{"id":416706,"date":"2024-10-20T06:12:12","date_gmt":"2024-10-20T06:12:12","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-220102022-tc\/"},"modified":"2024-10-26T11:31:31","modified_gmt":"2024-10-26T11:31:31","slug":"bs-iso-220102022-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-220102022-tc\/","title":{"rendered":"BS ISO 22010:2022 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 30466393 <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | A-30426329 <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 4 Abbreviated terms 5 Mass properties control plan 5.1 General 5.2 Control process 5.2.1 Basis of the process <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 5.2.2 Requirements definition 5.2.3 Mass reduction plan 5.2.4 Mass properties control board (MPCB) 5.2.5 Mass allocation and trend analysis <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 5.2.6 Mass properties monitoring 5.2.7 Subcontractor mass properties control 5.3 Documentation 5.3.1 General 5.3.2 Control plan 5.3.3 Report plan 5.3.4 Analysis plan <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 5.3.5 Verification plan 5.3.6 Status reports 5.3.7 Trend analysis reports <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 5.4 Analysis 5.4.1 General 5.4.2 Flight hardware analysis <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 5.4.3 Ground handling 5.4.4 Special analysis <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 5.4.5 Verification <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Annex A (informative) Mass growth guidelines <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Space systems. Mass properties control<\/b><\/p>\n |