLE-WALL COMMON VENT <\/td>\n<\/tr>\n | ||||||
194<\/td>\n | TABLE B102.3\u2014MASONRY CHIMNEY LINER DIMENSIONS WITH CIRCULAR EQUIVALENTSa <\/td>\n<\/tr>\n | ||||||
195<\/td>\n | FIGURE B102.5(1)\u2014VENT SYSTEM SERVING TWO OR MORE APPLIANCES WITHTYPE B DOUBLE-WALL VENT AND TYPE B DOUBLE-WALL VENT CONNECTOR <\/td>\n<\/tr>\n | ||||||
196<\/td>\n | FIGURE B102.5(2)\u2014VENT SYSTEM SERVING TWO OR MORE APPLIANCESWITH TYPE B DOUBLE-WALL VENT AND SINGLE-WALL METAL VENT CONNECTORS FIGURE B102.5(3)\u2014MASONRY CHIMNEY SERVING TWO OR MORE APPLIANCES WITH TYPE B DOUBLE-WALL VENT CONNECTOR <\/td>\n<\/tr>\n | ||||||
197<\/td>\n | FIGURE B102.5(4)\u2014MASONRY CHIMNEY SERVING TWO OR MORE APPLIANCES WITH SINGLE-WALL METAL VENT CONNECTORS FIGURE B102.5(5)\u2014ASBESTOS CEMENT TYPE B OR SINGLE-WALL METALVENT SYSTEM SERVING TWO OR MORE DRAFT-HOOD-EQUIPPED APPLIANCES <\/td>\n<\/tr>\n | ||||||
198<\/td>\n | FIGURE B102.5(6)\u2014USE OF MANIFOLD COMMON VENT CONNECTOR FIGURE B102.5(7)\u2014USE OF OFFSET COMMON VENT <\/td>\n<\/tr>\n | ||||||
199<\/td>\n | FIGURE B102.5(8)\u2014MULTISTORY GAS VENT DESIGN PROCEDURE FOR EACH SEGMENT OF SYSTEM <\/td>\n<\/tr>\n | ||||||
200<\/td>\n | FIGURE B102.5(9)\u2014MULTISTORY VENT SYSTEMS <\/td>\n<\/tr>\n | ||||||
201<\/td>\n | FIGURE B102.5(10)\u2014NATIONAL FUEL GAS CODE 99-PERCENT WINTER DESIGN TEMPERATURES FOR THE CONTIGUOUS UNITED STATES <\/td>\n<\/tr>\n | ||||||
202<\/td>\n | APPENDIX C RECOMMENDED PROCEDURE FOR SAFETY INSPECTION OF AN EXISTING APPLIANCE INSTALLATION (IFGS) SECTION C101\u2014GENERAL SECTION C102\u2014OCCUPANT AND INSPECTOR SAFETY <\/td>\n<\/tr>\n | ||||||
203<\/td>\n | SECTION C103\u2014GAS PIPING AND CONNECTIONS INSPECTIONS SECTION C104\u2014INSPECTIONS TO BE PERFORMED WITH THE APPLIANCE NOT OPERATING <\/td>\n<\/tr>\n | ||||||
204<\/td>\n | SECTION C105\u2014INSPECTIONS TO BE PERFORMED WITH THE APPLIANCE OPERATING <\/td>\n<\/tr>\n | ||||||
205<\/td>\n | SECTION C106\u2014APPLIANCE-SPECIFIC INSPECTIONS <\/td>\n<\/tr>\n | ||||||
207<\/td>\n | TABLE C106\u2014CO THRESHOLDS <\/td>\n<\/tr>\n | ||||||
208<\/td>\n | APPENDIX D BOARD OF APPEALS (IFGC) SECTION D101\u2014GENERAL <\/td>\n<\/tr>\n | ||||||
210<\/td>\n | INDEX <\/td>\n<\/tr>\n | ||||||
212<\/td>\n | ICC EVALUATION SERVICE\u00ae <\/td>\n<\/tr>\n | ||||||
213<\/td>\n | ICC CREDENTIALING <\/td>\n<\/tr>\n | ||||||
214<\/td>\n | ICC CHANGES TO THE CODE DEVELOPMENT PROCESS <\/td>\n<\/tr>\n | ||||||
215<\/td>\n | ICC DIGITAL CODES PREMIUM\u00ae <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" International Fuel Gas Code<\/b><\/p>\n |