{"id":379763,"date":"2024-10-20T03:03:54","date_gmt":"2024-10-20T03:03:54","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-174432021\/"},"modified":"2024-10-26T05:31:13","modified_gmt":"2024-10-26T05:31:13","slug":"bs-en-174432021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-174432021\/","title":{"rendered":"BS EN 17443:2021"},"content":{"rendered":"
This document specifies the essential requirements of stationary systems for production of brines for winter road maintenance and includes tests of these requirements. Installation boundary: chloride and water inlet to the saturator, brine outlet to the spreading machine. Within the scope are materials, brine storage and brine loading\/unloading equipment also. Mobile systems for production of brines in situ<\/i> are not content of this document.<\/p>\n
The following points are not covered by this document:<\/p>\n
System and construction requirements;<\/p>\n<\/li>\n
Requirements according to national and European legislations.<\/p>\n<\/li>\n<\/ol>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | European foreword <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 4 Materials 4.1 Chlorides 4.2 Water <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 5 Requirements 5.1 Brine production capacity 5.2 Brine concentration 5.3 Brine purity 5.3.1 General 5.3.2 Content of water insoluble matter <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 5.3.3 Size of suspended particles 5.4 Other requirements 5.4.1 Additional components <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.4.2 Pumping system 5.4.3 Blending systems 5.4.4 Protection of the environment 6 Sampling <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 7 Test methods 7.1 General 7.2 Brine production capacity 7.2.1 Direct method 7.2.2 Indirect method <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 7.3 Brine concentration 7.4 Brine purity 7.4.1 General 7.4.2 Content of water insoluble matter 7.4.3 Size of suspended particles 8 Safety requirements at design stage and for use <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Annex A (informative) Systems for continuous and batch production of brine (examples, schematic drawings) <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Annex B (normative) Sampling of the produced brine <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Annex C (informative) Conversion factors: Used amount of water\/produced quantity of brine <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Winter service equipment. Brine production systems. Requirements and test methods<\/b><\/p>\n |