{"id":434980,"date":"2024-10-20T07:47:07","date_gmt":"2024-10-20T07:47:07","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-23-30458353-dc-2023\/"},"modified":"2024-10-26T14:45:44","modified_gmt":"2024-10-26T14:45:44","slug":"bsi-23-30458353-dc-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-23-30458353-dc-2023\/","title":{"rendered":"BSI 23\/30458353 DC 2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | 1 Modification to Introduction 2 Modification to Clause\u00a02, \u201cNormative references\u201d 3 Modification to Clause\u00a03, \u201cTerms and definitions\u201d <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 4 Modification to Clause\u00a04, \u201cRequirements on generating plants\u201d 4.1 Modifcation to subclause 4.1, \u201cGeneral\u201d <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 4.2 Modification to subclause 4.5, \u201cImmunity to disturbances\u201d 4.2.1 Modification to subclause 4.5.1, \u201cGeneral\u201d 4.2.2 Modification to subclause 4.5.2, \u201cRate of change of frequency (ROCOF) immunity\u201d 4.2.3 Modification to subclause 4.5.3, \u201cUnder-voltage ride through (UVRT)\u201d 4.2.3.1 Modification to subclause 4.5.3.1, \u201cGeneral\u201d 4.2.4 Modification to subclause 4.5.4, \u201cOver-voltage ride through (OVRT)\u201d <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 4.2.5 Addition of subclause 4.5.5, \u201cPhase jump immunity\u201d <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4.3 Modification to subclause 4.6, \u201cActive response to frequency deviation\u201d 4.3.1 Modification to subclause 4.6.1, \u201cPower response to overfrequency\u201d 4.4 Modification to subclause 4.7, \u201cPower response to voltage changes\u201d 4.4.1 Modification to subclause 4.7.2, \u201cVoltage support by reactive power\u201d 4.4.1.1 Modification to subclause 4.7.2.2, \u201cCapabilities\u201d <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4.4.2 Modification to subclause 4.7.3, \u201cVoltage related active power reduction\u201d 4.5 Modification to subclause 4.9, \u201cInterface protection\u201d 4.5.1 Modification to subclause 4.9.3, \u201cRequirements on voltage and frequency protection\u201d 4.5.1.1 Modification to subclause 4.9.3.2, \u201cUndervoltage protection [27]\u201d 4.5.1.2 Modification to subclause 4.9.3.3, \u201cOvervoltage protection [59]\u201d 4.6 Modification of subclause 4.11, \u201cCeasing and reduction of active power on set point\u201d 4.6.1 Modification of subclause 4.11.2, \u201cReduction of active power on set point\u201d 5 Modification to Annex\u00a0C, \u201cParameter Table\u201d <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6 Modification to Annex\u00a0D, \u201cList of national requirements applicable for generating plants\u201d 7 Modification to Annex\u00a0F, \u201cExamples of protection strategies\u201d <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS EN 50549-2 AMD 1. Requirements for generating plants to be connected in parallel with distribution networks – Part 2. Connection to a MV distribution network. Generating plants up to and including Type B<\/b><\/p>\n |