{"id":224736,"date":"2024-10-19T14:36:16","date_gmt":"2024-10-19T14:36:16","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-533-1r-2020\/"},"modified":"2024-10-25T08:22:41","modified_gmt":"2024-10-25T08:22:41","slug":"aci-533-1r-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-533-1r-2020\/","title":{"rendered":"ACI 533.1R 2020"},"content":{"rendered":"

Architectural precast concrete is a subcategory of concrete construction that involves the same basic entities as other concrete construction, but is cast in a plant and has a more decorative appeal by using color, texture, distinguished surface finishes, or all of these. This document outlines the responsibilities for various parties of the design\/construction team for architectural precast concrete projects and does not necessarily apply to concrete or precast concrete in general. Keywords: architect; architectural precast concrete; construction manager; general contractor; owner; precaster; specialty structural engineer; structural engineer of record.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nTITLE PAGE <\/td>\n<\/tr>\n
4<\/td>\nCHAPTER 1\u2014INTRODUCTION AND SCOPE
1.1\u2014Introduction
1.2\u2014Scope
CHAPTER 2\u2014DEFINITIONS <\/td>\n<\/tr>\n
5<\/td>\nCHAPTER 3\u2014GENERAL RESPONSIBILITIES
3.1\u2014Owner responsibilities <\/td>\n<\/tr>\n
6<\/td>\n3.2\u2014Architect responsibilities <\/td>\n<\/tr>\n
7<\/td>\n3.3\u2014Structural engineer of record responsibilities <\/td>\n<\/tr>\n
8<\/td>\n3.4\u2014General contractor\/construction manager responsibilities <\/td>\n<\/tr>\n
9<\/td>\n3.5\u2014Precaster responsibilities <\/td>\n<\/tr>\n
10<\/td>\n3.6\u2014Specialty structural engineer responsibilities <\/td>\n<\/tr>\n
11<\/td>\n3.7\u2014Erector responsibilities
CHAPTER 4\u2014HARDWARE RESPONSIBILITY
4.1\u2014Hardware supply
4.2\u2014Building frames of cast-in-place concrete
4.3\u2014Building frame of structural steel <\/td>\n<\/tr>\n
12<\/td>\n4.4\u2014Accessories and hardware provided by the precaster
CHAPTER 5\u2014PROCUREMENT AND BID PROCESS <\/td>\n<\/tr>\n
13<\/td>\nCHAPTER 6\u2014REFERENCES <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ACI 533.1R-20: Guide for Design and Construction Responsibilities for Architectural Precast Concrete<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ACI<\/b><\/a><\/td>\n2020<\/td>\n16<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":224738,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2650],"product_tag":[],"class_list":{"0":"post-224736","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-aci","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/224736","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/224738"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=224736"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=224736"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=224736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}