{"id":186322,"date":"2024-10-19T11:41:52","date_gmt":"2024-10-19T11:41:52","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ca-caltrans-stdspecs-2015\/"},"modified":"2024-10-25T04:06:03","modified_gmt":"2024-10-25T04:06:03","slug":"ca-caltrans-stdspecs-2015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ca\/ca-caltrans-stdspecs-2015\/","title":{"rendered":"CA Caltrans StdSpecs 2015"},"content":{"rendered":"

None<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
7<\/td>\nDIVISION I GENERAL PROVISIONS
1 GENERAL
1-1.01 GENERAL <\/td>\n<\/tr>\n
8<\/td>\n1-1.02 STYLE VARIATIONS
1-1.03\u20131-1.04 RESERVED
1-1.05 REFERENCES <\/td>\n<\/tr>\n
9<\/td>\n1-1.06 ABBREVIATIONS <\/td>\n<\/tr>\n
13<\/td>\n1-1.07 DEFINITIONS
1-1.07A General
1-1.07B Glossary <\/td>\n<\/tr>\n
19<\/td>\n1-1.08 DISTRICTS <\/td>\n<\/tr>\n
20<\/td>\n1-1.09 FREEZE-THAW AREAS
1-1.10 PAVEMENT CLIMATE REGIONS <\/td>\n<\/tr>\n
21<\/td>\n1-1.11 WEBSITES, ADDRESSES, AND TELEPHONE NUMBERS <\/td>\n<\/tr>\n
23<\/td>\n1-1.12 MISCELLANY
1-1.13\u20131-1.15 RESERVED <\/td>\n<\/tr>\n
25<\/td>\n2 BIDDING
2-1.01 GENERAL
2-1.02 BID INELIGIBILITY
2-1.03 CONTRACTOR REGISTRATION
2-1.04\u20132-1.05 RESERVED
2-1.06 BID DOCUMENTS
2-1.06A General
2-1.06B Supplemental Project Information <\/td>\n<\/tr>\n
26<\/td>\n2-1.06C\u20132-1.06D Reserved
2-1.07 JOB SITE AND DOCUMENT EXAMINATION
2-1.08 RESERVED
2-1.09 BID ITEM LIST
2-1.10 SUBCONTRACTOR LIST
2-1.11 RESERVED
2-1.12 DISADVANTAGED BUSINESS ENTERPRISES
2-1.12A General <\/td>\n<\/tr>\n
27<\/td>\n2-1.12B Disadvantaged Business Enterprise Goal
2-1.12B(1) General <\/td>\n<\/tr>\n
28<\/td>\n2-1.12B(2) DBE Commitment Submittal
2-1.12B(3) DBE Good Faith Efforts Submittal
2-1.13\u20132-1.14 RESERVED
2-1.15 DISABLED VETERAN BUSINESS ENTERPRISES
2-1.15A General
2-1.15B Projects $5 Million or Less
2-1.15C Projects More Than $5 Million
2-1.15C(1) General <\/td>\n<\/tr>\n
29<\/td>\n2-1.15C(2) DVBE Incentive
2-1.15C(3) Incentive Evaluation
2-1.16\u20132-1.17 RESERVED
2-1.18 SMALL BUSINESS AND NON\u2013SMALL BUSINESS SUBCONTRACTOR PREFERENCES
2-1.18A General
2-1.18B Small Business Preference <\/td>\n<\/tr>\n
30<\/td>\n2-1.18C Non\u2013Small Business Subcontractor Preference
2-1.19\u20132-1.26 RESERVED
2-1.27 CALIFORNIA COMPANIES <\/td>\n<\/tr>\n
31<\/td>\n2-1.28\u20132-1.30 RESERVED
2-1.31 OPT OUT OF PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS
2-1.32 RESERVED
2-1.33 BID DOCUMENT COMPLETION AND SUBMITTAL
2-1.33A General
2-1.33B Electronic Bids
2-1.33C Paper Bids
2-1.33D Bid Form Submittal Schedules
2-1.33D(1) General
2-1.33D(2) Federal-Aid Contracts
2-1.33D(2)(a) General
2-1.33D(2)(b) Contracts with a DBE Goal <\/td>\n<\/tr>\n
32<\/td>\n2-1.33D(2)(c) Contracts without a DBE Goal
2-1.33D(2)(d)\u20132-1.33D(2)(h) Reserved
2-1.33D(3) Non-Federal-Aid Contracts
2-1.33D(3)(a) General
2-1.33D(3)(b) Contracts with a DVBE Goal <\/td>\n<\/tr>\n
33<\/td>\n2-1.33D(3)(c) Contracts without a DVBE Goal
2-1.33D(3)(d)\u20132-1.33D(3)(h) Reserved
2-1.33D(4)\u20132-1.33D(9) Reserved
2-1.34 BIDDER’S SECURITY
2-1.35\u20132-1.39 RESERVED
2-1.40 BID WITHDRAWAL <\/td>\n<\/tr>\n
34<\/td>\n2-1.41\u20132-1.42 RESERVED
2-1.43 BID OPENING
2-1.44\u20132-1.45 RESERVED
2-1.46 DEPARTMENT’S DECISION ON BID
2-1.47 BID RELIEF
2-1.48 RESERVED
2-1.49 SUBMITTAL FAILURE HISTORY
2-1.50 BID RIGGING <\/td>\n<\/tr>\n
35<\/td>\n3 CONTRACT AWARD AND EXECUTION
3-1.01 GENERAL
3-1.02 CONSIDERATION OF BIDS
3-1.02A General
3-1.02B Tied Bids
3-1.03 CONTRACTOR REGISTRATION
3-1.04 CONTRACT AWARD
3-1.05 CONTRACT BONDS (PUB CONT CODE \u00a7\u00a7 10221 AND 10222) <\/td>\n<\/tr>\n
36<\/td>\n3-1.06 CONTRACTOR LICENSE
3-1.07 INSURANCE POLICIES
3-1.08 SMALL BUSINESS PARTICIPATION REPORT
3-1.09\u20133-1.10 RESERVED
3-1.11 PAYEE DATA RECORD
3-1.12 RESERVED
3-1.13 FORM FHWA-1273
3-1.14\u20133-1.17 RESERVED
3-1.18 CONTRACT EXECUTION <\/td>\n<\/tr>\n
38<\/td>\n3-1.19 BIDDERS’ SECURITIES <\/td>\n<\/tr>\n
39<\/td>\n4 SCOPE OF WORK
4-1.01 GENERAL
4-1.02 INTENT
4-1.03 WORK DESCRIPTION
4-1.04 USE OF MATERIALS FOUND ON THE JOB SITE
4-1.05 CHANGES AND EXTRA WORK
4-1.05A General
4-1.05B Work-Character Changes
4-1.06 DIFFERING SITE CONDITIONS (23 CFR 635.109)
4-1.06A General
4-1.06B Contractor’s Notification <\/td>\n<\/tr>\n
40<\/td>\n4-1.06C Engineer’s Investigation and Decision
4-1.07 VALUE ENGINEERING
4-1.07A General
4-1.07B Value Engineering Change Proposal <\/td>\n<\/tr>\n
41<\/td>\n4-1.07C Value Analysis Workshop <\/td>\n<\/tr>\n
42<\/td>\n4-1.08\u20134-1.12 RESERVED
4-1.13 CLEANUP <\/td>\n<\/tr>\n
43<\/td>\n5 CONTROL OF WORK
5-1.01 GENERAL
5-1.02 CONTRACT COMPONENTS
5-1.03 ENGINEER’S AUTHORITY <\/td>\n<\/tr>\n
44<\/td>\n5-1.04\u20135-1.05 RESERVED
5-1.06 PROTESTS
5-1.07\u20135-1.08 RESERVED
5-1.09 PARTNERING
5-1.09A General <\/td>\n<\/tr>\n
45<\/td>\n5-1.09B Partnering Facilitator, Workshops, and Monthly Evaluation Surveys
5-1.09C Training in Partnering Skills Development
5-1.09D Payment <\/td>\n<\/tr>\n
46<\/td>\n5-1.10\u20135-1.11 RESERVED
5-1.12 ASSIGNMENT
5-1.13 SUBCONTRACTING
5-1.13A General
5-1.13B Disadvantaged Business Enterprises
5-1.13B(1) General <\/td>\n<\/tr>\n
47<\/td>\n5-1.13B(2) Disadvantaged Business Enterprises <\/td>\n<\/tr>\n
48<\/td>\n5-1.13C Disabled Veteran Business Enterprises
5-1.13D Non\u2013Small Businesses <\/td>\n<\/tr>\n
49<\/td>\n5-1.13E\u20135-1.13I Reserved
5-1.14\u20135-1.15 RESERVED
5-1.16 REPRESENTATIVE
5-1.17 CHARACTER OF WORKERS
5-1.18\u20135.19 RESERVED
5-1.20 COORDINATION WITH OTHER ENTITIES
5-1.20A General
5-1.20B Permits, Licenses, Agreements, and Certifications
5-1.20B(1) General
5-1.20B(2) Before Award
5-1.20B(3) After Award <\/td>\n<\/tr>\n
50<\/td>\n5-1.20B(4) Contractor\u2013Property Owner Agreement
5-1.20C Railroad Relations
5-1.20D Occupied Improvements within the Right-of-Way
5-1.20E Water Meter Charges
5-1.20F Irrigation Water Service Charges
5-1.20G\u20135-1.20J Reserved
5-1.21\u20135-1.22 RESERVED
5-1.23 SUBMITTALS
5-1.23A General <\/td>\n<\/tr>\n
51<\/td>\n5-1.23B Action Submittals
5-1.23B(1) General
5-1.23B(2) Shop Drawings <\/td>\n<\/tr>\n
52<\/td>\n5-1.23B(3)\u20135-1.23B(10) Reserved
5-1.23C Informational Submittals
5-1.24\u20135-1.25 RESERVED
5-1.26 CONSTRUCTION SURVEYS
5-1.27 RECORDS
5-1.27A General
5-1.27B Record Retention
5-1.27C Record Inspection, Copying, and Auditing <\/td>\n<\/tr>\n
53<\/td>\n5-1.27D Cost Accounting Records
5-1.27E Change Order Bills
5-1.28\u20135-1.29 RESERVED
5-1.30 NONCOMPLIANT AND UNAUTHORIZED WORK <\/td>\n<\/tr>\n
54<\/td>\n5-1.31 JOB SITE APPEARANCE
5-1.32 AREAS FOR USE
5-1.33 EQUIPMENT
5-1.34\u20135-1.35 RESERVED
5-1.36 PROPERTY AND FACILITY PRESERVATION
5-1.36A General <\/td>\n<\/tr>\n
55<\/td>\n5-1.36B Landscape
5-1.36C Railroad Property
5-1.36D Nonhighway Facilities <\/td>\n<\/tr>\n
56<\/td>\n5-1.36E Survey Monuments
5-1.37 MAINTENANCE AND PROTECTION
5-1.37A General
5-1.37B Load Limits
5-1.37B(1) General <\/td>\n<\/tr>\n
57<\/td>\n5-1.37B(2) Increased Load Carrying Capacity <\/td>\n<\/tr>\n
58<\/td>\n5-1.37B(3) Material Hauling Equipment Lane on Bridges
5-1.38 MAINTENANCE AND PROTECTION RELIEF
5-1.39 DAMAGE REPAIR AND RESTORATION
5-1.39A General
5-1.39B Damage Caused by an Act of God <\/td>\n<\/tr>\n
59<\/td>\n5-1.39C Landscape Damage
5-1.39C(1) General
5-1.39C(2) Plant Establishment Period of 3 Years or More
5-1.40\u20135-1.41 RESERVED
5-1.42 REQUESTS FOR INFORMATION
5-1.43 POTENTIAL CLAIMS AND DISPUTE RESOLUTION
5-1.43A General <\/td>\n<\/tr>\n
60<\/td>\n5-1.43B Initial Potential Claim Record
5-1.43C Supplemental Potential Claim Record
5-1.43D Full and Final Potential Claim Record <\/td>\n<\/tr>\n
61<\/td>\n5-1.43E Alternative Dispute Resolution
5-1.43E(1) General
5-1.43E(1)(a) General
5-1.43E(1)(b) Establishment of Procedures <\/td>\n<\/tr>\n
62<\/td>\n5-1.43E(1)(c) Dispute Meetings
5-1.43E(1)(d) Informal Dispute Meetings <\/td>\n<\/tr>\n
63<\/td>\n5-1.43E(1)(e) Recommendations
5-1.43E(1)(f) Completion of Alternative Dispute Resolution
5-1.43E(1)(g) Payment <\/td>\n<\/tr>\n
64<\/td>\n5-1.43E(2) Dispute Resolution Advisor
5-1.43E(2)(a) General
5-1.43E(2)(b) DRA Selection
5-1.43E(2)(c) DRA Replacement
5-1.43E(2)(d) DRA Traditional Dispute Meeting <\/td>\n<\/tr>\n
65<\/td>\n5-1.43E(3) Dispute Resolution Board
5-1.43E(3)(a) General
5-1.43E(3)(b) DRB Member Selection <\/td>\n<\/tr>\n
66<\/td>\n5-1.43E(3)(c) DRB Member Replacement
5-1.43E(3)(d) DRB Progress Meetings
5-1.43E(3)(e) DRB Traditional Dispute Meeting <\/td>\n<\/tr>\n
67<\/td>\n5-1.43F Reserved
5-1.44\u20135-1.45 RESERVED
5-1.46 FINAL INSPECTION AND CONTRACT ACCEPTANCE
5-1.47 GUARANTEE <\/td>\n<\/tr>\n
68<\/td>\n5-1.48\u20135-1.50 RESERVED <\/td>\n<\/tr>\n
69<\/td>\n6 CONTROL OF MATERIALS
6-1.01 GENERAL
6-1.02 DEPARTMENT-FURNISHED MATERIALS
6-1.03 LOCAL MATERIALS
6-1.04 BUY AMERICA
6-1.04A General
6-1.04B Crumb Rubber (Pub Res Code \u00a7 42703(d))
6-1.04C Steel and Iron Materials <\/td>\n<\/tr>\n
70<\/td>\n6-1.05 SPECIFIC BRAND OR TRADE NAME AND SUBSTITUTION
6-2.01 GENERAL
6-2.01A General
6-2.01B Authorized Facility Audit Lists <\/td>\n<\/tr>\n
71<\/td>\n6-2.01C Authorized Material Lists
6-2.01D Authorized Material Source Lists
6-2.01E Material Source Inspection and Testing <\/td>\n<\/tr>\n
72<\/td>\n6-2.01F Test Samples
6-2.01G\u20136-2.01K Reserved
6-2.02 QUALITY CONTROL
6-2.02A General <\/td>\n<\/tr>\n
73<\/td>\n6-2.02B Quality Control Program
6-2.02C Quality Control Manager
6-2.02D Quality Control Plans
6-2.03 DEPARTMENT ACCEPTANCE
6-2.03A General <\/td>\n<\/tr>\n
74<\/td>\n6-2.03B Job Site Inspection and Testing
6-2.03C Certificates of Compliance <\/td>\n<\/tr>\n
75<\/td>\n7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
7-1.01 GENERAL
7-1.02 LAWS
7-1.02A General
7-1.02B US Fair Labor Standards Act
7-1.02C Emissions Reduction
7-1.02D\u20137-1.02H Reserved
7-1.02I Government Code
7-1.02I(1) General
7-1.02I(2) Nondiscrimination <\/td>\n<\/tr>\n
77<\/td>\n7-1.02J Reserved
7-1.02K Labor Code
7-1.02K(1) General
7-1.02K(2) Wages <\/td>\n<\/tr>\n
78<\/td>\n7-1.02K(3) Certified Payroll Records (Labor Code \u00a7 1776) <\/td>\n<\/tr>\n
80<\/td>\n7-1.02K(4) Apprentices
7-1.02K(5) Working Hours <\/td>\n<\/tr>\n
81<\/td>\n7-1.02K(6) Occupational Safety and Health Standards
7-1.02K(6)(a) General
7-1.02K(6)(b) Excavation Safety
7-1.02K(6)(c) Tunnel Safety <\/td>\n<\/tr>\n
82<\/td>\n7-1.02K(6)(d) Confined Space Safety
7-1.02K(6)(e) Scaffolding
7-1.02K(6)(f)\u20137-1.02K(6)(i) Reserved
7-1.02K(6)(j) Lead Safety
7-1.02K(6)(j)(i) General
7-1.02K(6)(j)(ii) Lead Compliance Plan
7-1.02K(6)(j)(iii) Earth Material Containing Lead
7-1.02K(6)(j)(iv\u2013viii) Reserved
7-1.02K(6)(k)\u20137-1.02K(6)(t) Reserved
7-1.02L Public Contract Code
7-1.02L(1) General
7-1.02L(2) Antitrust Claims <\/td>\n<\/tr>\n
83<\/td>\n7-1.02M Public Resources Code
7-1.02M(1) General
7-1.02M(2) Fire Protection
7-1.02M(3) Surface Mining and Reclamation Act
7-1.02M(4)\u20137-1.02M(7) Reserved
7-1.02N Reserved
7-1.02O Vehicle Code
7-1.02P\u20137-1.02Z Reserved
7-1.03 PUBLIC CONVENIENCE <\/td>\n<\/tr>\n
84<\/td>\n7-1.04 PUBLIC SAFETY <\/td>\n<\/tr>\n
86<\/td>\n7-1.05 INDEMNIFICATION
7-1.05A General
7-1.05B Responsibility to Other Entities <\/td>\n<\/tr>\n
87<\/td>\n7-1.06 INSURANCE
7-1.06A General
7-1.06B Casualty Insurance
7-1.06C Workers’ Compensation and Employer’s Liability Insurance
7-1.06D Liability Insurance
7-1.06D(1) General
7-1.06D(2) Liability Limits\/Additional Insureds <\/td>\n<\/tr>\n
88<\/td>\n7-1.06D(3) Contractor’s Insurance Policy is Primary
7-1.06E Automobile Liability Insurance
7-1.06F Policy Forms, Endorsements, and Certificates
7-1.06G Deductibles <\/td>\n<\/tr>\n
89<\/td>\n7-1.06H Enforcement
7-1.06I Self-Insurance
7-1.07 LEGAL ACTIONS AGAINST THE DEPARTMENT
7-1.07A General
7-1.07B Seal Coat Claims <\/td>\n<\/tr>\n
90<\/td>\n7-1.08 PERSONAL LIABILITY
7-1.09\u20137-1.10 RESERVED
7-1.11 FEDERAL LAWS FOR FEDERAL-AID CONTRACTS
7-1.11A General <\/td>\n<\/tr>\n
91<\/td>\n7-1.11B FHWA-1273 <\/td>\n<\/tr>\n
102<\/td>\n7-1.11C Female and Minority Goals <\/td>\n<\/tr>\n
104<\/td>\n7-1.11D Training <\/td>\n<\/tr>\n
107<\/td>\n8 PROSECUTION AND PROGRESS
8-1.01 GENERAL
8-1.02 SCHEDULE
8-1.02A General
8-1.02B Level 1 Critical Path Method Schedule
8-1.02B(1) General
8-1.02B(2) Schedule Format
8-1.02B(3) Updated Schedule <\/td>\n<\/tr>\n
108<\/td>\n8-1.02C Level 2 Critical Path Method Schedule
8-1.02C(1) General
8-1.02C(2) Schedule Format
8-1.02C(3) Computer Software
8-1.02C(3)(a) General <\/td>\n<\/tr>\n
109<\/td>\n8-1.02C(3)(b) Reserved
8-1.02C(4) Data and Network Diagrams
8-1.02C(5) Baseline Schedule
8-1.02C(6) Updated Schedule
8-1.02C(7) Final Updated Schedule <\/td>\n<\/tr>\n
110<\/td>\n8-1.02D Level 3 Critical Path Method Schedule
8-1.02D(1) General
8-1.02D(2) Schedule Format
8-1.02D(3) Computer Software
8-1.02D(4) Data, Network Diagrams, and Reports <\/td>\n<\/tr>\n
111<\/td>\n8-1.02D(5) Preconstruction Scheduling Conference
8-1.02D(6) Baseline Schedule
8-1.02D(7) Updated Schedule <\/td>\n<\/tr>\n
112<\/td>\n8-1.02D(8) Time Impact Analysis
8-1.02D(8)(a) General
8-1.02D(8)(b) Department-Owned Float
8-1.02D(8)(c) Ordered Changes <\/td>\n<\/tr>\n
113<\/td>\n8-1.02D(9) Final Updated Schedule
8-1.02D(10) Payment
8-1.02E\u20138-1.02F Reserved
8-1.03 PRECONSTRUCTION CONFERENCE <\/td>\n<\/tr>\n
114<\/td>\n8-1.04 START OF JOB SITE ACTIVITIES
8-1.04A General
8-1.04B Standard Start
8-1.04C Delayed Start
8-1.04D Early Return-Early Start
8-1.04E Next-Day Start
8-1.04F Flexible Start
8-1.04G Potential Budget Impasse Start
8-1.04H\u20138-1.04J Reserved
8-1.05 TIME <\/td>\n<\/tr>\n
115<\/td>\n8-1.06 SUSPENSIONS
8-1.07 DELAYS
8-1.07A General
8-1.07B Time Adjustments
8-1.07C Payment Adjustments <\/td>\n<\/tr>\n
116<\/td>\n8-1.08\u20138-1.09 RESERVED
8-1.10 LIQUIDATED DAMAGES
8-1.10A General
8-1.10B Failure to Complete Work Parts within Specified Times
8-1.10C Failure to Complete Work Parts by Specified Dates
8-1.10D Reserved
8-1.11\u20138-1.12 RESERVED
8-1.13 CONTRACTOR’S CONTROL TERMINATION <\/td>\n<\/tr>\n
117<\/td>\n8-1.14 CONTRACT TERMINATION
8-1.14A General
8-1.14B Relief from Responsibility for Work
8-1.14C Responsibility for Materials
8-1.14D Contract Acceptance after Termination
8-1.14E Payment Adjustment for Termination <\/td>\n<\/tr>\n
118<\/td>\n8-1.15\u20138-1.16 RESERVED <\/td>\n<\/tr>\n
119<\/td>\n9 PAYMENT
9-1.01 GENERAL
9-1.02 MEASUREMENT
9-1.02A General
9-1.02B Weighing Equipment and Procedures
9-1.02B(1) General
9-1.02B(2) Equipment <\/td>\n<\/tr>\n
120<\/td>\n9-1.02B(3) Procedures
9-1.02C Final Pay Item Quantities
9-1.02D Quantities of Aggregate and Other Roadway Materials
9-1.03 PAYMENT SCOPE <\/td>\n<\/tr>\n
122<\/td>\n9-1.04 FORCE ACCOUNT
9-1.04A General
9-1.04B Labor <\/td>\n<\/tr>\n
123<\/td>\n9-1.04C Materials
9-1.04D Equipment Rental
9-1.04D(1) General <\/td>\n<\/tr>\n
124<\/td>\n9-1.04D(2) Equipment On the Job Site
9-1.04D(3) Equipment Not On the Job Site and Not Required for Original-Contract Work <\/td>\n<\/tr>\n
125<\/td>\n9-1.04D(4) Equipment Not On the Job Site and Required for Original-Contract Work
9-1.04D(5) Non-Owner-Operated Dump Truck Rental
9-1.05 EXTRA WORK PERFORMED BY SPECIALISTS
9-1.06 CHANGED QUANTITY PAYMENT ADJUSTMENTS
9-1.06A General
9-1.06B Increases of More Than 25 Percent
9-1.06C Decreases of More Than 25 Percent <\/td>\n<\/tr>\n
126<\/td>\n9-1.06D Eliminated Items
9-1.07 PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS
9-1.07A General <\/td>\n<\/tr>\n
127<\/td>\n9-1.07B Asphalt Quantities
9-1.07B(1) General
9-1.07B(2) Hot Mix Asphalt
9-1.07B(3) Rubberized Hot Mix Asphalt
9-1.07B(4) Hot Mix Asphalt with Modified Asphalt Binder
9-1.07B(5) Hot Mix Asphalt Containing Reclaimed Asphalt Pavement
9-1.07B(6) Tack Coat <\/td>\n<\/tr>\n
128<\/td>\n9-1.07B(7) Asphaltic Emulsion
9-1.07B(8) Slurry Seal
9-1.07B(9) Modified Asphalt Binder
9-1.07B(10) Other Materials
9-1.07C Payment Adjustments <\/td>\n<\/tr>\n
129<\/td>\n9-1.08\u20139-1.10 RESERVED
9-1.11 TIME-RELATED OVERHEAD
9-1.11A General
9-1.11B Payment Quantity
9-1.11C Payment Inclusions <\/td>\n<\/tr>\n
130<\/td>\n9-1.11D Payment Schedule
9-1.11E Payment Adjustments <\/td>\n<\/tr>\n
131<\/td>\n9-1.12\u20139-1.14 RESERVED
9-1.15 WORK-CHARACTER CHANGES
9-1.16 PROGRESS PAYMENTS
9-1.16A General
9-1.16B Schedule of Values
9-1.16C Materials On Hand
9-1.16D Mobilization
9-1.16D(1) General <\/td>\n<\/tr>\n
132<\/td>\n9-1.16D(2) Mobilization for Projects Except for Those Over Water Requiring Marine Access
9-1.16D(3) Mobilization for Projects Over Water Requiring Marine Access
9-1.16E Withholds
9-1.16E(1) General
9-1.16E(2) Progress Withholds
9-1.16E(3) Performance Failure Withholds <\/td>\n<\/tr>\n
133<\/td>\n9-1.16E(4) Stop Notice Withholds
9-1.16E(5) Penalty Withholds
9-1.16E(6)\u20139-1.16E(10) Reserved
9-1.16F Retentions
9-1.16G\u20139-1.16M Reserved
9-1.17 PAYMENT AFTER CONTRACT ACCEPTANCE
9-1.17A General
9-1.17B Payment Before Final Estimate
9-1.17C Proposed Final Estimate <\/td>\n<\/tr>\n
134<\/td>\n9-1.17D Final Payment and Claims
9-1.17D(1) General
9-1.17D(2) Claim Statement
9-1.17D(2)(a) General
9-1.17D(2)(b) Overhead Claims <\/td>\n<\/tr>\n
135<\/td>\n9-1.17D(2)(c) Declaration
9-1.17D(2)(d) Waiver <\/td>\n<\/tr>\n
136<\/td>\n9-1.17D(3) Final Determination of Claims
9-1.18\u20139-1.20 RESERVED
9-1.21 CLERICAL ERRORS
9-1.22 ARBITRATION <\/td>\n<\/tr>\n
137<\/td>\nDIVISION II GENERAL CONSTRUCTION
10 GENERAL
10-1.01 GENERAL
10-1.02 WORK SEQUENCING
10-1.02A General
10-1.02B Traffic Elements
10-1.02C Landscaping and Irrigation Facilities
10-1.02C(1) General
10-1.02C(2) Irrigation Facilities
10-1.02C(3) Landscaping
10-1.02D Traffic Stripes, Pavement Markings, and Pavement Markers
10-1.02E Excavation
10-1.03 TIME CONSTRAINTS <\/td>\n<\/tr>\n
138<\/td>\n10-1.04 TRAINING AND MEETINGS
10-1.05\u201310-1.10 RESERVED <\/td>\n<\/tr>\n
139<\/td>\n11 WELDING
11-1.01 GENERAL
11-1.02 DEFINITIONS
11-1.03 QUALITY CONTROL INSPECTOR
11-1.04 PERSONNEL QUALIFICATIONS AND CERTIFICATIONS <\/td>\n<\/tr>\n
140<\/td>\n11-1.05 WELD JOINT DETAILS
11-1.06 NONDESTRUCTIVE TESTING <\/td>\n<\/tr>\n
141<\/td>\n11-2.01 GENERAL
11-2.02 WELDING QUALITY CONTROL MANAGER
11-2.03 SUBMITTALS
11-2.03A General
11-2.03B Welding Quality Control Plan
11-2.03C Welding Report <\/td>\n<\/tr>\n
142<\/td>\n11-2.03D Certificates of Compliance
11-2.04 PERSONNEL QUALIFICATIONS AND CERTIFICATIONS <\/td>\n<\/tr>\n
143<\/td>\n11-2.05 WELDING INSPECTION
11-2.06 WELDING PROCEDURES QUALIFICATION
11-2.07 REPAIR WORK <\/td>\n<\/tr>\n
144<\/td>\n11-3.01 GENERAL
11-3.02 WELDING INSPECTION
11-3.03 SUBMITTALS <\/td>\n<\/tr>\n
145<\/td>\n12 TEMPORARY TRAFFIC CONTROL
12-1.01 GENERAL
12-1.02 MATERIALS
12-1.03 CONSTRUCTION
12-1.04 PAYMENT
12-3.01 GENERAL
12-3.01A General
12-3.01A(1) Summary
12-3.01A(2) Definitions <\/td>\n<\/tr>\n
146<\/td>\n12-3.01A(3) Submittals
12-3.01A(4) Quality Assurance
12-3.01B Materials <\/td>\n<\/tr>\n
147<\/td>\n12-3.01C Construction
12-3.01D Payment
12-3.02 TRAFFIC CONES
12-3.02A General
12-3.02B Materials
12-3.02C Construction
12-3.02D Payment <\/td>\n<\/tr>\n
148<\/td>\n12-3.03 PLASTIC TRAFFIC DRUMS
12-3.03A General
12-3.03A(1) Summary
12-3.03A(2) Definitions
12-3.03A(3) Submittals
12-3.03A(4) Quality Assurance
12-3.03B Materials
12-3.03C Construction
12-3.03D Payment
12-3.04 PORTABLE DELINEATORS
12-3.04A General
12-3.04B Materials <\/td>\n<\/tr>\n
149<\/td>\n12-3.04C Construction
12-3.04D Payment
12-3.05 CHANNELIZERS
12-3.05A General
12-3.05B Materials
12-3.05C Construction
12-3.05D Payment
12-3.06\u201312-3.09 RESERVED
12-3.10 BARRICADES
12-3.10A General
12-3.10B Materials
12-3.10C Construction <\/td>\n<\/tr>\n
150<\/td>\n12-3.10D Payment
12-3.11 CONSTRUCTION AREA SIGNS
12-3.11A General
12-3.11A(1) Summary
12-3.11A(2) Definitions
12-3.11A(3) Submittals
12-3.11A(4) Quality Assurance
12-3.11B Materials
12-3.11B(1) General
12-3.11B(2) Stationary-Mounted Signs
12-3.11B(3) Portable Signs <\/td>\n<\/tr>\n
151<\/td>\n12-3.11B(4) Temporary Object Markers
12-3.11B(5) General Information Signs
12-3.11C Construction
12-3.11C(1) General
12-3.11C(2) Stationary-Mounted Signs <\/td>\n<\/tr>\n
152<\/td>\n12-3.11C(3) General Information Signs
12-3.11D Payment
12-3.12 TELESCOPING FLAG TREES
12-3.12A General
12-3.12B Materials
12-3.12C Construction
12-3.12D Payment
12-3.13\u201312-3.19 RESERVED
12-3.20 TYPE K TEMPORARY RAILING
12-3.20A General
12-3.20A(1) Summary
12-3.20A(2) Definitions
12-3.20A(3) Submittals
12-3.20A(4) Quality Assurance <\/td>\n<\/tr>\n
153<\/td>\n12-3.20B Materials
12-3.20B(1) General
12-3.20B(2) Type K Temporary Terminal Section
12-3.20C Construction
12-3.20C(1) General <\/td>\n<\/tr>\n
154<\/td>\n12-3.20C(2) Type K Temporary Terminal Section
12-3.20D Payment
12-3.21 TEMPORARY TRAFFIC SCREENS
12-3.21A General
12-3.21B Materials
12-3.21C Construction
12-3.21D Payment
12-3.22 TEMPORARY CRASH CUSHION MODULES
12-3.22A General
12-3.22B Materials
12-3.22C Construction <\/td>\n<\/tr>\n
155<\/td>\n12-3.22D Payment
12-3.23 IMPACT ATTENUATOR VEHICLES
12-3.23A General
12-3.23A(1) Summary
12-3.23A(2) Definitions
12-3.23A(3) Submittals
12-3.23A(4) Quality Assurance
12-3.23B Materials <\/td>\n<\/tr>\n
156<\/td>\n12-3.23C Construction
12-3.23D Payment
12-3.24\u201312-3.29 RESERVED
12-3.30 FLASHING ARROW SIGNS
12-3.30A General
12-3.30B Materials <\/td>\n<\/tr>\n
157<\/td>\n12-3.30C Construction
12-3.30D Payment
12-3.31 PORTABLE FLASHING BEACONS
12-3.31A General <\/td>\n<\/tr>\n
158<\/td>\n12-3.31B Materials
12-3.31C Construction
12-3.31D Payment
12-3.32 PORTABLE CHANGEABLE MESSAGE SIGNS
12-3.32A General
12-3.32A(1) Summary
12-3.32A(2) Definitions
12-3.32A(3) Submittals <\/td>\n<\/tr>\n
159<\/td>\n12-3.32A(4) Quality Assurance
12-3.32B Materials
12-3.32C Construction <\/td>\n<\/tr>\n
160<\/td>\n12-3.32D Payment
12-3.33 TEMPORARY SIGNAL SYSTEMS
12-3.33A General
12-3.33B Materials
12-3.33B(1) General
12-3.33B(2) Generators
12-3.33B(3) Automatic Transfer Switches <\/td>\n<\/tr>\n
161<\/td>\n12-3.33C Construction
12-3.33C(1) General
12-3.33C(2) Commercial Power
12-3.33D Payment
12-3.34 TEMPORARY FLASHING BEACON SYSTEMS
12-3.34A General
12-3.34B Materials
12-3.34B(1) General
12-3.34B(2) Generators
12-3.34B(3) Sign Panels <\/td>\n<\/tr>\n
162<\/td>\n12-3.34C Construction
12-3.34D Payment
12-3.35 AUTOMATED WORK ZONE INFORMATION SYSTEMS
12-3.35A General
12-3.35A(1) Summary
12-3.35A(2) Definitions
12-3.35A(3) Submittals
12-3.35A(4) Quality Assurance
12-3.35B Materials
12-3.35B(1) General
12-3.35B(2) General System Function Requirements <\/td>\n<\/tr>\n
163<\/td>\n12-3.35B(3) Motorist Information Message Requirements
12-3.35B(4) System Communication Requirements
12-3.35B(5) Traffic Data Acquisition Requirements
12-3.35B(6) User Interface <\/td>\n<\/tr>\n
164<\/td>\n12-3.35C Construction
12-3.35D Payment
12-3.36 PORTABLE TRANSVERSE RUMBLE STRIPS
12-3.37\u201312-3.40 RESERVED
12-4.01 GENERAL
12-4.01A General
12-4.01B Materials
12-4.01C Construction
12-4.01D Payment
12-4.02 TRAFFIC CONTROL SYSTEMS
12-4.02A General
12-4.02A(1) Summary
12-4.02A(2) Definitions <\/td>\n<\/tr>\n
165<\/td>\n12-4.02A(3) Submittals
12-4.02A(3)(a) General
12-4.02A(3)(b) Closure Schedules
12-4.02A(3)(c) Contingency Plans for Closures
12-4.02A(4) Quality Assurance <\/td>\n<\/tr>\n
166<\/td>\n12-4.02B Materials
12-4.02C Construction
12-4.02C(1) General
12-4.02C(2) Lane Closure System Training
12-4.02C(3) Closure Requirements and Charts
12-4.02C(3)(a) General
12-4.02C(3)(b) Complete Freeway or Expressway Closure Requirements <\/td>\n<\/tr>\n
167<\/td>\n12-4.02C(3)(c) HOV, Express, and Bus Lane Closure Requirements
12-4.02C(3)(d) City Street Closure Requirements
12-4.02C(3)(e) Closure Restrictions for Special Events and Venues
12-4.02C(3)(f) Closure Restrictions for Designated Holidays and Special Days
12-4.02C(3)(g) Freeway or Expressway Lane Requirement Charts
12-4.02C(3)(h) Complete Freeway or Expressway Closure Hour Charts
12-4.02C(3)(i) Complete Connector Closure Hour Charts and Connector Lane Requirement Charts
12-4.02C(3)(j) Complete Ramp Closure Hour Charts and Ramp Lane Requirement Charts
12-4.02C(3)(k) Conventional Highway Lane Requirement Charts
12-4.02C(3)(l) Complete Conventional Highway Closure Hour Charts
12-4.02C(3)(m) City Street Closure Hour Charts and City Street Lane Requirement Charts
12-4.02C(3)(n) Concrete Slab and Approach Slab Replacement Closure Hours Table
12-4.02C(3)(o)\u201312-4.02C(3)(s) Reserved
12-4.02C(4)\u201312.4.02C(6) Reserved
12-4.02C(7) Traffic Control System Requirements
12-4.02C(7)(a) General
12-4.02C(7)(b) Stationary Closures <\/td>\n<\/tr>\n
168<\/td>\n12-4.02C(7)(c) Moving Closures
12-4.02C(8) Traffic Control System Signs
12-4.02C(8)(a) General
12-4.02C(8)(b) Connector and Ramp Closure Signs
12-4.02C(9)\u201312-4.02C(12) Reserved
12-4.02D Payment
12-4.03 FALSEWORK OPENINGS
12-4.04 PEDESTRIAN FACILITIES
12-4.04A General
12-4.04B Materials
12-4.04C Construction
12-4.04D Payment <\/td>\n<\/tr>\n
169<\/td>\n12-4.05 BRIDGE CLEANING AND PAINTING ACTIVITIES
12-4.05A General
12-4.05B Materials
12-4.05C Construction
12-4.05D Payment
12-4.06 TOLL BRIDGES
12-4.07\u201312-4.10 RESERVED
12-6.01 GENERAL
12-6.02 MATERIALS
12-6.02A General <\/td>\n<\/tr>\n
170<\/td>\n12-6.02B Temporary Pavement Markers
12-6.02C Channelizers
12-6.03 CONSTRUCTION
12-6.03A General
12-6.03B Temporary Lane Line and Centerline Delineation <\/td>\n<\/tr>\n
171<\/td>\n12-6.03C Temporary Edge Line Delineation
12-6.03D Temporary Traffic Stripe, Pavement Marking, and Pavement Markers
12-6.03D(1) General
12-6.03D(2) Temporary Traffic Stripe Tape
12-6.03D(3) Temporary Traffic Stripe Paint
12-6.03D(4) Temporary Pavement Marking Tape
12-6.03D(5) Temporary Pavement Marking Paint <\/td>\n<\/tr>\n
172<\/td>\n12-6.03D(6) Temporary Pavement Markers
12-6.04 PAYMENT
12-7.01 GENERAL
12-7.02 MATERIALS
12-7.03 CONSTRUCTION
12-7.04 PAYMENT <\/td>\n<\/tr>\n
173<\/td>\n13 WATER POLLUTION CONTROL
13-1.01 GENERAL
13-1.01A Summary
13-1.01B Definitions
13-1.01C Submittals
13-1.01C(1) General
13-1.01C(2) Training Records <\/td>\n<\/tr>\n
174<\/td>\n13-1.01C(3) Contractor-Support Facilities
13-1.01C(4) Water Quality Monitoring
13-1.01C(4)(a) General
13-1.01C(4)(b) Water Quality Monitor
13-1.01C(4)(c) Water Quality Monitoring Reports
13-1.01C(4)(d) Water Quality Annual Reports <\/td>\n<\/tr>\n
175<\/td>\n13-1.01C(5)\u201313-1.01C(8) Reserved
13-1.01D Quality Assurance
13-1.01D(1) General
13-1.01D(2) Regulatory Requirements
13-1.01D(3) Training <\/td>\n<\/tr>\n
176<\/td>\n13-1.01D(4) Water Pollution Control Manager
13-1.01D(4)(a) General
13-1.01D(4)(b) Qualifications
13-1.01D(4)(c) Responsibilities <\/td>\n<\/tr>\n
177<\/td>\n13-1.01D(5) Quality Control
13-1.01D(5)(a) General
13-1.01D(5)(b) Water Quality Sampling and Analysis <\/td>\n<\/tr>\n
178<\/td>\n13-1.01D(5)(c) Reserved
13-1.03D(6)\u201313-1.01D(8) Reserved
13-1.02 MATERIALS
13-1.03 CONSTRUCTION
13-1.03A General
13-1.03B Contractor-Support Facilities <\/td>\n<\/tr>\n
179<\/td>\n13-1.03C Inspections
13-1.03D Deficiencies
13-1.03E\u201313-1.03H Reserved
13-1.04 PAYMENT
13-2.01 GENERAL
13-2.01A Summary <\/td>\n<\/tr>\n
180<\/td>\n13-2.01B Definitions
13-2.01C Submittals
13-2.01D Quality Assurance
13-2.02 MATERIALS <\/td>\n<\/tr>\n
181<\/td>\n13-2.03 CONSTRUCTION
13-2.04 PAYMENT
13-3.01 GENERAL
13-3.01A Summary
13-3.01B Definitions
13-3.01C Submittals
13-3.01C(1) General <\/td>\n<\/tr>\n
182<\/td>\n13-3.01C(2) Stormwater Pollution Prevention Plan
13-3.01C(2)(a) General <\/td>\n<\/tr>\n
183<\/td>\n13-3.01C(2)(b) Construction Site Monitoring Program
13-3.01C(2)(b)(i) General
13-3.01C(2)(b)(ii) Site Inspection Reports
13-3.01C(2)(b)(iii) Visual Monitoring Reports <\/td>\n<\/tr>\n
184<\/td>\n13-3.01C(2)(b)(iv) Sampling and Analysis Plan <\/td>\n<\/tr>\n
185<\/td>\n13-3.01C(2)(b)(v) Sampling and Analysis Plan for Nonvisible Pollutants
13-3.01C(2)(b)(vi) Sampling and Analysis Reports
13-3.01C(2)(b)(vi)(A) General <\/td>\n<\/tr>\n
186<\/td>\n13-3.01C(2)(b)(vi)(B) Numeric Action Level Exceedance Reports
13-3.01C(2)(b)(vi)(C) Receiving-Water Monitoring Trigger Reports
13-3.01C(2)(b)(vi)(D)\u201313-3.01C(2)(b)(vi)(F) Reserved
13-3.01C(2)(b)(vii)\u201313-3.01C(2)(b)(x) Reserved
13-3.01C(3) Rain Event Action Plan <\/td>\n<\/tr>\n
187<\/td>\n13-3.01C(4) Stormwater Annual Report
13-3.01C(5) Annual Certification
13-3.01D Quality Assurance
13-3.01D(1) General
13-3.01D(2) Regulatory Requirements <\/td>\n<\/tr>\n
188<\/td>\n13-3.01D(3) Water Quality
13-3.01D(3)(a) General
13-3.01D(3)(b) Numeric Action Levels
13-3.01D(3)(c) Receiving-Water Monitoring Triggers
13-3.01D(3)(d) Numeric Effluent Limitations <\/td>\n<\/tr>\n
189<\/td>\n13-3.01D(4) Water Quality Control
13-3.01D(5)\u201313-3.01D(6) Reserved
13-3.02 MATERIALS
13-3.03 CONSTRUCTION
13-3.04 PAYMENT <\/td>\n<\/tr>\n
190<\/td>\n13-4.01 GENERAL
13-4.01A Summary
13-4.01B Definitions
13-4.01C Submittals
13-4.01D Quality Assurance
13-4.02 MATERIALS <\/td>\n<\/tr>\n
191<\/td>\n13-4.03 CONSTRUCTION
13-4.03A General
13-4.03B Spill Prevention and Control
13-4.03B(1) General
13-4.03B(2) Minor Spills
13-4.03B(3) Semisignificant Spills
13-4.03B(4) Significant or Hazardous Spills <\/td>\n<\/tr>\n
192<\/td>\n13-4.03B(5)\u201313-4.03B(6) Reserved
13-4.03C Material Management
13-4.03C(1) General
13-4.03C(2) Material Storage
13-4.03C(3) Stockpile Management <\/td>\n<\/tr>\n
193<\/td>\n13-4.03C(4)\u201313-4.03C(6) Reserved
13-4.03D Waste Management
13-4.03D(1) General
13-4.03D(2) Paint Waste
13-4.03D(3) Concrete Waste
13-4.03D(4) Sanitary and Septic Waste
13-4.03D(5) Liquid Waste <\/td>\n<\/tr>\n
194<\/td>\n13-4.03D(6)\u201313-4.03D(8) Reserved
13-4.03E Nonstormwater Management
13-4.03E(1) General
13-4.03E(2) Illicit Connection and Illegal Discharge Detection and Reporting
13-4.03E(3) Vehicle and Equipment Cleaning
13-4.03E(4) Vehicle and Equipment Fueling and Maintenance <\/td>\n<\/tr>\n
195<\/td>\n13-4.03E(5) Material and Equipment Used Over Water
13-4.03E(6) Structure Removal Over or Adjacent to Water
13-4.03E(7) Paving, Sealing, Saw Cutting, Grooving, and Grinding Activities <\/td>\n<\/tr>\n
196<\/td>\n13-4.03E(8) Thermoplastic Striping and Pavement Markers
13-4.03E(9) Pile Driving
13-4.03E(10) Concrete Curing
13-4.03E(11) Concrete Finishing
13-4.03E(12)\u201313-4.03E(15) Reserved
13-4.03F Sweeping <\/td>\n<\/tr>\n
197<\/td>\n13-4.03G Dewatering
13-4.03H\u201313-4.03J Reserved
13-4.04 PAYMENT
13-5.01 GENERAL
13-5.02 MATERIALS
13-5.02A General
13-5.02B Erosion Control Blankets
13-5.02C Mulch
13-5.02D Cementitious Binder <\/td>\n<\/tr>\n
198<\/td>\n13-5.02E Soil Binder
13-5.02F Temporary Covers
13-5.02G Gravel-Filled Bags
13-5.02H\u201313-5.02J Reserved
13-5.03 CONSTRUCTION
13-5.03A General
13-5.03B Temporary Erosion Control Blankets
13-5.03C Temporary Mulch
13-5.03D Temporary Hydraulic Mulch <\/td>\n<\/tr>\n
199<\/td>\n13-5.03E Temporary Bonded Fiber Matrix Hydraulic Mulch
13-5.03F Reserved
13-5.03G Temporary Cementitious Binder Hydraulic Mulch
13-5.03H Temporary Tacked Straw
13-5.03I Temporary Hydroseed
13-5.03J Temporary Soil Binder
13-5.03K Temporary Covers <\/td>\n<\/tr>\n
200<\/td>\n13-5.03L\u201313-5.03N Reserved
13-5.04 PAYMENT
13-6.01 GENERAL
13-6.02 MATERIALS
13-6.02A General
13-6.02B Rigid Plastic Barriers <\/td>\n<\/tr>\n
201<\/td>\n13-6.02C Sediment Filter Bags
13-6.02D\u201313-6.02F Reserved
13-6.03 CONSTRUCTION
13-6.03A General <\/td>\n<\/tr>\n
202<\/td>\n13-6.03B Temporary Check Dams
13-6.03C Temporary Drainage Inlet Protection <\/td>\n<\/tr>\n
203<\/td>\n13-6.03D Reserved
13-6.03E Temporary Fiber Rolls
13-6.03F Temporary Gravel Bag Berms
13-6.03F Rigid Plastic Barriers
13-6.03G\u201313-6.03J Reserved
13-6.04 PAYMENT
13-7.01 GENERAL
13-7.01A General
13-7.01B Materials
13-7.01C Construction
13-7.01D Payment
13-7.02 STREET SWEEPING
13-7.02A General
13-7.02A(1) Summary
13-7.02A(2) Definitions
13-7.02A(3) Submittals <\/td>\n<\/tr>\n
204<\/td>\n13-7.02A(4) Quality Assurance
13-7.02B Materials
13-7.02C Construction
13-7.02D Payment
13-7.03 TEMPORARY CONSTRUCTION ROADWAYS AND ENTRANCES
13-7.03A General
13-7.03A(1) Summary
13-7.03A(2) Definitions
13-7.03A(3) Submittals
13-7.03A(4) Quality Assurance
13-7.03B Materials
13-7.03B(1) General
13-7.03B(2) Rock <\/td>\n<\/tr>\n
205<\/td>\n13-7.03B(3) Corrugated Steel Panels
13-7.03C Construction
13-7.03D Payment
13-8.01 GENERAL
13-8.01A Summary <\/td>\n<\/tr>\n
206<\/td>\n13-8.01B Definitions
13-8.01C Submittals
13-8.01C(1) General
13-8.01C(2) Active Treatment System Plan <\/td>\n<\/tr>\n
207<\/td>\n13-8.01C(3) Inspection Reports
13-8.01C(4) Notice of Discharge Reports
13-8.01C(5) Numeric Effluent Limitation Violation Reports
13-8.01C(6)\u201313-8.01C(8) Reserved
13-8.01D Quality Assurance
13-8.01D(1) General
13-8.01D(2) Regulatory Requirements <\/td>\n<\/tr>\n
208<\/td>\n13-8.01D(3) Training
13-8.01D(4) Equipment Calibration
13-8.01D(5) Quality Control <\/td>\n<\/tr>\n
209<\/td>\n13-8.02 MATERIALS
13-8.02A General <\/td>\n<\/tr>\n
210<\/td>\n13-8.02B Treatment System
13-8.02C Collection and Conveyance System
13-8.02D Monitoring Equipment
13-8.03 CONSTRUCTION
13-8.03A General
13-8.03B Monitoring
13-8.03B(1) General <\/td>\n<\/tr>\n
211<\/td>\n13-8.03B(2) Corrective Measures
13-8.04 PAYMENT
13-9.01 GENERAL
13-9.01A Summary
13-9.01B Definitions
13-9.01C Submittals
13-9.01D Quality Assurance
13-9.02 MATERIALS
13-9.02A General
13-9.02B Temporary Concrete Washout Facilities <\/td>\n<\/tr>\n
212<\/td>\n13-9.02C Portable Temporary Concrete Washouts
13-9.02D Temporary Concrete Washout Bins
13-9.02E\u201313-9.02G Reserved
13-9.03 CONSTRUCTION
13-9.04 PAYMENT
13-10.01 GENERAL
13-10.01A Summary <\/td>\n<\/tr>\n
213<\/td>\n13-10.01B Definitions
13-10.01C Submittals
13-10.01D Quality Assurance
13-10.02 MATERIALS
13-10.02A General
13-10.02B Fiber Rolls
13-10.02C Posts
13-10.02D High-Visibility Fabric
13-10.02E Wire Mesh
13-10.02F Wire
13-10.02G Anchors
13-10.02H Straw Bales <\/td>\n<\/tr>\n
214<\/td>\n13-10.02I Foam Barriers
13-10.02J Gravel-filled Bags
13-10.02K\u201313-10.02M Reserved
13-10.03 CONSTRUCTION
13-10.03A General <\/td>\n<\/tr>\n
215<\/td>\n13-10.03B Temporary Fiber Rolls
13-10.03C Temporary Gravel Bag Berms
13-10.03D Temporary Large Sediment Barriers
13-10.03E Temporary Reinforced Silt Fences
13-10.03F Temporary Silt Fences <\/td>\n<\/tr>\n
216<\/td>\n13-10.03G Temporary Straw Bale Barriers
13-10.03H Temporary Foam Barriers
13-10.03I Temporary Earthen Berms
13-10.03J\u201313-10.03L Reserved
13-10.04 PAYMENT <\/td>\n<\/tr>\n
217<\/td>\n14 ENVIRONMENTAL STEWARDSHIP
14-1.01 GENERAL
14-1.02 ENVIRONMENTALLY SENSITIVE AREA
14-1.03\u201314.1.06 RESERVED
14-2.01 GENERAL
14-2.02 DEFINITIONS
14-2.03 ARCHAEOLOGICAL RESOURCES
14-2.03A General
14-2.03B Archaeological Monitoring Area <\/td>\n<\/tr>\n
218<\/td>\n14-2.04 HISTORIC STRUCTURES
14-2.05\u201314-2.10 RESERVED
14-6.01 GENERAL
14-6.02 DEFINITIONS <\/td>\n<\/tr>\n
219<\/td>\n14-6.03 SPECIES PROTECTION
14-6.03A General
14-6.03B Bird Protection
14-6.03C Fish Protection <\/td>\n<\/tr>\n
220<\/td>\n14-6.03D Contractor-Supplied Biologist
14-6.03D(1) General
14-6.03D(2) Natural Resource Protection Plan <\/td>\n<\/tr>\n
221<\/td>\n14-6.03D(3) Biological Resource Information Program
14-6.04 WETLAND PROTECTION
14-6.05\u201314-6.10 RESERVED
14-7.01 GENERAL
14-7.02 DEFINITIONS
14-7.03 DISCOVERY OF UNANTICIPATED PALEONTOLOGICAL RESOURCES
14-7.04 PALEONTOLOGICAL RESOURCES MITIGATION
14-7.05\u201314.7.08 RESERVED
14-8.01 GENERAL
14-8.02 NOISE CONTROL
14-8.03\u201314.8.06 RESERVED
14-9.01 GENERAL <\/td>\n<\/tr>\n
222<\/td>\n14-9.02 AIR POLLUTION CONTROL
14-9.03 AIR MONITORING
14-9.04\u201314-9.10 RESERVED
14-10.01 GENERAL
14-10.02 SOLID WASTE DISPOSAL AND RECYCLING REPORT <\/td>\n<\/tr>\n
223<\/td>\n14-10.03\u201314-10.05 RESERVED
14-11.01 GENERAL
14-11.02 DISCOVERY OF UNANTICIPATED ASBESTOS AND HAZARDOUS SUBSTANCES
14-11.03 HAZARDOUS WASTE MANAGEMENT <\/td>\n<\/tr>\n
224<\/td>\n14-11.04 DUST CONTROL
14-11.05 STOCKPILING
14-11.05A General
14-11.05B Liner
14-11.06 CONTRACTOR-GENERATED HAZARDOUS WASTE
14-11.06A General <\/td>\n<\/tr>\n
225<\/td>\n14-11.06B Contractor-Generated Contaminated Soil
14-11.07 DEPARTMENT-GENERATED HAZARDOUS WASTE
14-11.07A General
14-11.07B Storage of Department-Generated Hazardous Waste
14-11.07C Transport and Disposal of Department-Generated Hazardous Waste <\/td>\n<\/tr>\n
226<\/td>\n14-11.08 MATERIAL CONTAINING HAZARDOUS WASTE CONCENTRATIONS OF AERIALLY DEPOSITED LEAD
14-11.08A General
14-11.08B Definitions <\/td>\n<\/tr>\n
227<\/td>\n14-11.08C Site Conditions
14-11.08D Submittals
14-11.08D(1) General
14-11.08D(2) Excavation and Transportation Plan
14-11.08D(3) Burial Location Report
14-11.08D(4) Bill of Lading
14-11.08E Dust Control
14-11.08F Air Monitoring
14-11.08G Material Management
14-11.08H Surveying Type Y-1 or Y-2 Material Burial Locations <\/td>\n<\/tr>\n
228<\/td>\n14-11.08I Material Transportation
14-11.08J Disposal
14-11.09 MINIMAL DISTURBANCE OF MATERIAL CONTAINING HAZARDOUS WASTE CONCENTRATIONS OF AERIALLY DEPOSITED LEAD
14-11.09A General
14-11.09B Material Management
14-11.10 NATURALLY OCCURRING ASBESTOS
14-11.11 DEPARTMENT-GENERATED CONTAMINATED SOIL <\/td>\n<\/tr>\n
229<\/td>\n14-11.12 REMOVAL OF YELLOW TRAFFIC STRIPE AND PAVEMENT MARKING WITH HAZARDOUS WASTE RESIDUE
14-11.12A General
14-11.12B Submittals
14-11.12B(1) General
14-11.12B(2) Work Plan
14-11.12B(3) Analytical Test Results <\/td>\n<\/tr>\n
230<\/td>\n14-11.12B(4) Disposal Documentation
14-11.12C Removal
14-11.12D Sampling and Testing of Residue
14-11.12E Transport and Disposal of Residue
14-11.13 DISTURBANCE OF EXISTING PAINT SYSTEMS ON BRIDGES
14-11.13A General <\/td>\n<\/tr>\n
231<\/td>\n14-11.13B Submittals
14-11.13B(1) General
14-11.13B(2) Debris Containment and Collection Plan
14-11.13B(3) Air Monitoring Reports
14-11.13B(4) Soil Sampling Results for Debris Containment Verification
14-11.13B(5) Waste Characterization Test Results
14-11.13B(6) Disposal Documentation <\/td>\n<\/tr>\n
232<\/td>\n14-11.13C Safety and Health Protection Measures
14-11.13D Work Area Monitoring
14-11.13E Debris Storage
14-11.13F Debris Waste Characterization
14-11.13G Debris Transport and Disposal
14-11.13G(1) General
14-11.13G(2) Hazardous Waste Debris
14-11.13G(3) Nonhazardous Waste Debris <\/td>\n<\/tr>\n
233<\/td>\n14-11.14 TREATED WOOD WASTE
14-11.14A General
14-11.14B Submittals
14-11.14C Training
14-11.14D Storage of Treated Wood Waste <\/td>\n<\/tr>\n
234<\/td>\n14-11.14E Transport and Disposal of Treated Wood Waste
14-11.15 DISPOSAL OF ELECTRICAL EQUIPMENT REQUIRING SPECIAL HANDLING
14-11.16\u201314-11.20 RESERVED
14-12.01 GENERAL
14-12.02 STATE PARKS
14-12.03 STATE RECLAMATION BOARD <\/td>\n<\/tr>\n
235<\/td>\n14-12.04\u201314.12.08 RESERVED <\/td>\n<\/tr>\n
237<\/td>\n15 EXISTING FACILITIES
15-1.01 GENERAL
15-1.02 MATERIALS
15-1.03 CONSTRUCTION
15-1.03A General
15-1.03B Removing Concrete <\/td>\n<\/tr>\n
238<\/td>\n15-1.03C Salvaging Facilities
15-1.03D\u201315-1.03K Reserved
15-1.04 PAYMENT <\/td>\n<\/tr>\n
239<\/td>\n16 TEMPORARY FACILITIES
16-1.01 GENERAL
16-1.02 MATERIALS
16-1.03 CONSTRUCTION
16-1.04 PAYMENT
16-2.01 GENERAL
16-2.01A General
16-2.01B Materials
16-2.01C Construction
16-2.01D Payment
16-2.02 TEMPORARY PEDESTRIAN FACILITIES
16-2.02A General
16-2.02A(1) Summary
16-2.02A(2) Definitions
16-2.02A(3) Submittals <\/td>\n<\/tr>\n
240<\/td>\n16-2.02A(4) Quality Assurance
16-2.02B Materials
16-2.02B(1) General
16-2.02B(2) Design Requirements
16-2.02C Construction
16-2.02D Payment
16-2.03 HIGH-VISIBILITY FENCES
16-2.03A General
16-2.03A(1) Summary
16-2.03A(2) Definitions
16-2.03A(3) Submittals
16-2.03A(4) Quality Assurance
16-2.03B Materials <\/td>\n<\/tr>\n
241<\/td>\n16-2.03C Construction
16-2.03D Payment
16-2.04 TEMPORARY CONSTRUCTION MATS
16-2.04A General
16-2.04A(1) General
16-2.04A(1)(a) Summary
16-2.04A(1)(b) Definitions
16-2.04A(1)(c) Submittals
16-2.04A(1)(d) Quality Assurance
16-2.04A(2) Materials <\/td>\n<\/tr>\n
242<\/td>\n16-2.04A(3) Construction
16-2.04A(4) Payment
16-2.04B HDPE Mats
16-2.04B(1) General
16-2.04B(2) Materials
16-2.04B(3) Construction
16-2.04B(4) Payment
16-2.04C\u201316-2.04G Reserved
16-2.05 JOB SITE WATER CONTROL
16-2.05A General
16-2.05A(1) General
16-2.05A(2) Materials
16-2.05A(3) Construction
16-2.05A(4) Payment
16-2.05B Water-Filled Cofferdam
16-2.05C\u201316-2.05G Reserved <\/td>\n<\/tr>\n
243<\/td>\nDIVISION III EARTHWORK AND LANDSCAPE
17 GENERAL
17-1.01 GENERAL
17-1.02 MATERIALS
17-1.03 CONSTRUCTION
17-1.04 PAYMENT
17-2.01 GENERAL
17-2.02 MATERIALS
17-2.03 CONSTRUCTION
17-2.03A General
17-2.03B Clearing <\/td>\n<\/tr>\n
244<\/td>\n17-2.03C Grubbing
17-2.03D Disposal of Materials
17-2.04 PAYMENT <\/td>\n<\/tr>\n
245<\/td>\n18 DUST PALLIATIVES
18-1.01 GENERAL
18-1.01A Summary
18-1.01B Definitions
18-1.01C Submittals
18-1.01D Quality Assurance <\/td>\n<\/tr>\n
246<\/td>\n18-1.02 MATERIALS
18-1.02A General
18-1.02B Dust Suppressants
18-1.02B(1) General <\/td>\n<\/tr>\n
247<\/td>\n18-1.02B(2) Petroleum-Based Organic Products
18-1.02B(3) Nonpetroleum-Based Organic Products <\/td>\n<\/tr>\n
248<\/td>\n18-1.02B(4) Hygroscopic Products <\/td>\n<\/tr>\n
249<\/td>\n18-1.02B(5) Synthetic Polymer Emulsions
18-1.02C Dust Control Binders
18-1.03 CONSTRUCTION
18-1.03A General
18-1.03B Equipment <\/td>\n<\/tr>\n
250<\/td>\n18-1.03C Mixing and Application Rates <\/td>\n<\/tr>\n
251<\/td>\n18-1.04 PAYMENT <\/td>\n<\/tr>\n
253<\/td>\n19 EARTHWORK
19-1.01 GENERAL
19-1.01A Summary
19-1.01B Definitions
19-1.01C Submittals
19-1.01D Quality Assurance
19-1.02 MATERIALS
19-1.03 CONSTRUCTION
19-1.03A General
19-1.03B Unsuitable Material
19-1.03C Grade Tolerance
19-1.03D Buried Man-Made Objects <\/td>\n<\/tr>\n
254<\/td>\n19-1.04 PAYMENT
19-2.01 GENERAL
19-2.01A Summary
19-2.01B Definitions
19-2.01C Submittals
19-2.01D Quality Assurance
19-2.02 MATERIALS
19-2.03 CONSTRUCTION
19-2.03A General
19-2.03B Surplus Material <\/td>\n<\/tr>\n
255<\/td>\n19-2.03C Deficiency Material
19-2.03D Selected Material
19-2.03E Blasting
19-2.03F Slides and Slipouts <\/td>\n<\/tr>\n
256<\/td>\n19-2.03G Slopes
19-2.03H Ditch Excavation
19-2.04 PAYMENT <\/td>\n<\/tr>\n
257<\/td>\n19-3.01 GENERAL
19-3.01A Summary
19-3.01B Definitions
19-3.01C Submittals
19-3.01C(1) General
19-3.01C(2) Cofferdams
19-3.01C(3) Soldier Pile Walls <\/td>\n<\/tr>\n
258<\/td>\n19-3.01C(4) Ground Anchor and Soil Nail Walls
19-3.01C(5) Test Results
19-3.01C(6) Controlled Low-Strength Material
19-3.01D Quality Assurance
19-3.01D(1) General
19-3.01D(2) Stability Test for Ground Anchor and Soil Nail Walls <\/td>\n<\/tr>\n
259<\/td>\n19-3.02 MATERIALS
19-3.02A General
19-3.02B Cofferdam
19-3.02C Structure Backfill <\/td>\n<\/tr>\n
260<\/td>\n19-3.02D Pervious Backfill Material
19-3.02E Slurry Cement Backfill <\/td>\n<\/tr>\n
261<\/td>\n19-3.02F Culvert Beddings
19-3.02F(1) General
19-3.02F(2) Sand Beddings
19-3.02F(3) Soil Cement Beddings
19-3.02G Controlled Low-Strength Material <\/td>\n<\/tr>\n
262<\/td>\n19-3.02H Concrete Backfill
19-3.02I Lean Concrete Backfill
19-3.02J Filter Fabric
19-3.03 CONSTRUCTION
19-3.03A General
19-3.03B Structure Excavation
19-3.03B(1) General
19-3.03B(2) Soldier Pile Walls <\/td>\n<\/tr>\n
263<\/td>\n19-3.03B(3) Pier Column Excavation
19-3.03B(4) Cofferdams
19-3.03B(5) Water Control and Foundation Treatment <\/td>\n<\/tr>\n
264<\/td>\n19-3.03C\u201319-3.03D Reserved
19-3.03E Structure Backfill
19-3.03E(1) General <\/td>\n<\/tr>\n
265<\/td>\n19-3.03E(2) Crib Walls
19-3.03E(3) Soldier Pile Walls
19-3.03F Slurry Cement Backfill
19-3.03G Pervious Backfill Material
19-3.03H Culvert Bedding <\/td>\n<\/tr>\n
266<\/td>\n19-3.03I Controlled Low-Strength Material
19-3.03J Soldier Pile Walls
19-3.03K Ground Anchor and Soil Nail Walls <\/td>\n<\/tr>\n
267<\/td>\n19-3.04 PAYMENT
19-5.01 GENERAL
19-5.02 MATERIALS <\/td>\n<\/tr>\n
268<\/td>\n19-5.03 CONSTRUCTION
19-5.03A General
19-5.03B Relative Compaction (95 Percent)
19-5.03C Relative Compaction (90 Percent)
19-5.03D Foundation Preparation
19-5.04 PAYMENT
19-6.01 GENERAL
19-6.01A Summary
19-6.01B Definitions <\/td>\n<\/tr>\n
269<\/td>\n19-6.01C Submittals
19-6.01D Quality Assurance
19-6.02 MATERIALS
19-6.02A General
19-6.02B Geosynthetic Reinforced Embankment
19-6.03 CONSTRUCTION
19-6.03A General <\/td>\n<\/tr>\n
270<\/td>\n19-6.03B Subsidence
19-6.03C Placing and Compacting <\/td>\n<\/tr>\n
271<\/td>\n19-6.03D Settlement Periods and Surcharges <\/td>\n<\/tr>\n
272<\/td>\n19-6.03E Geosynthetic Reinforced Embankment <\/td>\n<\/tr>\n
273<\/td>\n19-6.04 PAYMENT
19-7.01 GENERAL
19-7.01A Summary
19-7.01B Definitions
19-7.01C Submittals
19-7.01D Quality Assurance
19-7.02 MATERIALS
19-7.02A General
19-7.02B Local Borrow
19-7.02C Imported Borrow
19-7.03 CONSTRUCTION
19-7.03A General
19-7.03B Local Borrow <\/td>\n<\/tr>\n
274<\/td>\n19-7.03C Imported Borrow
19-7.04 PAYMENT
19-9.01 GENERAL
19-9.02 MATERIALS <\/td>\n<\/tr>\n
275<\/td>\n19-9.03 CONSTRUCTION <\/td>\n<\/tr>\n
276<\/td>\n19-9.04 PAYMENT
19-10.01 GENERAL
19-10.02 MATERIALS
19-10.03 CONSTRUCTION
19-10.03A General <\/td>\n<\/tr>\n
277<\/td>\n19-10.03C Subgrade Enhancement Geotextile
19-10.04 PAYMENT <\/td>\n<\/tr>\n
279<\/td>\n20 LANDSCAPE
20-1.01 GENERAL
20-1.01A Summary
20-1.01B Definitions
20-1.01C Submittals
20-1.01D Quality Assurance
20-1.01D(1) General
20-1.01D(2) Progress Inspections
20-1.02 MATERIALS
20-1.02A General <\/td>\n<\/tr>\n
280<\/td>\n20-1.02B Water
20-1.02C Pesticides
20-1.02D\u201320-1.02H Reserved
20-1.03 CONSTRUCTION
20-1.03A General
20-1.03B Pesticides <\/td>\n<\/tr>\n
281<\/td>\n20-1.03C Roadside Clearing
20-1.03C(1) General
20-1.03C(2) Remove Existing Plants
20-1.03C(3) Weed Control
20-1.03C(4) Disposal of Removed Groundcover, Weeds, and Mowed Material
20-1.03D Cultivation <\/td>\n<\/tr>\n
282<\/td>\n20-1.03E Weed Germination
20-1.03F\u201320-1.03K Reserved
20-1.04 PAYMENT
20-2.01 GENERAL
20-2.01A General
20-2.01A(1) Summary
20-2.01A(2) Definitions
20-2.01A(3) Submittals
20-2.01A(3)(a) General
20-2.01A(3)(b) Manufacturer’s Instructions
20-2.01A(4) Quality Assurance
20-2.01A(4)(a) General <\/td>\n<\/tr>\n
283<\/td>\n20-2.01A(4)(b) Pressure Testing
20-2.01A(4)(b)(i) General
20-2.01A(4)(b)(ii) Method A
20-2.01A(4)(b)(iii) Method B
20-2.01A(4)(c) Sprinkler Coverage Check
20-2.01A(4)(d) Irrigation System Functional Tests <\/td>\n<\/tr>\n
284<\/td>\n20-2.01A(4)(e) Final Irrigation System Check
20-2.01B Materials
20-2.01B(1) General
20-2.01B(2) Garden Valves
20-2.01B(3) Recycled Water Identification
20-2.01B(4) Location Markers
20-2.01B(5) Pull Boxes <\/td>\n<\/tr>\n
285<\/td>\n20-2.01B(6) Unions
20-2.01B(7) Valve Boxes and Covers
20-2.01B(8) Wye Strainers
20-2.01C Construction
20-2.01C(1) General
20-2.01C(2) Trenching and Backfilling <\/td>\n<\/tr>\n
286<\/td>\n20-2.01C(3) Pull Boxes
20-2.01C(4) Valve Boxes and Covers
20-2.01C(5) Recycled Water Warning Signs
20-2.01C(6) Garden Valves
20-2.01D Payment
20-2.02 BACKFLOW PREVENTER ASSEMBLIES
20-2.02A General
20-2.02A(1) Summary <\/td>\n<\/tr>\n
287<\/td>\n20-2.02A(2) Definitions
20-2.02A(3) Submittals
20-2.02A(4) Quality Assurance
20-2.02B Materials
20-2.02B(1) General
20-2.02B(2) Backflow Preventers
20-2.02B(3) Backflow Preventer Blankets
20-2.02B(4) Backflow Preventer Enclosures <\/td>\n<\/tr>\n
288<\/td>\n20-2.02C Construction
20-2.02D Payment
20-2.03 CAM COUPLER ASSEMBLIES
20-2.03A General
20-2.03B Materials
20-2.03C Construction
20-2.03D Payment
20-2.04 CONTROL AND NEUTRAL CONDUCTORS
20-2.04A General
20-2.04A(1) Summary
20-2.04A(2) Definitions
20-2.04A(3) Submittals
20-2.04A(4) Quality Assurance
20-2.04B Materials <\/td>\n<\/tr>\n
289<\/td>\n20-2.04C Construction
20-2.04C(1) General
20-2.04C(2) Conductors in Open Trenches
20-2.04C(3) Conductors in Conduits
20-2.04C(4) Splicing <\/td>\n<\/tr>\n
290<\/td>\n20-2.04C(5) Marking
20-2.04D Payment
20-2.05 FLOW SENSORS
20-2.05A General
20-2.05B Materials
20-2.05C Construction
20-2.05D Payment
20-2.06 IRRIGATION CONTROLLERS
20-2.06A General
20-2.06A(1) Summary <\/td>\n<\/tr>\n
291<\/td>\n20-2.06A(2) Definitions
20-2.06A(3) Submittals
20-2.06A(4) Quality Assurance
20-2.06B Materials
20-2.06B(1) General <\/td>\n<\/tr>\n
292<\/td>\n20-2.06B(2) Irrigation Controllers
20-2.06B(2)(a) General
20-2.06B(2)(b) Battery Powered Irrigation Controllers
20-2.06B(2)(c) Solar Powered Irrigation Controllers
20-2.06B(2)(d) Two-wire Irrigation Controllers
20-2.06B(3) Irrigation Controller Enclosure Cabinets <\/td>\n<\/tr>\n
293<\/td>\n20-2.06B(4) Rain Sensors
20-2.06C Construction
20-2.06D Payment
20-2.07 IRRIGATION CONDUIT
20-2.07A General
20-2.07A(1) Summary
20-2.07A(2) Definitions
20-2.07A(3) Submittals <\/td>\n<\/tr>\n
294<\/td>\n20-2.07A(4) Quality Assurance
20-2.07B Materials
20-2.07B(1) General
20-2.07B(2) ABS Composite Pipe Conduit
20-2.07B(3) Corrugated HDPE Pipe Conduit
20-2.07B(4) Corrugated Steel Pipe Conduit
20-2.07B(5) PVC Pipe Conduit
20-2.07B(6) Welded Steel Pipe Conduit
20-2.07C Construction
20-2.07C(1) General <\/td>\n<\/tr>\n
295<\/td>\n20-2.07C(2) Welded Steel Pipe Conduit
20-2.07C(2)(a) General
20-2.07C(2)(b) Directional Boring
20-2.07C(2)(c) Jack and Drill
20-2.07C(3) Schedule 40 PVC Pipe Conduit
20-2.07D Payment <\/td>\n<\/tr>\n
296<\/td>\n20-2.08 IRRIGATION SUPPLY LINE
20-2.08A General
20-2.08A(1) Summary
20-2.08A(2) Definitions
20-2.08A(3) Submittals
20-2.08A(4) Quality Assurance
20-2.08B Materials
20-2.08B(1) General
20-2.08B(2) Copper Pipe Supply Line
20-2.08B(3) Galvanized Steel Pipe Supply Line
20-2.08B(4) Drip Irrigation Tubing
20-2.08B(5) Plastic Pipe Supply Line <\/td>\n<\/tr>\n
297<\/td>\n20-2.08C Construction
20-2.08C(1) General
20-2.08C(2) Galvanized Steel Pipe Supply Line
20-2.08C(3) Drip Irrigation Tubing
20-2.08C(4) Plastic Pipe Supply Line <\/td>\n<\/tr>\n
298<\/td>\n20-2.08D Payment
20-2.09 SPRINKLER ASSEMBLIES
20-2.09A General
20-2.09B Materials
20-2.09B(1) General
20-2.09B(2) Pop-Up Sprinkler Assemblies
20-2.09B(3) Riser Sprinkler Assemblies
20-2.09B(4) Tree Well Sprinkler Assemblies
20-2.09C Construction <\/td>\n<\/tr>\n
299<\/td>\n20-2.09D Payment
20-2.10 VALVES
20-2.10A General
20-2.10B Materials
20-2.10B(1) General
20-2.10B(2) Ball Valves
20-2.10B(3) Check Valves
20-2.10B(4) Drip Valve Assemblies
20-2.10B(5) Garden Valve Assemblies
20-2.10B(6) Gate Valves <\/td>\n<\/tr>\n
300<\/td>\n20-2.10B(7) Pressure Regulating Valves
20-2.10B(8) Pressure Relief Valves
20-2.10B(9) Quick Coupling Valves
20-2.10B(10) Remote Control Valves
20-2.10B(10)(a) General
20-2.10B(10)(b) Remote Control Valves with Flow Sensor
20-2.10B(10)(c) Remote Control Valves with Pressure Regulator
20-2.10C Construction
20-2.10C(1) General <\/td>\n<\/tr>\n
301<\/td>\n20-2.10C(2) Control Valves
20-2.10C(3) Check Valves
20-2.10C(4) Garden Valve Assemblies
20-2.10C(5) Gate Valves
20-2.10C(6) Pressure Regulating Valves
20-2.10C(7) Quick Coupling Valves
20-2.10D Payment
20-2.11 WYE STRAINER ASSEMBLIES
20-2.11A General
20-2.11B Materials
20-2.11C Construction
20-2.11D Payment
20-2.12 RESERVED
20-2.13 SUPPLY LINE ON STRUCTURES
20-2.13A General
20-2.13A(1) General
20-2.13A(1)(a) Summary
20-2.13A(1)(b) Definitions <\/td>\n<\/tr>\n
302<\/td>\n20-2.13A(1)(c) Submittals
20-2.13A(1)(d) Quality Assurance
20-2.13A(1)(d)(i) General
20-2.13A(1)(d)(ii) Regulatory Requirements
20-2.13A(1)(d)(iii) Quality Control
20-2.13A(2) Materials
20-2.13A(2)(a) General
20-2.13A(2)(b) Air Release Valve Assemblies
20-2.13A(2)(c) Casings <\/td>\n<\/tr>\n
303<\/td>\n20-2.13A(2)(d) Pipe Wrap Tape
20-2.13A(2)(e) Pipe Hangers
20-2.13A(2)(f) Epoxy Adhesives
20-2.13A(2)(g) Concrete Pipe Supports
20-2.13A(2)(h) Pipe Clamps and Anchors
20-2.13A(2)(i) Pull Boxes
20-2.13A(3) Construction
20-2.13A(3)(a) General
20-2.13A(3)(b) Preparation
20-2.13A(3)(c) Installation
20-2.13A(3)(c)(i) General
20-2.13A(3)(c)(ii) Casings
20-2.13A(3)(c)(iii) Wrapping Water Supply Line
20-2.13A(3)(c)(iv) Pipe Clamps and Anchors <\/td>\n<\/tr>\n
304<\/td>\n20-2.13A(3)(d) Sequences of Operation
20-2.13A(4) Payment
20-2.13B Supply Line on Structures, Less than 4 Inches
20-2.13B(1) General
20-2.13B(1)(a) Summary
20-2.13B(1)(b) Definitions
20-2.13B(1)(c) Submittals
20-2.13B(1)(d) Quality Assurance
20-2.13B(2) Materials
20-2.13B(2)(a) General
20-2.13B(2)(b) Water Supply Line
20-2.13B(2)(c) Expansion Assemblies <\/td>\n<\/tr>\n
305<\/td>\n20-2.13B(2)(d) Casing Insulators
20-2.13B(2)(e) Pipe Anchorages
20-2.13B(2)(f) Pipe End Seals
20-2.13B(3) Construction
20-2.13B(4) Payment
20-2.13C Supply Line on Structures, 4 Inches and Larger
20-2.13C(1) General
20-2.13C(1)(a) Summary
20-2.13C(1)(b) Definitions
20-2.13C(1)(c) Submittals <\/td>\n<\/tr>\n
306<\/td>\n20-2.13C(1)(d) Quality Assurance
20-2.13C(2) Materials
20-2.13C(2)(a) General
20-2.13C(2)(b) Water Supply Line
20-2.13C(2)(c) Expansion Assemblies
20-2.13C(2)(d) Flange Insulating Gaskets
20-2.13C(2)(e) Casing Insulators <\/td>\n<\/tr>\n
307<\/td>\n20-2.13C(2)(f) Dirt Stops
20-2.13C(2)(g) Seismic Expansion Assemblies
20-2.13C(2)(h) Lateral Restraint Assemblies
20-2.13C(3) Construction
20-2.13C(4) Payment
20-2.14 TEMPORARY IRRIGATION SYSTEMS
20-2.15\u201320-2.18 RESERVED
20-3.01 GENERAL
20-3.01A General
20-3.01A(1) Summary <\/td>\n<\/tr>\n
308<\/td>\n20-3.01A(2) Definitions
20-3.01A(3) Submittals
20-3.01A(3)(a) General
20-3.01A(3)(b) Vendor Statements
20-3.01A(3)(c) Certificates of Compliance
20-3.01A(4) Quality Assurance
20-3.01B Materials
20-3.01B(1) General
20-3.01B(2) Plants
20-3.01B(2)(a) General <\/td>\n<\/tr>\n
309<\/td>\n20-3.01B(2)(b) Cuttings
20-3.01B(2)(b)(i) General
20-3.01B(2)(b)(ii) Carpobrotus and Delosperma Cuttings
20-3.01B(2)(b)(iii) Willow Cuttings
20-3.01B(2)(b)(iv) Cottonwood Cuttings <\/td>\n<\/tr>\n
310<\/td>\n20-3.01B(2)(b)(v)\u201320-3.01B(2)(b)(viii) Reserved
20-3.01B(2)(c) Sod
20-3.01B(3) Soil Amendments
20-3.01B(4) Fertilizers
20-3.01B(4)(a) General
20-3.01B(4)(b) Slow-release Fertilizers
20-3.01B(4)(c) Packet Fertilizers
20-3.01B(4)(d) Organic Fertilizers <\/td>\n<\/tr>\n
311<\/td>\n20-3.01B(5) Root Stimulants
20-3.01B(6) Plaster Sand
20-3.01B(7) Root Barrier
20-3.01B(8) Root Protectors
20-3.01B(9) Foliage Protectors
20-3.01B(10) Wood Plant Stakes <\/td>\n<\/tr>\n
312<\/td>\n20-3.01B(11) Plant Ties
20-3.01C Construction
20-3.01C(1) General
20-3.01C(2) Pruning
20-3.01C(3) Watering
20-3.01C(4) Replacement Plants
20-3.01C(5) Maintain Plants
20-3.01D Payment
20-3.02 PLANTING WORK
20-3.02A General
20-3.02B Materials
20-3.02C Construction
20-3.02C(1) General
20-3.02C(2) Preparing Planting Areas <\/td>\n<\/tr>\n
313<\/td>\n20-3.02C(3) Planting Plants
20-3.02C(3)(a) General
20-3.02C(3)(b) Trees, Shrubs, and Vines <\/td>\n<\/tr>\n
314<\/td>\n20-3.02C(3)(c) Groundcover Plants
20-3.02C(3)(d) Cuttings, Liners, Plugs, and Seedling Plants
20-3.02C(3)(d)(i) General
20-3.02C(3)(d)(ii) Willow Cuttings <\/td>\n<\/tr>\n
315<\/td>\n20-3.02C(3)(d)(iii) Cottonwood Cuttings
20-3.02C(3)(d)(iv) Carpobrotus and Delosperma Cuttings
20-3.02C(3)(d)(v) Liner Plants
20-3.02C(3)(d)(vi) Plug Plants
20-3.02C(3)(d)(vii) Seedling Plants
20-3.02C(3)(e) Sod <\/td>\n<\/tr>\n
316<\/td>\n20-3.02D Payment
20-3.03\u201320-3.07 RESERVED
20-4.01 GENERAL
20-4.01A Summary
20-4.01B Definitions
20-4.01C Submittals
20-4.01C(1) General <\/td>\n<\/tr>\n
317<\/td>\n20-4.01C(2) Notification
20-4.01D Quality Assurance
20-4.02 MATERIALS
20-4.02A General
20-4.02B Fertilizers
20-4.03 CONSTRUCTION
20-4.03A General
20-4.03B Plant Growth Control <\/td>\n<\/tr>\n
318<\/td>\n20-4.03C Fertilizing
20-4.03D Weed Control
20-4.03E Plant Staking
20-4.03F Replacement Plants
20-4.03G Watering
20-4.04 PAYMENT
20-5.01 GENERAL
20-5.01A General <\/td>\n<\/tr>\n
319<\/td>\n20-5.01B Materials
20-5.01C Construction
20-5.01D Payment
20-5.02 EDGING
20-5.02A General
20-5.02B Materials
20-5.02B(1) General
20-5.02B(2) Header Board Edging
20-5.02B(3) Metal Edging
20-5.02B(4) HDPE Edging
20-5.02B(5) Concrete Edging
20-5.02B(6)\u201320-5.02B(10) Reserved
20-5.02C Construction
20-5.02C(1) General <\/td>\n<\/tr>\n
320<\/td>\n20-5.02C(2) Header Board Edging
20-5.02C(3) Metal and HDPE Edging
20-5.02C(4) Concrete Edging
20-5.02C(5)\u201320-5.02C(9) Reserved
20-5.02D Payment
20-5.03 INERT GROUND COVERS AND MULCHES
20-5.03A General
20-5.03A(1) General
20-5.03A(1)(a) Summary
20-5.03A(1)(b) Definitions
20-5.03A(1)(c) Submittals
20-5.03A(1)(d) Quality Assurance
20-5.03A(2) Materials
20-5.03A(3) Construction
20-5.03A(3)(a) General
20-5.03A(3)(b) Earthwork
20-5.03A(3)(c) Treatment of Soil <\/td>\n<\/tr>\n
321<\/td>\n20-5.03A(3)(d) Filter Fabric
20-5.03A(4) Payment
20-5.03B Rock Blanket
20-5.03B(1) General
20-5.03B(1)(a) Summary
20-5.03B(1)(b) Definitions
20-5.03B(1)(c) Submittals
20-5.03B(1)(d) Quality Assurance
20-5.03B(2) Materials
20-5.03B(2)(a) General
20-5.03B(2)(b) Concrete
20-5.03B(2)(c) Rock
20-5.03B(2)(d) Mortar
20-5.03B(3) Construction <\/td>\n<\/tr>\n
322<\/td>\n20-5.03B(4) Payment
20-5.03C Gravel Mulch
20-5.03C(1) General
20-5.03C(1)(a) Summary
20-5.03C(1)(b) Definitions
20-5.03C(1)(c) Submittals
20-5.03C(1)(d) Quality Assurance
20-5.03C(2) Materials
20-5.03C(3) Construction
20-5.03C(4) Payment
20-5.03D Decomposed Granite
20-5.03D(1) General
20-5.03D(1)(a) Summary
20-5.03D(1)(b) Definitions
20-5.03D(1)(c) Submittals <\/td>\n<\/tr>\n
323<\/td>\n20-5.03D(1)(d) Quality Assurance
20-5.03D(2) Materials
20-5.03D(2)(a) General
20-5.03D(2)(b) Solidifying Emulsion
20-5.03D(3) Construction <\/td>\n<\/tr>\n
324<\/td>\n20-5.03D(4) Payment
20-5.03E Wood Mulch
20-5.03E(1) General
20-5.03E(1)(a) Summary
20-5.03E(1)(b) Definitions
20-5.03E(1)(c) Submittals
20-5.03E(1)(d) Quality Assurance
20-5.03E(2) Materials
20-5.03E(2)(a) General
20-5.03E(2)(b) Tree Bark Mulch
20-5.03E(2)(c) Wood Chip Mulch
20-5.03E(2)(d) Shredded Bark Mulch
20-5.03E(2)(e) Tree Trimming Mulch <\/td>\n<\/tr>\n
325<\/td>\n20-5.03E(2)(f)\u201320-5.03E(2)(j) Reserved
20-5.03E(3) Construction
20-5.03E(4) Payment
20-5.03F\u201320-5.03J Reserved
20-5.04 RESERVED
20-5.05 SITE FURNISHINGS
20-5.05A General
20-5.05B Materials
20-5.05C Construction
20-5.05D Payment
20-5.05E\u201320-5.05Z Reserved
20-5.06\u201320-5.10 RESERVED
20-10.01 GENERAL
20-10.01A General
20-10.01B Materials
20-10.01C Construction
20-10.01D Payment <\/td>\n<\/tr>\n
326<\/td>\n20-10.02 EXISTING IRRIGATION FACILITIES
20-10.02A General
20-10.02A(1) Summary
20-10.02A(2) Definitions
20-10.02A(3) Submittals
20-10.02A(4) Quality Assurance
20-10.02B Materials
20-10.02C Construction
20-10.02C(1) General
20-10.02C(2) Check and Test Existing Irrigation Facilities
20-10.02C(3) Operate Existing Irrigation Facilities
20-10.02C(4) Remove Irrigation Facilities <\/td>\n<\/tr>\n
327<\/td>\n20-10.02C(5) Replace Valve Box Covers
20-10.02C(6) Relocate Backflow Preventer Assemblies
20-10.02C(7) Relocate Water Meters
20-10.02C(8) Relocate Irrigation Controllers
20-10.02C(9) Salvage Irrigation Facilities
20-10.02D Payment
20-10.03 EXISTING PLANTING
20-10.03A General
20-10.03A(1) Summary
20-10.03A(2) Definitions
20-10.03A(3) Submittals
20-10.03A(4) Quality Assurance
20-10.03B Materials <\/td>\n<\/tr>\n
328<\/td>\n20-10.03C Construction
20-10.03C(1) General
20-10.03C(2) Prune Existing Plants
20-10.03C(3) Transplant Trees
20-10.03C(4) Maintain Existing Planted Areas
20-10.03D Payment
20-10.04\u201320-10.08 RESERVED <\/td>\n<\/tr>\n
329<\/td>\n21 EROSION CONTROL
21-1.01 GENERAL
21-1.02 MATERIALS
21-1.03 CONSTRUCTION
21-1.04 PAYMENT
21-2.01 GENERAL
21-2.01A Summary
21-2.01B Definitions
21-2.01C Submittals
21-2.01C(1) General
21-2.01C(2) Compost
21-2.01C(3) Seed <\/td>\n<\/tr>\n
330<\/td>\n21-2.01C(4) Tackifier
21-2.01D Quality Assurance
21-2.01D(1) General
21-2.01D(2) Compost
21-2.01D(3) Seed
21-2.02 MATERIALS
21-2.02A General
21-2.02B Duff
21-2.02C Topsoil
21-2.02C(1) General <\/td>\n<\/tr>\n
331<\/td>\n21-2.02C(2) Local Topsoil
21-2.02C(3) Imported Topsoil
21-2.02D Fiber
21-2.02E Tackifier <\/td>\n<\/tr>\n
332<\/td>\n21-2.02F Seed
21-2.02G Fertilizer
21-2.02H Straw
21-2.02I Reserved
21-2.02J Bonded Fiber Matrix
21-2.02K Compost <\/td>\n<\/tr>\n
333<\/td>\n21-2.02L\u201321-2.02N Reserved
21-2.02O Rolled Erosion Control Products
21-2.02O(1) General
21-2.02O(2) Jute Mesh <\/td>\n<\/tr>\n
334<\/td>\n21-2.02O(3) Netting
21-2.02O(4) Erosion Control Blankets
21-2.02O(5) Turf Reinforcement Mats <\/td>\n<\/tr>\n
335<\/td>\n21-2.02P Fiber Rolls
21-2.02Q Compost Socks
21-2.02R Fasteners
21-2.02S\u201321-2.02V Reserved
21-2.03 CONSTRUCTION
21-2.03A General <\/td>\n<\/tr>\n
336<\/td>\n21-2.03B Duff
21-2.03C Topsoil
21-2.03D Hydromulch and Hydroseed <\/td>\n<\/tr>\n
337<\/td>\n21-2.03E Dry Seed
21-2.03F Drill Seed
21-2.03G Straw
21-2.03H Bonded Fiber Matrix
21-2.03I Compost
21-2.03J Incorporate Materials
21-2.03K\u201321-2.03N Reserved
21-2.03O Rolled Erosion Control Products <\/td>\n<\/tr>\n
338<\/td>\n21-2.03P Fiber Rolls
21-2.03Q Compost Socks
21-2.03R\u201321-2.03T Reserved
21-2.04 PAYMENT <\/td>\n<\/tr>\n
341<\/td>\n22 FINISHING ROADWAY
22-1.01 GENERAL
22-1.02 MATERIALS
22-1.03 CONSTRUCTION
22-1.04 PAYMENT <\/td>\n<\/tr>\n
343<\/td>\nDIVISION IV SUBBASES AND BASES
23 GENERAL
23-1.01 GENERAL
23-1.02 MATERIALS
23-1.03 CONSTRUCTION
23-1.04 PAYMENT <\/td>\n<\/tr>\n
345<\/td>\n24 STABILIZED SOILS
24-1.01 GENERAL
24-1.01A Summary
24-1.01B Definitions
24-1.01C Submittals
24-1.01C(1) General
24-1.01C(2) Samples
24-1.01D Quality Assurance
24-1.01D(1) General
24-1.01D(2) Quality Control
24-1.01D(2)(a) General
24-1.01D(2)(b) Preparing Basement Material
24-1.01D(2)(c) Mixing
24-1.01D(2)(d) Compaction
24-1.01D(3) Department Acceptance <\/td>\n<\/tr>\n
346<\/td>\n24-1.02 MATERIALS
24-1.02A General
24-1.02B Water
24-1.02C Curing Seal
24-1.02D Stabilizing Agent
24-1.03 CONSTRUCTION
24-1.03A General
24-1.03B Preparing Basement Material
24-1.03C Applying Stabilizing Agent
24-1.03D Mixing
24-1.03E Compaction <\/td>\n<\/tr>\n
347<\/td>\n24-1.03F Finish Grading
24-1.03G Curing
24-1.03G(1) General
24-1.03G(2) Water Cure
24-1.03G(3) Curing Seal
24-1.03G(4) Moist Material Blanket
24-1.04 PAYMENT <\/td>\n<\/tr>\n
348<\/td>\n24-2.01 GENERAL
24-2.01A Summary
24-2.01B Definitions
24-2.01C Submittals
24-2.01D Quality Assurance
24-2.01D(1) General
24-2.01D(1)(a) Preparing Basement Material
24-2.01D(1)(b) Applying Lime
24-2.01D(1)(c) Test Result Disputes <\/td>\n<\/tr>\n
349<\/td>\n24-2.01D(2) Quality Control
24-2.01D(2)(a) General
24-2.01D(2)(b) Mixing
24-2.01D(2)(c) Compaction
24-2.02 MATERIALS <\/td>\n<\/tr>\n
350<\/td>\n24-2.03 CONSTRUCTION
24-2.03A General
24-2.03B Preparing Basement Material
24-2.03C Applying Lime
24-2.03D Mixing
24-2.03E Compaction <\/td>\n<\/tr>\n
351<\/td>\n24-2.03F Finish Grading
24-2.03G Curing
24-2.04 PAYMENT <\/td>\n<\/tr>\n
353<\/td>\n25 AGGREGATE SUBBASES
25-1.01 GENERAL
25-1.01A Summary
25-1.01B Definitions
25-1.01C Submittals
25-1.01D Quality Assurance
25-1.01D(1) General
25-1.01D(2) Quality Control
25-1.01D(3) Department Acceptance
25-1.02 MATERIALS
25-1.02A General
25-1.02B Class 1, Class 2, and Class 3 Aggregate Subbases <\/td>\n<\/tr>\n
354<\/td>\n25-1.02C Class 4 Aggregate Subbase
25-1.02D Class 5 Aggregate Subbase
25-1.03 CONSTRUCTION
25-1.03A General
25-1.03B Subgrade
25-1.03C Placing Geosynthetics Materials <\/td>\n<\/tr>\n
355<\/td>\n25-1.03D Spreading
25-1.03E Compacting
25-1.04 PAYMENT <\/td>\n<\/tr>\n
357<\/td>\n26 AGGREGATE BASES
26-1.01 GENERAL
26-1.01A Summary
26-1.01B Definitions
26-1.01C Submittals
26-1.01D Quality Assurance
26-1.01D(1) General
26-1.01D(2) Quality Control
26-1.01D(3) Department Acceptance
26-1.02 MATERIALS
26-1.02A General
26-1.02B Class 2 Aggregate Base <\/td>\n<\/tr>\n
358<\/td>\n26-1.02C Class 3 Aggregate Base
26-1.03 CONSTRUCTION
26-1.03A General
26-1.03B Subgrade <\/td>\n<\/tr>\n
359<\/td>\n26-1.03C Placing Geosynthetic Materials
26-1.03D Spreading
26-1.03E Compacting <\/td>\n<\/tr>\n
360<\/td>\n26-1.04 PAYMENT <\/td>\n<\/tr>\n
361<\/td>\n27 CEMENT TREATED BASES
27-1.01 GENERAL
27-1.01A Summary
27-1.01B Definitions
27-1.01C Submittals
27-1.01D Quality Assurance
27-1.01D(1) General
27-1.01D(2) Aggregate
27-1.01D(3) Road-Mixed Cement Treated Base Moisture Content
27-1.01D(4) Plant-Mixed Cement Treated Base Moisture Content
27-1.02 MATERIALS <\/td>\n<\/tr>\n
362<\/td>\n27-1.03 CONSTRUCTION
27-1.03A General
27-1.03B Subgrade
27-1.03C Depositing Aggregate and Mixing Road-Mixed Cement Treated Base
27-1.03C(1) General
27-1.03C(2) Depositing Aggregate
27-1.03C(3) Mixing <\/td>\n<\/tr>\n
363<\/td>\n27-1.03D Proportioning and Mixing Plant-Mixed Cement Treated Base
27-1.03D(1) General
27-1.03D(2) Batch Mixing <\/td>\n<\/tr>\n
364<\/td>\n27-1.03D(3) Continuous Mixing
27-1.03E Spreading Treated Mixture <\/td>\n<\/tr>\n
365<\/td>\n27-1.03F Compacting <\/td>\n<\/tr>\n
366<\/td>\n27-1.03G Operation Time Requirement
27-1.03H Contact Joints
27-1.03I Curing <\/td>\n<\/tr>\n
367<\/td>\n27-1.04 PAYMENT <\/td>\n<\/tr>\n
369<\/td>\n28 CONCRETE BASES
28-1.01 GENERAL
28-1.01A Summary
28-1.01B Definitions
28-1.01C Submittals
28-1.01D Quality Assurance
28-1.02 MATERIALS
28-1.03 CONSTRUCTION
28-1.03A General
28-1.03B Subgrade Preparation
28-1.03C Placing <\/td>\n<\/tr>\n
370<\/td>\n28-1.04 PAYMENT
28-2.01 GENERAL
28-2.01A Summary
28-2.01B Definitions
28-2.01C Submittals
28-2.01C(1) General
28-2.01C(2) Field Qualification
28-2.01D Quality Assurance
28-2.01D(1) General <\/td>\n<\/tr>\n
371<\/td>\n28-2.01D(2) Qualifications
28-2.01D(3) Aggregate Qualification Testing
28-2.01D(4) Field Qualification Testing
28-2.01D(5) Quality Control <\/td>\n<\/tr>\n
372<\/td>\n28-2.01D(6) Department Acceptance
28-2.02 MATERIALS
28-2.02A General
28-2.02B Cementitious Material
28-2.02C Aggregate <\/td>\n<\/tr>\n
373<\/td>\n28-2.03 CONSTRUCTION
28-2.03A General
28-2.03B Subgrade
28-2.03C Proportioning, Mixing, and Transporting
28-2.03D Placing <\/td>\n<\/tr>\n
374<\/td>\n28-2.03E Finishing
28-2.03F Curing
28-2.03G Surfaces Not Within Tolerance
28-2.04 PAYMENT
28-3.01 GENERAL
28-3.01A Summary <\/td>\n<\/tr>\n
375<\/td>\n28-3.01B Definitions
28-3.01C Submittals
28-3.01C(1) General
28-3.01C(2) Quality Assurance Submittals
28-3.01C(3) Quality Control Plan
28-3.01D Quality Assurance
28-3.01D(1) General <\/td>\n<\/tr>\n
376<\/td>\n28-3.01D(2) Preconstruction Meeting
28-3.01D(3) Test Strip
28-3.01D(4) Quality Control
28-3.01D(4)(a) General
28-3.01D(4)(b) Quality Control Manager
28-3.01D(4)(c) Quality Control Testing
28-3.01D(5) Department Acceptance
28-3.02 MATERIALS
28-3.02A General
28-3.02B Rapid Strength Concrete Base <\/td>\n<\/tr>\n
377<\/td>\n28-3.02C Curing Seal
28-3.03 CONSTRUCTION
28-3.03A General
28-3.03B Subgrade
28-3.03C Placing, Spreading, and Shaping
28-3.03D Curing
28-3.03E Surfaces Not Within Tolerance <\/td>\n<\/tr>\n
378<\/td>\n28-3.04 PAYMENT
28-4.01 GENERAL
28-4.01A Summary
28-4.01B Definitions
28-4.01C Submittals
28-4.01C(1) General
28-4.01C(2) Mix Design
28-4.01C(3) Field Qualification <\/td>\n<\/tr>\n
379<\/td>\n28-4.01D Quality Assurance
28-4.01D(1) General
28-4.01D(2) Field Qualification
28-4.01D(3) Quality Control
28-4.01D(4) Department Acceptance <\/td>\n<\/tr>\n
380<\/td>\n28-4.02 MATERIALS
28-4.02A General
28-4.02B Cement
28-4.02C Chemical Admixtures
28-4.02D Aggregates
28-4.03 CONSTRUCTION
28-4.03A General
28-4.03B Proportioning, Mixing, and Transporting <\/td>\n<\/tr>\n
381<\/td>\n28-4.03C Spreading, Compacting and Shaping
28-4.04 PAYMENT
28-5.01 GENERAL
28-5.01A Summary
28-5.01B Definitions
28-5.01C Submittals
28-5.01D Quality Assurance
28-5.01D(1) General
28-5.01D(2) Department Acceptance <\/td>\n<\/tr>\n
382<\/td>\n28-5.02 MATERIALS
28-5.02A General
28-5.02B Portland Cement Concrete
28-5.02C Curing Seal
28-5.03 CONSTRUCTION
28-5.03A General
28-5.03B Placing, Spreading, and Shaping
28-5.04 PAYMENT <\/td>\n<\/tr>\n
383<\/td>\n28-15.01 GENERAL
28-15.01A General
28-15.01B Materials
28-15.01C Construction
28-15.01D Payment
28-15.02 REPLACE BASES
28-15.03\u201328-15.08 RESERVED <\/td>\n<\/tr>\n
385<\/td>\n29 TREATED PERMEABLE BASES
29-1.01 GENERAL
29-1.02 MATERIALS
29-1.03 CONSTRUCTION
29-1.03A General
29-1.03B Surfaces Out of Tolerance
29-1.04 PAYMENT
29-2.01 GENERAL
29-2.01A Summary
29-2.01B Definitions <\/td>\n<\/tr>\n
386<\/td>\n29-2.01C Submittals
29-2.01D Quality Assurance
29-2.02 MATERIALS
29-2.02A General
29-2.02B Aggregate
29-2.03 CONSTRUCTION <\/td>\n<\/tr>\n
387<\/td>\n29-2.04 PAYMENT
29-3.01 GENERAL
29-3.02 MATERIALS
29-3.02A General
29-3.02B Aggregate
29-3.03 CONSTRUCTION
29-3.04 PAYMENT <\/td>\n<\/tr>\n
389<\/td>\n30 RECLAIMED PAVEMENT
30-1.01 GENERAL
30-1.01A Summary
30-1.01B Definitions
30-1.01C Submittals
30-1.01C(1) General
30-1.01C(2) Asphaltic Emulsion
30-1.01C(3) Quality Assurance Submittals
30-1.01C(3)(a) General
30-1.01C(3)(b) Test Strip
30-1.01C(3)(c) Quality Control Reporting <\/td>\n<\/tr>\n
390<\/td>\n30-1.01D Quality Assurance
30-1.01D(1) General
30-1.01D(2) Preoperation Meeting <\/td>\n<\/tr>\n
391<\/td>\n30-1.01D(3) Test Strip
30-1.01D(4) Quality Control
30-1.01D(4)(a) General
30-1.01D(4)(b) Sampling and Testing
30-1.01D(5) Department Acceptance
30-1.02 MATERIALS
30-1.02A General
30-1.02B Supplementary Aggregate
30-1.02C Water
30-1.02D Cement <\/td>\n<\/tr>\n
392<\/td>\n30-1.02E Asphaltic Emulsion
30-1.03 CONSTRUCTION
30-1.03A General
30-1.03B Equipment
30-1.03C Surface Preparation
30-1.03D Pulverizing and Mixing
30-1.03E Compacting and Grading
30-1.03F Finishing
30-1.04 PAYMENT <\/td>\n<\/tr>\n
393<\/td>\n30-2.01 GENERAL
30-2.01A Summary
30-2.01B Definitions
30-2.01C Submittals
30-2.01D Quality Assurance
30-2.01D(1) General
30-2.01D(2) Quality Control
30-2.01D(2)(a) General
30-2.01D(2)(b) Test Strip
30-2.01D(3) Department Acceptance <\/td>\n<\/tr>\n
394<\/td>\n30-2.02 MATERIALS
30-2.02A General
30-2.02B Sand Cover
30-2.02C Supplementary Aggregate
30-2.03 CONSTRUCTION
30-2.03A General
30-2.03B Equipment <\/td>\n<\/tr>\n
395<\/td>\n30-2.03C Spreading
30-2.03D Compacting and Grading
30-2.03E Finishing
30-2.04 PAYMENT
30-3.01 GENERAL
30-3.01A Summary
30-3.01B Definitions
30-3.01C Submittals
30-3.01C(1) General
30-3.01C(2) Quality Assurance Submittals
30-3.01C(2)(a) General
30-3.01C(2)(b) Mix Design
30-3.01C(2)(c) Quality Control Reporting <\/td>\n<\/tr>\n
396<\/td>\n30-3.01D Quality Assurance
30-3.01D(1) General
30-3.01D(1)(a) General
30-3.01D(1)(b) Preoperation Meeting <\/td>\n<\/tr>\n
397<\/td>\n30-3.01D(1)(c) Test Strip
30-3.01D(2) Quality Control
30-3.01D(2)(a) General
30-3.01D(2)(b) Mix Design Sampling and Testing
30-3.01D(2)(c) Quality Control Sampling and Testing <\/td>\n<\/tr>\n
398<\/td>\n30-3.01D(3) Department Acceptance
30-3.02 MATERIALS
30-3.02A General <\/td>\n<\/tr>\n
399<\/td>\n30-3.02B Asphalt Binder
30-3.02C Core Backfill Material
30-3.03 CONSTRUCTION
30-3.03A General
30-3.03B Equipment <\/td>\n<\/tr>\n
400<\/td>\n30-3.03C Spreading Materials
30-3.03D Pulverizing and Mixing <\/td>\n<\/tr>\n
401<\/td>\n30-3.03E Compacting and Grading
30-3.03F Finishing
30-3.04 PAYMENT
30-4.01 GENERAL
30-4.01A Summary
30-4.01B Definitions <\/td>\n<\/tr>\n
402<\/td>\n30-4.01C Submittals
30-4.01C(1) General
30-4.01C(2) Quality Assurance Submittals
30-4.01C(2)(a) General
30-4.01C(2)(b) Mix Design
30-4.01C(2)(c) Quality Control Reporting
30-4.01D Quality Assurance
30-4.01D(1) General <\/td>\n<\/tr>\n
403<\/td>\n30-4.01D(2) Mix Design
30-4.01D(3) Quality Control
30-4.01D(3)(a) General
30-4.01D(3)(b) Sampling, and Testing <\/td>\n<\/tr>\n
404<\/td>\n30-4.01D(4) Department Acceptance
30-4.02 MATERIALS
30-4.02A General <\/td>\n<\/tr>\n
405<\/td>\n30-4.02B Cement
30-4.02C Water
30-4.02D Supplementary Aggregate
30-4.02E Core Backfill Material
30-4.03 CONSTRUCTION
30-4.03A General
30-4.03B Equipment <\/td>\n<\/tr>\n
406<\/td>\n30-4.03C Pulverizing
30-4.03D Spreading Materials
30-4.03E Mixing
30-4.03F Compacting and Grading
30-4.03G Finishing <\/td>\n<\/tr>\n
407<\/td>\n30-4.04 PAYMENT
30-10.01 GENERAL
30-10.01A Summary
30-10.01B Definitions
30-10.01C Submittals
30-10.01D Quality Assurance
30-10.01D(1) General
30-10.01D(2) Test Section
30-10.01D(3) Quality Control <\/td>\n<\/tr>\n
408<\/td>\n30-10.01D(4) Department Acceptance
30-10.02 MATERIALS
30-10.02A General
30-10.03 CONSTRUCTION
30-10.03A General
30-10.03B Cracking
30-10.03C Seating
30-10.03D Surface Preparation <\/td>\n<\/tr>\n
409<\/td>\n30-10.03E Reserved
30-10.04 PAYMENT
31\u201335 RESERVED <\/td>\n<\/tr>\n
411<\/td>\nDIVISION V SURFACINGS AND PAVEMENTS
36 GENERAL
36-1.01 GENERAL
36-1.01A Summary
36-1.01B Definitions
36-1.01C Submittals
36-1.01D Quality Assurance
36-1.01D(1) General
36-1.01D(2) Preconstruction Meetings
36-1.02 MATERIALS <\/td>\n<\/tr>\n
412<\/td>\n36-1.03 CONSTRUCTION
36-1.04 PAYMENT
36-2.01 GENERAL
36-2.01A Summary
36-2.01B Definitions
36-2.01C Submittals
36-2.01D Quality Assurance
36-2.02 MATERIALS
36-2.03 CONSTRUCTION
36-2.03A General
36-2.03B Applying and Placing Base Bond Breaker <\/td>\n<\/tr>\n
413<\/td>\n36-2.04 PAYMENT
36-3.01 GENERAL
36-3.01A Summary
36-3.01B Definitions
36-3.01C Submittals
36-3.01C(1) General
36-3.01C(2) Inertial Profiler Certification
36-3.01C(3) Inertial Profiler Data <\/td>\n<\/tr>\n
414<\/td>\n36-3.01C(4) Straightedge Measurements
36-3.01D Quality Assurance
36-3.01D(1) General
36-3.01D(2) Certifications
36-3.01D(3) Quality Control
36-3.01D(3)(a) General <\/td>\n<\/tr>\n
415<\/td>\n36-3.01D(3)(b) Smoothness
36-3.01D(3)(b)(i) General
36-3.01D(3)(b)(ii) Inertial Profiler Calibration and Verification Tests
36-3.01D(3)(b)(iii) Performing, Analyzing and Collecting Data <\/td>\n<\/tr>\n
416<\/td>\n36-3.01D(4) Department Acceptance
36-3.02 MATERIALS
36-3.03 CONSTRUCTION
36-3.04 PAYMENT <\/td>\n<\/tr>\n
417<\/td>\n37 BITUMINOUS SEALS
37-1.01 GENERAL
37-1.01A Summary
37-1.01B Definitions
37-1.01C Submittals
37-1.01D Quality Assurance
37-1.02 MATERIALS
37-1.03 CONSTRUCTION
37-1.03A General
37-1.03B Equipment <\/td>\n<\/tr>\n
418<\/td>\n37-1.04 PAYMENT
37-2.01 GENERAL
37-2.01A General
37-2.01A(1) Summary
37-2.01A(2) Definitions
37-2.01A(3) Submittals
37-2.01A(4) Quality Assurance
37-2.01A(4)(a) General
37-2.01A(4)(b) Quality Control
37-2.01A(4)(c) Department Acceptance
37-2.01B Materials
37-2.01C Construction
37-2.01C(1) General <\/td>\n<\/tr>\n
419<\/td>\n37-2.01C(2) Equipment
37-2.01C(3) Surface Preparation
37-2.01C(4) Applying Emulsion and Asphalt Binder <\/td>\n<\/tr>\n
420<\/td>\n37-2.01C(5) Spreading Screenings
37-2.01C(6) Finishing
37-2.01C(7) Seal Coat Brooming <\/td>\n<\/tr>\n
421<\/td>\n37-2.01D Payment
37-2.02 FOG SEAL COAT
37-2.02A General
37-2.02A(1) Summary
37-2.02A(2) Definitions
37-2.02A(3) Submittals
37-2.02A(4) Quality Assurance
37-2.02B Materials
37-2.02C Construction <\/td>\n<\/tr>\n
422<\/td>\n37-2.02D Payment
37-2.03 FLUSH COATS
37-2.03A General
37-2.03B Materials
37-2.03C Construction
37-2.03D Payment
37-2.04 ASPHALTIC EMULSION SEAL COAT
37-2.04A General
37-2.04A(1) General
37-2.04A(1)(a) Summary
37-2.04A(1)(b) Definitions
37-2.04A(1)(c) Submittals <\/td>\n<\/tr>\n
423<\/td>\n37-2.04A(1)(d) Quality Assurance
37-2.04A(2) Materials
37-2.04A(3) Construction
37-2.04A(4) Payment
37-2.04B Nonpolymer Asphaltic Emulsion Seal Coat
37-2.04B(1) General
37-2.04B(1)(a) Summary
37-2.04B(1)(b) Definitions
37-2.04B(1)(c) Submittals
37-2.04B(1)(d) Quality Assurance
37-2.04B(1)(d)(i) General
37-2.04B(1)(d)(ii) Quality Control <\/td>\n<\/tr>\n
424<\/td>\n37-2.04B(1)(d)(iii) Department Acceptance
37-2.04B(2) Materials
37-2.04B(3) Construction <\/td>\n<\/tr>\n
425<\/td>\n37-2.04B(4) Payment
37-2.04C Polymer Asphaltic Emulsion Seal Coat
37-2.04C(1) General
37-2.04C(1)(a) Summary
37-2.04C(1)(b) Definitions
37-2.04C(1)(c) Submittals <\/td>\n<\/tr>\n
426<\/td>\n37-2.04C(1)(d) Quality Assurance <\/td>\n<\/tr>\n
427<\/td>\n37-2.04C(2) Materials
37-2.04C(3) Construction <\/td>\n<\/tr>\n
428<\/td>\n37-2.04C(4) Payment <\/td>\n<\/tr>\n
429<\/td>\n37-2.05 ASPHALT BINDER SEAL COATS
37-2.05A General
37-2.05B Asphalt Rubber Binder Seal Coats
37-2.05B(1) General
37-2.05B(1)(a) Summary
37-2.05B(1)(b) Definitions
37-2.05B(1)(c) Submittals <\/td>\n<\/tr>\n
430<\/td>\n37-2.05B(1)(d) Quality Assurance
37-2.05B(1)(d)(i) General
37-2.05B(1)(d)(ii) Quality Control
37-2.05B(1)(d)(ii)(A) General
37-2.05B(1)(d)(ii)(B) Asphalt Modifier
37-2.05B(1)(d)(ii)(C) Crumb Rubber Modifier
37-2.05B(1)(d)(ii)(D) Asphalt Rubber Binder <\/td>\n<\/tr>\n
431<\/td>\n37-2.05B(1)(d)(iii) Department Acceptance
37-2.05B(1)(d)(iii)(A) General
37-2.05B(1)(d)(iii)(B) Crumb Rubber Modifier
37-2.05B(1)(d)(iii)(C) Asphalt Rubber Binder <\/td>\n<\/tr>\n
432<\/td>\n37-2.05B(1)(d)(iii)(D) Precoated Screenings
37-2.05B(2) Materials
37-2.05B(2)(a) General
37-2.05B(2)(b) Asphalt Binder
37-2.05B(2)(c) Asphalt Modifier
37-2.05B(2)(d) Crumb Rubber Modifier <\/td>\n<\/tr>\n
433<\/td>\n37-2.05B(2)(e) Asphalt Rubber Binder <\/td>\n<\/tr>\n
434<\/td>\n37-2.05B(2)(f) Screenings <\/td>\n<\/tr>\n
435<\/td>\n37-2.05B(3) Construction
37-2.05B(3)(a) General
37-2.05B(3)(b) Equipment
37-2.05B(3)(c) Precoating Screenings
37-2.05B(3)(d) Asphalt Rubber Binder Application <\/td>\n<\/tr>\n
436<\/td>\n37-2.05B(3)(e) Screenings Application
37-2.05B(3)(f) Rolling and Sweeping
37-2.05B(4) Payment
37-2.05C Reserved
37-2.06 STRESS ABSORBING MEMBRANE INTERLAYER
37-2.06A General
37-2.06B Materials
37-2.06C Construction <\/td>\n<\/tr>\n
437<\/td>\n37-2.06D Payment
37-2.07\u201337-2.10 RESERVED
37-3.01 GENERAL
37-3.01A Summary
37-3.01B Definitions
37-3.01C Submittals
37-3.01C(1) General
37-3.01C(2) Slurry Seal
37-3.01C(3) Micro-surfacing <\/td>\n<\/tr>\n
438<\/td>\n37-3.01D Quality Assurance
37-3.01D(1) General
37-3.01D(2) Slurry Seal
37-3.01D(3) Micro-surfacing
37-3.01D(4) Department Acceptance <\/td>\n<\/tr>\n
439<\/td>\n37-3.02 MATERIALS
37-3.02A General
37-3.02B Slurry Seal
37-3.02B(1) General
37-3.02B(2) Aggregate <\/td>\n<\/tr>\n
440<\/td>\n37-3.02B(3) Polymer Modified Asphaltic Emulsion
37-3.02C Micro-surfacing
37-3.02C(1) General <\/td>\n<\/tr>\n
441<\/td>\n37-3.02C(2) Aggregate
37-3.02C(3) Micro-surfacing Emulsion <\/td>\n<\/tr>\n
442<\/td>\n37-3.02C(4) Mineral Filler
37-3.03 CONSTRUCTION
37-3.03A General
37-3.03B Proportioning
37-3.03B(1) General
37-3.03B(2) Slurry Seal
37-3.03B(3) Micro-surfacing
37-3.03C Mixing and Spreading Equipment
37-3.03C(1) General
37-3.03C(2) Truck Mounted Mixer Spreaders <\/td>\n<\/tr>\n
443<\/td>\n37-3.03C(3) Continuous Self-Loading Mixing Machine
37-3.03C(4) Slurry Seal Equipment
37-3.03C(4)(a) General
37-3.03C(4)(b) Spreader Box
37-3.03C(5) Micro-surfacing Equipment
37-3.03C(5)(a) General
37-3.03C(5)(b) Spreader Box <\/td>\n<\/tr>\n
444<\/td>\n37-3.03C(5)(c) Shoulder Equipment
37-3.03C(5)(d) Scratch Course Box
37-3.03C(5)(e) Wheel Path Depression Boxes
37-3.03D Placing
37-3.03D(1) General
37-3.03D(2) Surface Preparation
37-3.03D(2)(a) General
37-3.03D(2)(b) Slurry Seal <\/td>\n<\/tr>\n
445<\/td>\n37-3.03D(2)(c) Micro-surfacing
37-3.03D(2)(c)(i) General
37-3.03D(2)(c)(ii) Repair Wheel Path Depression
37-3.03D(3) Test Strips
37-3.03D(3)(a) General
37-3.03D(3)(b) Slurry Seal
37-3.03D(3)(c) Micro-surfacing
37-3.03D(4) Placement
37-3.03D(4)(a) General
37-3.03D(4)(a)(i) General <\/td>\n<\/tr>\n
446<\/td>\n37-3.03D(4)(a)(ii) Weather Conditions
37-3.03D(4)(b) Slurry Seal
37-3.03D(4)(c) Micro-surfacing
37-3.03D(4)(c)(i) General <\/td>\n<\/tr>\n
447<\/td>\n37-3.03D(4)(c)(ii) Joints
37-3.03D(4)(c)(iii) Finished Surface
37-3.03D(4)(c)(iv) Repair of Early Distress
37-3.04 PAYMENT
37-4.01 GENERAL
37-4.01A Summary
37-4.01B Definitions
37-4.01C Submittals <\/td>\n<\/tr>\n
448<\/td>\n37-4.01D Quality Assurance
37-4.02 MATERIALS
37-4.02A General
37-4.02B Mix Design
37-4.02C Proportioning <\/td>\n<\/tr>\n
449<\/td>\n37-4.03 CONSTRUCTION
37-4.03A General
37-4.03C Surface Preparation
37-4.03D Placement
37-4.04 PAYMENT
37-5.01 GENERAL
37-5.01A Summary
37-5.01B Definitions <\/td>\n<\/tr>\n
450<\/td>\n37-5.01C Submittals
37-5.01D Quality Assurance
37-5.02 MATERIALS <\/td>\n<\/tr>\n
451<\/td>\n37-5.03 CONSTRUCTION <\/td>\n<\/tr>\n
452<\/td>\n37-5.04 PAYMENT
38 RESERVED <\/td>\n<\/tr>\n
453<\/td>\n39 ASPHALT CONCRETE
39-1.01 GENERAL
39-1.02 MATERIALS
39-1.03 CONSTRUCTION
39-1.04 PAYMENT
39-2.01 GENERAL
39-2.01A General
39-2.01A(1) Summary <\/td>\n<\/tr>\n
454<\/td>\n39-2.01A(2) Definitions <\/td>\n<\/tr>\n
455<\/td>\n39-2.01A(3) Submittals
39-2.01A(3)(a) General
39-2.01A(3)(b) Job Mix Formula
39-2.01A(3)(b)(i) General
39-2.01A(3)(b)(ii) Job Mix Formula Renewal
39-2.01A(3)(b)(iii) Job Mix Formula Modification <\/td>\n<\/tr>\n
456<\/td>\n39-2.01A(3)(c) Quality Control Plan
39-2.01A(3)(d) Test Results <\/td>\n<\/tr>\n
457<\/td>\n39-2.01A(3)(e) Reserved
39-2.01A(3)(f) Liquid Antistrip Treatment
39-2.01A(3)(g) Lime Treatment <\/td>\n<\/tr>\n
458<\/td>\n39-2.01A(3)(h) Warm Mix Asphalt Technology <\/td>\n<\/tr>\n
459<\/td>\n39-2.01A(3)(i) Samples
39-2.01A(3)(j)\u201339-2.01A(3)(k) Reserved
39-2.01A(3)(l) Data Cores <\/td>\n<\/tr>\n
460<\/td>\n39-2.01A(3)(m)\u201339-2.01A(3)(o) Reserved
39-2.01A(4) Quality Assurance
39-2.01A(4)(a) General
39-2.01A(4)(b) Job Mix Formula Verification <\/td>\n<\/tr>\n
461<\/td>\n39-2.01A(4)(c) Job Mix Formula Authorization
39-2.01A(4)(d) Job Mix Formula Renewal <\/td>\n<\/tr>\n
462<\/td>\n39-2.01A(4)(e) Job Mix Formula Modification
39-2.01A(4)(f) Certifications
39-2.01A(4)(f)(i) General
39-2.01A(4)(f)(ii) Hot Mix Asphalt Plants
39-2.01A(4)(f)(iii)\u201339-2.01A(4)(f)(v) Reserved
39-2.01A(4)(g) Reserved
39-2.01A(4)(h) Quality Control
39-2.01A(4)(h)(i) General <\/td>\n<\/tr>\n
463<\/td>\n39-2.01A(4)(h)(ii) Reserved
39-2.01A(4)(h)(iii) Aggregates
39-2.01A(4)(h)(iii)(A) General
39-2.01A(4)(h)(iii)(B) Aggregate Lime Treatments <\/td>\n<\/tr>\n
464<\/td>\n39-2.01A(4)(h)(iv) Liquid Antistrip Treatment
39-2.01A(4)(h)(v) Production Start-up Evaluation
39-2.01A(4)(h)(vi) Hot Mix Asphalt Density
39-2.01A(4)(h)(vii) Tapered Notched Wedge
39-2.01A(4)(h)(viii) Density Cores <\/td>\n<\/tr>\n
465<\/td>\n39-2.01A(4)(h)(ix) Pavement Smoothness
39-2.01A(4)(h)(x) Reserved
39-2.01A(4)(i) Department Acceptance
39-2.01A(4)(i)(i) General <\/td>\n<\/tr>\n
466<\/td>\n39-2.01A(4)(i)(ii) In-Place Density
39-2.01A(4)(i)(iii) Pavement Smoothness <\/td>\n<\/tr>\n
467<\/td>\n39-2.01A(4)(i)(iv) Dispute Resolution
39-2.01B Materials
39-2.01B(1) General
39-2.01B(2) Mix Design
39-2.01B(2)(a) General
39-2.01B(2)(b) Hot Mix Asphalt Treatments <\/td>\n<\/tr>\n
468<\/td>\n39-2.01B(2)(c) Warm Mix Asphalt Technology
39-2.01B(3) Asphalt Binder
39-2.01B(4) Aggregates
39-2.01B(4)(a) General
39-2.01B(4)(b) Aggregate Gradations
39-2.01B(4)(c) Aggregate Lime Treatments
39-2.01B(4)(c)(i) General <\/td>\n<\/tr>\n
469<\/td>\n39-2.01B(4)(c)(ii) Dry Lime
39-2.01B(4)(c)(iii) Lime Slurry <\/td>\n<\/tr>\n
470<\/td>\n39-2.01B(5) Liquid Antistrip Treatment
39-2.01B(6)\u201339-2.01B(7) Reserved
39-2.01B(8) Hot Mix Asphalt Production
39-2.01B(8)(a) General
39-2.01B(8)(b) Liquid Antistrip <\/td>\n<\/tr>\n
471<\/td>\n39-2.01B(8)(c) Warm Mix Asphalt Technology <\/td>\n<\/tr>\n
472<\/td>\n39-2.01B(9) Geosynthetic Pavement Interlayer
39-2.01B(10) Tack Coat
39-2.01B(11) Miscellaneous Areas and Dikes
39-2.01C Construction
39-2.01C(1) General
39-2.01C(2) Spreading and Compacting Equipment
39-2.01C(2)(a) General <\/td>\n<\/tr>\n
473<\/td>\n39-2.01C(2)(b) Material Transfer Vehicle
39-2.01C(2)(c) Method Compaction Equipment
39-2.01C(2)(d)\u201339-2.01C(2)(f) Reserved
39-2.01C(3) Surface Preparation
39-2.01C(3)(a) General
39-2.01C(3)(b) Subgrade
39-2.01C(3)(c) Reserved
39-2.01C(3)(d) Prepaving Inertial Profiler <\/td>\n<\/tr>\n
474<\/td>\n39-2.01C(3)(e) Prepaving Grinding
39-2.01C(3)(f) Tack Coat <\/td>\n<\/tr>\n
475<\/td>\n39-2.01C(3)(g) Geosynthetic Pavement Interlayer <\/td>\n<\/tr>\n
476<\/td>\n39-2.01C(4) Longitudinal Joints
39-2.01C(4)(a) General
39-2.01C(4)(b) Tapered Notched Wedge <\/td>\n<\/tr>\n
477<\/td>\n39-2.01C(5) Pavement Edge Treatments
39-2.01C(6) Widening Existing Pavement
39-2.01C(7) Shoulders, Medians, and Other Road Connections
39-2.01C(8) Leveling <\/td>\n<\/tr>\n
478<\/td>\n39-2.01C(9) Miscellaneous Areas and Dikes
39-2.01C(10)\u201339-2.01C(14) Reserved
39-2.01C(15) Compaction
39-2.01C(15)(a) General
39-2.01C(15)(b) Method Compaction
39-2.01C(15)(c)\u201339-2.01C(15)(e) Reserved
39-2.01C(16) Smoothness Corrections <\/td>\n<\/tr>\n
479<\/td>\n39-2.01C(17) Data Cores
39-2.01D Payment <\/td>\n<\/tr>\n
480<\/td>\n39-2.02 TYPE A HOT MIX ASPHALT
39-2.02A General
39-2.02A(1) Summary
39-2.02A(2) Definitions
39-2.02A(3) Submittals
39-2.02A(3)(a) General
39-2.02A(3)(b) Job Mix Formula
39-2.02A(3)(c) Reclaimed Asphalt Pavement
39-2.02A(3)(d)\u201339-2.02A(3)(f) Reserved
39-2.02A(4) Quality Assurance
39-2.02A(4)(a) General
39-2.02A(4)(b) Quality Control
39-2.02A(4)(b)(i) General
39-2.02A(4)(b)(ii) Aggregates <\/td>\n<\/tr>\n
481<\/td>\n39-2.02A(4)(b)(iii) Reclaimed Asphalt Pavement
39-2.02A(4)(b)(iv)\u201339-2.02A(4)(b)(viii) Reserved
39-2.02A(4)(b)(ix) Type A Hot Mix Asphalt Production <\/td>\n<\/tr>\n
482<\/td>\n39-2.02A(4)(c)\u201339-2.02A(4)(d) Reserved
39-2.02A(4)(e) Department Acceptance <\/td>\n<\/tr>\n
484<\/td>\n39-2.02B Materials
39-2.02B(1) General
39-2.02B(2) Type A Hot Mix Asphalt Mix Design <\/td>\n<\/tr>\n
485<\/td>\n39-2.02B(3) Asphalt Binder
39-2.02B(4) Aggregates
39-2.02B(4)(a) General
39-2.02B(4)(b) Aggregate Gradations <\/td>\n<\/tr>\n
486<\/td>\n39-2.02B(5) Reclaimed Asphalt Pavement <\/td>\n<\/tr>\n
487<\/td>\n39-2.02B(6)\u201339-2.02B(10) Reserved
39-2.02B(11) Type A Hot Mix Asphalt Production
39-2.02C Construction <\/td>\n<\/tr>\n
488<\/td>\n39-2.02D Payment
39-2.03 RUBBERIZED HOT MIX ASPHALT\u2013GAP GRADED
39-2.03A General
39-2.03A(1) Summary
39-2.03A(2) Definitions
39-2.03A(3) Submittals
39-2.03A(3)(a) General
39-2.03A(3)(b) Job Mix Formula
39-2.03A(3)(c) Asphalt Rubber Binder <\/td>\n<\/tr>\n
489<\/td>\n39-2.03A(4) Quality Assurance
39-2.03A(4)(a) General
39-2.03A(4)(b) Job Mix Formula Verification
39-2.03A(4)(c) Quality Control
39-2.03A(4)(c)(i) General
39-2.03A(4)(c)(ii) Asphalt Rubber Binder
39-2.03A(4)(c)(ii)(A) General
39-2.03A(4)(c)(ii)(B) Asphalt Modifier
39-2.03A(4)(c)(ii)(C) Crumb Rubber Modifier <\/td>\n<\/tr>\n
490<\/td>\n39-2.03A(4)(c)(ii)(D) Asphalt Rubber Binder
39-2.03A(4)(c)(iii) Aggregates
39-2.03A(4)(c)(iv)\u201339-2.03A(4)(c)(viii) Reserved
39-2.03A(4)(c)(ix) Rubberized Hot Mix Asphalt\u2013Gap Graded Production <\/td>\n<\/tr>\n
491<\/td>\n39-2.03A(4)(d) Reserved
39-2.03A(4)(e) Department Acceptance
39-2.03A(4)(e)(i) General <\/td>\n<\/tr>\n
492<\/td>\n39-2.03A(4)(e)(ii) Asphalt Rubber Binder
39-2.03A(4)(e)(ii)(A) General
39-2.03A(4)(e)(ii)(B) Asphalt Modifier <\/td>\n<\/tr>\n
493<\/td>\n39-2.03A(4)(e)(ii)(C) Crumb Rubber Modifier
39-2.03A(4)(e)(ii)(D) Asphalt Rubber Binder
39-2.03A(4)(e)(iii)\u201339-2.03A(4)(e)(v) Reserved
39-2.03B Materials
39-2.03B(1) General <\/td>\n<\/tr>\n
494<\/td>\n39-2.03B(2) Rubberized Hot Mix Asphalt\u2013Gap Graded Mix Design <\/td>\n<\/tr>\n
495<\/td>\n39-2.03B(3) Asphalt Rubber Binder
39-2.03B(3)(a) General
39-2.03B(3)(b) Asphalt Modifier
39-2.03B(3)(c) Crumb Rubber Modifier
39-2.03B(3)(d) Design and Profile <\/td>\n<\/tr>\n
496<\/td>\n39-2.03B(3)(e) Asphalt Rubber Binder Production
39-2.03B(3)(e)(i) General
39-2.03B(3)(e)(ii) Mixing
39-2.03B(4) Aggregates
39-2.03B(4)(a) General <\/td>\n<\/tr>\n
497<\/td>\n39-2.03B(4)(b) Aggregate Gradations <\/td>\n<\/tr>\n
498<\/td>\n39-2.03B(5) Rubberized Hot Mix Asphalt\u2013Gap Graded Production
39-2.03C Construction <\/td>\n<\/tr>\n
499<\/td>\n39-2.03D Payment
39-2.04 OPEN GRADED FRICTION COURSES
39-2.04A General
39-2.04A(1) Summary
39-2.04A(2) Definitions
39-2.04A(3) Submittals
39-2.04A(4) Quality Assurance
39-2.04A(4)(a) General
39-2.04A(4)(b) Quality Control
39-2.04A(4)(b)(i) General
39-2.04A(4)(b)(ii) Asphalt Rubber Binder
39-2.04A(4)(b)(iii) Aggregates
39-2.04A(4)(b)(iv) Open Graded Friction Course Production <\/td>\n<\/tr>\n
500<\/td>\n39-2.04A(4)(c) Department Acceptance
39-2.04A(4)(c)(i) General
39-2.04A(4)(c)(ii) Asphalt Rubber Binder
39-2.04A(4)(c)(iii) Pavement Smoothness
39-2.04A(4)(c)(iv)\u201339-2.04A(4)(c)(v) Reserved
39-2.04B Materials
39-2.04B(1) General
39-2.04B(2) Open Graded Friction Course Mix Design
39-2.04B(3) Asphalt Binder <\/td>\n<\/tr>\n
501<\/td>\n39-2.04B(4) Aggregates
39-2.04B(4)(a) General
39-2.04B(4)(b) Aggregate Gradations <\/td>\n<\/tr>\n
502<\/td>\n39-2.04B(5) Sand
39-2.04C Construction <\/td>\n<\/tr>\n
503<\/td>\n39-2.04D Payment
39-2.05 BONDED WEARING COURSES
39-2.05A General
39-2.05A(1) General
39-2.05A(1)(a) Summary
39-2.05A(1)(b) Definitions
39-2.05A(1)(c) Submittals <\/td>\n<\/tr>\n
504<\/td>\n39-2.05A(1)(d) Quality Assurance
39-2.05A(1)(d)(i) General
39-2.05A(1)(d)(ii) Quality Control
39-2.05A(1)(d)(iii) Department Acceptance
39-2.05A(2) Materials
39-2.05A(2)(a) General
39-2.05A(2)(b) Asphaltic Emulsion <\/td>\n<\/tr>\n
505<\/td>\n39-2.05A(2)(c) Reserved
39-2.05A(3) Construction
39-2.05A(3)(a) General
39-2.05A(3)(b) Spreading and Compacting Equipment
39-2.05A(3)(c) Applying Asphaltic Emulsion
39-2.05A(3)(d) Placing and Compacting Hot Mix Asphalt <\/td>\n<\/tr>\n
506<\/td>\n39-2.05A(4) Payment
39-2.05B Bonded Wearing Courses\u2013Gap Graded
39-2.05B(1) General
39-2.05B(1)(a) Summary
39-2.05B(1)(b) Definitions
39-2.05B(1)(c) Submittals
39-2.05B(1)(d) Quality Assurance
39-2.05B(1)(d)(i) General
39-2.05B(1)(d)(ii) Quality Control
39-2.05B(1)(d)(ii)(A) General
39-2.05B(1)(d)(ii)(B) Aggregates <\/td>\n<\/tr>\n
507<\/td>\n39-2.05B(1)(d)(ii)(C) Bonded Wearing Course\u2013Gap Graded Production
39-2.05B(1)(d)(ii)(D)\u201339-2.05B(1)(d)(ii)(G) Reserved
39-2.05B(1)(d)(iii) Department Acceptance
39-2.05B(2) Materials
39-2.05B(2)(a) General
39-2.05B(2)(b) Bonded Wearing Course\u2013Gap Graded Mix Design <\/td>\n<\/tr>\n
508<\/td>\n39-2.05B(2)(c) Asphalt Binder
39-2.05B(2)(d) Aggregates <\/td>\n<\/tr>\n
509<\/td>\n39-2.05B(3) Construction
39-2.05B(4) Payment <\/td>\n<\/tr>\n
510<\/td>\n39-2.06 HOT MIX ASPHALT ON BRIDGE DECKS
39-2.06A General
39-2.06B Materials
39-2.06C Construction
39-2.06D Payment
39-2.07 MINOR HOT MIX ASPHALT
39-2.07A General
39-2.07A(1) Summary
39-2.07A(2) Definitions
39-2.07A(3) Submittals
39-2.07A(4) Quality Assurance
39-2.07A(4)(a) General <\/td>\n<\/tr>\n
511<\/td>\n39-2.07A(4)(b) Quality Control
39-2.07A(4)(c) Department Acceptance
39-2.07B Materials
39-2.07B(1) General
39-2.07B(2) Minor Hot Mix Asphalt Mix Design
39-2.07B(3) Asphalt Binder
39-2.07B(4) Liquid Antistrip Treatment
39-2.07C Construction
39-2.07D Payment
39-2.08\u201339-2.10 RESERVED
39-3.01 GENERAL
39-3.01A General
39-3.01B Materials
39-3.01C Construction
39-3.01D Payment <\/td>\n<\/tr>\n
512<\/td>\n39-3.02 REPLACE ASPHALT CONCRETE SURFACING
39-3.02A General
39-3.02B Materials
39-3.02C Construction
39-3.02D Payment
39-3.03 REMOVE ASPHALT CONCRETE DIKES
39-3.03A General
39-3.03B Materials
39-3.03C Construction
39-3.03D Payment
39-3.04 COLD PLANING ASPHALT CONCRETE PAVEMENT
39-3.04A General
39-3.04B Materials
39-3.04C Construction
39-3.04C(1) General <\/td>\n<\/tr>\n
513<\/td>\n39-3.04C(2) Grade Control and Surface Smoothness
39-3.04C(3) Planed Material
39-3.04C(4) Temporary HMA Tapers
39-3.04D Payment
39-3.05 REMOVE BASE AND SURFACING
39-3.05A General
39-3.05B Materials <\/td>\n<\/tr>\n
514<\/td>\n39-3.05C Construction
39-3.05D Payment
39-3.06\u201339-3.08 RESERVED <\/td>\n<\/tr>\n
515<\/td>\n40 CONCRETE PAVEMENT
40-1.01 GENERAL
40-1.01A Summary
40-1.01B Definitions
40-1.01C Submittals
40-1.01C(1) General
40-1.01C(2) Certificates of Compliance
40-1.01C(3) Quality Control Plan
40-1.01C(4) Mix Design
40-1.01C(5) Just-In-Time Training <\/td>\n<\/tr>\n
516<\/td>\n40-1.01C(6) Concrete Field Qualification
40-1.01C(7) Test Strips
40-1.01C(8) Cores
40-1.01C(9) Coefficient of Thermal Expansion
40-1.01C(10)\u201340-1.01C(15) Reserved
40-1.01D Quality Assurance
40-1.01D(1) General
40-1.01D(2) Just-In-Time Training
40-1.01D(3) Quality Control Plan <\/td>\n<\/tr>\n
517<\/td>\n40-1.01D(4) Qualifications
40-1.01D(5) Mix Designs
40-1.01D(6) Test Strips <\/td>\n<\/tr>\n
518<\/td>\n40-1.01D(7) Quality Control
40-1.01D(7)(a) General <\/td>\n<\/tr>\n
519<\/td>\n40-1.01D(7)(b) Concrete Field Qualification
40-1.01D(7)(c)\u201340-1.01D(7)(h) Reserved
40-1.01D(8) Department Acceptance
40-1.01D(8)(a) General
40-1.01D(8)(b) Verification Testing
40-1.01D(8)(b)(i) General
40-1.01D(8)(b)(ii) Air Content <\/td>\n<\/tr>\n
520<\/td>\n40-1.01D(8)(c) Acceptance Testing
40-1.01D(8)(c)(i) General <\/td>\n<\/tr>\n
522<\/td>\n40-1.01D(8)(c)(ii) Dowel and Tie Bar Placement
40-1.01D(8)(c)(iii) Pavement Smoothness
40-1.01D(8)(c)(iv) Thickness <\/td>\n<\/tr>\n
523<\/td>\n40-1.01D(8)(c)(v)\u201340-1.01D(8)(c)(viii) Reserved
40-1.02 MATERIALS
40-1.02A General
40-1.02B Concrete
40-1.02B(1) General
40-1.02B(2) Cementitious Material
40-1.02B(3) Aggregate
40-1.02B(4) Air Entrainment
40-1.02B(5)\u201340-1.02B(8) Reserved
40-1.02C Reinforcement, Bars, and Baskets
40-1.02C(1) General
40-1.02C(2) Bar Reinforcement <\/td>\n<\/tr>\n
524<\/td>\n40-1.02C(3) Dowel Bars
40-1.02C(4) Tie Bars
40-1.02C(5) Dowel and Tie Bar Baskets <\/td>\n<\/tr>\n
525<\/td>\n40-1.02D Dowel Bar Lubricant
40-1.02E Joint Filler
40-1.02F Nonshrink Hydraulic-Cement Grout
40-1.02G\u201340-1.02N Reserved
40-1.03 CONSTRUCTION
40-1.03A General
40-1.03B Joints
40-1.03B(1) General <\/td>\n<\/tr>\n
526<\/td>\n40-1.03B(2) Construction Joints
40-1.03B(3) Contraction Joints
40-1.03B(4) Isolation Joints
40-1.03C Bar Reinforcement
40-1.03D Dowel Bar Placement <\/td>\n<\/tr>\n
527<\/td>\n40-1.03E Tie Bar Placement <\/td>\n<\/tr>\n
528<\/td>\n40-1.03F Placing Concrete
40-1.03F(1) General
40-1.03F(2) Paving Adjacent to Existing Concrete Pavement
40-1.03F(3) Concrete Pavement Transition Panel
40-1.03F(4) Stationary Side-Form Construction <\/td>\n<\/tr>\n
529<\/td>\n40-1.03F(5) Slip form Construction
40-1.03G Edge Treatment <\/td>\n<\/tr>\n
530<\/td>\n40-1.03H Finishing
40-1.03H(1) General
40-1.03H(2) Preliminary Finishing
40-1.03H(2)(a) General
40-1.03H(2)(b) Stationary Side Form Finishing
40-1.03H(2)(c) Slip form Finishing
40-1.03H(3) Final Finishing <\/td>\n<\/tr>\n
531<\/td>\n40-1.03I Curing
40-1.03J Protecting Concrete Pavement
40-1.03K Early Use of Concrete Pavement
40-1.03L Reserved
40-1.03M Drilling Cores <\/td>\n<\/tr>\n
532<\/td>\n40-1.03N Correcting Noncompliant Pavement Work
40-1.03N(1) General
40-1.03N(2) Spall and Ravel Repair
40-1.03N(3) Crack Repair
40-1.03O Smoothness and Friction Correction <\/td>\n<\/tr>\n
533<\/td>\n40-1.03P\u201340-1.03U Reserved
40-1.04 PAYMENT
40-2.01 GENERAL
40-2.01A Summary
40-2.01B Definitions
40-2.01C Submittals
40-2.01D Quality Assurance
40-2.02 MATERIALS
40-2.02A General <\/td>\n<\/tr>\n
534<\/td>\n40-2.02B Transverse Bar Assembly
40-2.02C Wide Flange Beam
40-2.02D Joints
40-2.03 CONSTRUCTION
40-2.03A General
40-2.03B Bar Reinforcement
40-2.03C Construction Joints
40-2.03D Wide-Flange Beams
40-2.03E Correcting Noncompliant Pavement Work
40-2.03E(1) General
40-2.03E(2) Partial Depth Repair <\/td>\n<\/tr>\n
535<\/td>\n40-2.03E(3) Full-Depth Repair
40-2.03E(3)(a) General
40-2.03E(3)(b) Transverse Cracks
40-2.03E(3)(c) Longitudinal Cracks
40-2.03F Reserved
40-2.04 PAYMENT
40-4.01 GENERAL
40-4.01A Summary
40-4.01B Definitions
40-4.01C Submittals
40-4.01D Quality Assurance
40-4.02 MATERIALS <\/td>\n<\/tr>\n
536<\/td>\n40-4.03 CONSTRUCTION
40-4.03A General
40-4.03B Correcting Noncompliant Pavement Work
40-4.03C\u201340-4.03G Reserved
40-4.04 PAYMENT <\/td>\n<\/tr>\n
537<\/td>\n41 EXISTING CONCRETE PAVEMENT
41-1.01 GENERAL
41-1.01A General
41-1.01B Definitions
41-1.01C Submittals
41-1.01D Quality Assurance
41-1.02 MATERIALS
41-1.02A General
41-1.02B Fast-Setting Concrete <\/td>\n<\/tr>\n
538<\/td>\n41-1.02C Polyester Concrete <\/td>\n<\/tr>\n
540<\/td>\n41-1.02D Bonding Agent
41-1.02E Temporary Pavement Structure
41-1.02F Reserved
41-1.03 CONSTRUCTION
41-1.03A General
41-1.03B Mixing and Applying Bonding Agent
41-1.03C Mixing Concrete
41-1.03C(1) General <\/td>\n<\/tr>\n
541<\/td>\n41-1.03C(2) Polyester Concrete
41-1.03D Placing Concrete
41-1.03E Curing Concrete
41-1.03F Reserved
41-1.04 PAYMENT
41-2.01 GENERAL
41-2.01A Summary
41-2.01B Definitions
41-2.01C Submittals <\/td>\n<\/tr>\n
542<\/td>\n41-2.01D Quality Assurance
41-2.01D(1) General
41-2.01D(2) Quality Control
41-2.01D(3) Department Acceptance
41-2.02 MATERIALS
41-2.02A General
41-2.02B Grout
41-2.02C Mortar
41-2.02D Reserved
41-2.03 CONSTRUCTION
41-2.03A General
41-2.03B Injecting Grout
41-2.03B(1) General <\/td>\n<\/tr>\n
543<\/td>\n41-2.03B(2) Subsealing
41-2.03B(3) Jacking
41-2.03C Finishing
41-2.03D Tolerances
41-2.04 PAYMENT <\/td>\n<\/tr>\n
544<\/td>\n41-3.01 GENERAL
41-3.01A Summary
41-3.01B Definitions
41-3.01C Submittals
41-3.01C(1) General
41-3.01C(2) Public Safety and Application Plans
41-3.01C(3) Reserved
41-3.01D Quality Assurance
41-3.01D(1) General <\/td>\n<\/tr>\n
545<\/td>\n41-3.01D(2) Test Area
41-3.01D(3) Department Acceptance
41-3.02 MATERIALS
41-3.03 CONSTRUCTION <\/td>\n<\/tr>\n
546<\/td>\n41-3.04 PAYMENT
41-4.01 GENERAL
41-4.01A Summary
41-4.01B Definitions
41-4.01C Submittals
41-4.01D Quality Assurance
41-4.02 MATERIALS
41-4.03 CONSTRUCTION
41-4.03A General <\/td>\n<\/tr>\n
547<\/td>\n41-4.03B Remove Pavement
41-4.03C Cleaning
41-4.03D Compression Relief at Joints and Cracks
41-4.03D(1) General
41-4.03D(2) Form Board Installation
41-4.03D(3) Saw Cut Method
41-4.03E\u201341-4.03H Reserved
41-4.04 PAYMENT <\/td>\n<\/tr>\n
548<\/td>\n41-5.01 GENERAL
41-5.01A Summary
41-5.01B Definitions
41-5.01C Submittals
41-5.01D Quality Assurance
41-5.01D(1) General
41-5.01D(2) Department Acceptance
41-5.02 MATERIALS
41-5.02A General
41-5.02B Silicone Joint Sealant
41-5.02C Asphalt Rubber Joint Sealant
41-5.02D Backer Rods <\/td>\n<\/tr>\n
549<\/td>\n41-5.02E Preformed Compression Joint Seals
41-5.02F\u201341-5.02K Reserved
41-5.03 CONSTRUCTION
41-5.03A General
41-5.03B Joint Cleaning
41-5.03B(1) General
41-5.03B(2) Removing Debris
41-5.03B(3) Drying
41-5.03B(4) Sandblasting
41-5.03B(5) Air Blasting
41-5.03B(6) Vacuuming <\/td>\n<\/tr>\n
550<\/td>\n41-5.03B(7) Reserved
41-5.03C Installing Liquid Joint Sealant
41-5.03D Installing Preformed Compression Joint Seals
41-5.03E Reserved
41-5.04 PAYMENT
41-7.01 GENERAL <\/td>\n<\/tr>\n
551<\/td>\n41-7.02 MATERIALS
41-7.03 CONSTRUCTION
41-7.04 PAYMENT
41-9.01 GENERAL
41-9.01A Summary
41-9.01B Definitions
41-9.01C Submittals
41-9.01C(1) General <\/td>\n<\/tr>\n
552<\/td>\n41-9.01C(2) Quality Control Plan
41-9.01C(3) Mix Design <\/td>\n<\/tr>\n
553<\/td>\n41-9.01C(4) Reserved
41-9.01D Quality Assurance
41-9.01D(1) General
41-9.01D(2) Just-In-Time Training
41-9.01D(3) Preconstruction Meeting
41-9.01D(4) Trial Slabs <\/td>\n<\/tr>\n
554<\/td>\n41-9.01D(5) Quality Control
41-9.01D(5)(a) General
41-9.01D(5)(b) Rapid Strength Concrete <\/td>\n<\/tr>\n
555<\/td>\n41-9.01D(5)(c) Modulus of Rupture
41-9.01D(6) Department Acceptance
41-9.01D(6)(a) General
41-9.01D(6)(b) Modulus of Rupture <\/td>\n<\/tr>\n
556<\/td>\n41-9.01D(6)(c) Concrete Pavement Smoothness
41-9.01D(6)(d) Cracking and Raveling
41-9.01D(6)(e) Reserved
41-9.02 MATERIALS
41-9.02A General
41-9.02B Rapid Strength Concrete
41-9.02C Dowel Bars
41-9.02D\u201341-9.02E Reserved
41-9.03 CONSTRUCTION
41-9.03A General
41-9.03B Removing Existing Pavement
41-9.03C Placing Dowel Bars <\/td>\n<\/tr>\n
557<\/td>\n41-9.03D Placing Rapid Strength Concrete
41-9.03E Joints
41-9.03E(1) General
41-9.03E(2) Construction Joints
41-9.03E(3) Contraction Joints
41-9.03F Final Finishing <\/td>\n<\/tr>\n
558<\/td>\n41-9.03G Temporary Pavement Structure
41-9.03H Noncompliant Individual Slab Replacement
41-9.03I Replace Pavement Delineation
41-9.03J Reserved
41-9.04 PAYMENT
41-10.01 GENERAL
41-10.01A Summary
41-10.01B Definitions <\/td>\n<\/tr>\n
559<\/td>\n41-10.01C Submittals
41-10.01D Quality Assurance
41-10.01D(1) General
41-10.01D(2) Quality Control
41-10.01D(3) Department Acceptance
41-10.01D(4) Reserved
41-10.02 MATERIALS
41-10.02A General
41-10.02B Reserved
41-10.03 CONSTRUCTION
41-10.03A General <\/td>\n<\/tr>\n
560<\/td>\n41-10.03B Tie Bar Tolerance
41-10.03C Dowel Bar Tolerance
41-10.03D Reserved
41-10.04 PAYMENT
41-11.01 GENERAL
41-11.02 MATERIALS
41-11.03 CONSTRUCTION
41-11.03A General
41-11.03B Remove Concrete Pavement <\/td>\n<\/tr>\n
561<\/td>\n41-11.03C Remove Base
41-11.04 PAYMENT <\/td>\n<\/tr>\n
563<\/td>\n42 GROOVE AND GRIND CONCRETE
42-1.01 GENERAL
42-1.02 MATERIALS
42-1.03 CONSTRUCTION
42-1.04 PAYMENT
42-2.01 GENERAL
42-2.01A Summary
42-2.01B Definitions
42-2.01C Submittals
42-2.01D Quality Assurance
42-2.01D(1) General
42-2.01D(2) Department Acceptance
42-2.02 MATERIALS
42-2.03 CONSTRUCTION <\/td>\n<\/tr>\n
564<\/td>\n42-2.04 PAYMENT
42-3.01 GENERAL
42-3.01A Summary
42-3.01B Definitions
42-3.01C Submittals
42-3.01D Quality Assurance
42-3.01D(1) General
42-3.01D(2) Quality Control
42-3.01D(3) Department Acceptance
42-3.02 MATERIALS
42-3.03 CONSTRUCTION
42-3.03A General <\/td>\n<\/tr>\n
565<\/td>\n42-3.03B Pavement
42-3.03C Bridge Decks, Approach Slabs, and Approach Pavement
42-3.04 PAYMENT
43\u201344 RESERVED <\/td>\n<\/tr>\n
567<\/td>\nDIVISION VI STRUCTURES
45 GENERAL
45-1.01 GENERAL
45-1.02 MATERIALS
45-1.03 CONSTRUCTION
45-1.04 PAYMENT <\/td>\n<\/tr>\n
569<\/td>\n46 GROUND ANCHORS AND SOIL NAILS
46-1.01 GENERAL
46-1.01A Summary
46-1.01B Definitions
46-1.01C Submittals
46-1.01C(1) General
46-1.01C(2) Shop Drawings
46-1.01C(2)(a) General
46-1.01C(2)(b) Ground Anchor Shop Drawings
46-1.01C(2)(c) Soil Nail Shop Drawings <\/td>\n<\/tr>\n
570<\/td>\n46-1.01C(3) Test Data
46-1.01D Quality Assurance
46-1.01D(1) General
46-1.01D(2) Quality Control
46-1.01D(2)(a) General
46-1.01D(2)(b) Load Testing
46-1.01D(2)(b)(i) General
46-1.01D(2)(b)(ii) Jacking Equipment and Calibration
46-1.01D(2)(b)(iii) Measuring Movements <\/td>\n<\/tr>\n
571<\/td>\n46-1.01D(2)(b)(iv) Procedure
46-1.01D(3) Department Acceptance
46-1.02 MATERIALS
46-1.02A General
46-1.02B Sheathing
46-1.02C Grout
46-1.03 CONSTRUCTION
46-1.03A General
46-1.03B Drilling <\/td>\n<\/tr>\n
572<\/td>\n46-1.03C Installation
46-1.03D Grouting
46-1.03E Research Investigation
46-1.04 PAYMENT
46-2.01 GENERAL
46-2.01A Summary
46-2.01B Definitions <\/td>\n<\/tr>\n
573<\/td>\n46-2.01C Submittals
46-2.01D Quality Assurance
46-2.01D(1) General
46-2.01D(2) Quality Control
46-2.01D(2)(a) General
46-2.01D(2)(b) Load Testing
46-2.01D(2)(b)(i) General
46-2.01D(2)(b)(ii) Test Procedure <\/td>\n<\/tr>\n
574<\/td>\n46-2.01D(3) Department Acceptance
46-2.01D(3)(a) General
46-2.01D(3)(b) Load Testing
46-2.01D(3)(b)(i) General
46-2.01D(3)(b)(ii) Acceptance Criteria <\/td>\n<\/tr>\n
575<\/td>\n46-2.02 MATERIALS
46-2.02A General
46-2.02B Steel
46-2.02C Sheathing
46-2.02C(1) General
46-2.02C(2) Smooth Plastic Sheathing
46-2.02C(3) Corrugated Plastic Sheathing
46-2.02D Strand Coating and Encapsulation <\/td>\n<\/tr>\n
576<\/td>\n46-2.02E Grout
46-2.03 CONSTRUCTION
46-2.03A General <\/td>\n<\/tr>\n
577<\/td>\n46-2.03B Bar Tendons
46-2.03C Strand Tendons
46-2.03D Lock-off <\/td>\n<\/tr>\n
578<\/td>\n46-2.04 PAYMENT
46-3.01 GENERAL
46-3.01A Summary
46-3.01B Definitions
46-3.01C Submittals
46-3.01C(1) General
46-3.01C(2) Test Boring Report
46-3.01D Quality Assurance
46-3.01D(1) General
46-3.01D(2) Quality Control
46-3.01D(2)(a) General <\/td>\n<\/tr>\n
579<\/td>\n46-3.01D(2)(b) Load Testing
46-3.01D(2)(b)(i) General
46-3.01D(2)(b)(ii) Test Procedure
46-3.01D(2)(b)(ii)(1) General
46-3.01D(2)(b)(ii)(2) Verification Test <\/td>\n<\/tr>\n
580<\/td>\n46-3.01D(2)(b)(ii)(3) Proof Test <\/td>\n<\/tr>\n
581<\/td>\n46-3.01D(2)(b)(ii)(4) Supplemental Test
46-3.01D(2)(c) Grout
46-3.01D(3) Department Acceptance
46-3.01D(3)(a) General
46-3.01D(3)(b) Load Testing
46-3.01D(3)(b)(i) General
46-3.01D(3)(b)(ii) Acceptance Criteria <\/td>\n<\/tr>\n
582<\/td>\n46-3.02 MATERIALS
46-3.02A General
46-3.02B Steel
46-3.02C Bar Reinforcement
46-3.02D Sheathing
46-3.02E Grout
46-3.03 CONSTRUCTION
46-3.03A General <\/td>\n<\/tr>\n
583<\/td>\n46-3.03B Test Soil Nails
46-3.03C Installation
46-3.04 PAYMENT <\/td>\n<\/tr>\n
585<\/td>\n47 EARTH RETAINING SYSTEMS
47-1.01 GENERAL
47-1.02 MATERIALS
47-1.03 CONSTRUCTION
47-1.04 PAYMENT
47-2.01 GENERAL
47-2.01A Summary
47-2.01B Definitions
47-2.01C Submittals
47-2.01D Quality Assurance
47-2.01D(1) General
47-2.01D(2) Quality Control
47-2.02 MATERIAL
47-2.02A General <\/td>\n<\/tr>\n
586<\/td>\n47-2.02B Face Panels
47-2.02C Structure Backfill <\/td>\n<\/tr>\n
587<\/td>\n47-2.02D Permeable Material <\/td>\n<\/tr>\n
588<\/td>\n47-2.02E Soil Reinforcement
47-2.03 CONSTRUCTION
47-2.03A General
47-2.03B Earthwork
47-2.03B(1) General <\/td>\n<\/tr>\n
589<\/td>\n47-2.03B(2) Soil Reinforcement
47-2.03B(3) Face Panels
47-2.03C Filter Fabric <\/td>\n<\/tr>\n
590<\/td>\n47-2.03D Leveling Pads
47-2.04 PAYMENT
47-3.01 GENERAL
47-3.02 MATERIALS
47-3.02A General
47-3.02B Crib Members
47-3.02B(1) General
47-3.02B(2) Reinforcement <\/td>\n<\/tr>\n
591<\/td>\n47-3.02B(3) Concrete
47-3.03 CONSTRUCTION
47-3.04 PAYMENT
47-5.01 GENERAL
47-5.02 MATERIALS
47-5.03 CONSTRUCTION <\/td>\n<\/tr>\n
592<\/td>\n47-5.04 PAYMENT
47-6.01 GENERAL
47-6.01A Summary
47-6.01B Definitions
47-6.01C Submittals
47-6.01C(1) General
47-6.01C(2) Shop Drawings
47-6.01C(3) Certificates
47-6.01D Quality Assurance <\/td>\n<\/tr>\n
593<\/td>\n47-6.02 MATERIALS
47-6.03 CONSTRUCTION
47-6.04 PAYMENT <\/td>\n<\/tr>\n
595<\/td>\n48 TEMPORARY STRUCTURES
48-1.01 GENERAL
48-1.02 MATERIALS
48-1.03 CONSTRUCTION
48-1.04 PAYMENT
48-2.01 GENERAL
48-2.01A Summary
48-2.01B Definitions
48-2.01C Submittals
48-2.01C(1) General <\/td>\n<\/tr>\n
596<\/td>\n48-2.01C(2) Shop Drawings <\/td>\n<\/tr>\n
597<\/td>\n48-2.01D Quality Assurance
48-2.01D(1) General
48-2.01D(2) Welding and Nondestructive Testing
48-2.02 MATERIALS
48-2.02A General
48-2.02B Design Criteria
48-2.02B(1) General <\/td>\n<\/tr>\n
598<\/td>\n48-2.02B(2) Loads <\/td>\n<\/tr>\n
599<\/td>\n48-2.02B(3) Stresses, Loadings, and Deflections
48-2.02B(3)(a) General
48-2.02B(3)(b) Timber <\/td>\n<\/tr>\n
600<\/td>\n48-2.02B(3)(c) Steel
48-2.02B(3)(d) Manufactured Assemblies
48-2.02B(4) Special Locations <\/td>\n<\/tr>\n
601<\/td>\n48-2.03 CONSTRUCTION
48-2.03A General
48-2.03B Foundations <\/td>\n<\/tr>\n
602<\/td>\n48-2.03C Erection
48-2.03D Removal <\/td>\n<\/tr>\n
603<\/td>\n48-2.03E Falsework Lighting
48-2.03E(1) General <\/td>\n<\/tr>\n
604<\/td>\n48-2.03E(2) Pavement Illumination
48-2.03E(3) Portal Illumination
48-2.03E(4) Pedestrian Walkway Illumination
48-2.04 PAYMENT
48-3.01 GENERAL
48-3.01A Summary <\/td>\n<\/tr>\n
605<\/td>\n48-3.01B Definitions
48-3.01C Submittals
48-3.01C(1) General
48-3.01C(2) Shop Drawings
48-3.01D Quality Assurance
48-3.01D(1) General <\/td>\n<\/tr>\n
606<\/td>\n48-3.01D(2) Displacement Monitoring
48-3.02 MATERIALS
48-3.02A General
48-3.02B Design Criteria <\/td>\n<\/tr>\n
607<\/td>\n48-3.03 CONSTRUCTION
48-3.04 PAYMENT <\/td>\n<\/tr>\n
608<\/td>\n48-4.01 GENERAL
48-4.01A Summary
48-4.01B Definitions
48-4.01C Submittals
48-4.01D Quality Assurance
48-4.02 MATERIALS
48-4.03 CONSTRUCTION <\/td>\n<\/tr>\n
609<\/td>\n48-4.04 PAYMENT
48-5.01 GENERAL
48-5.01A Summary
48-5.01B Definitions
48-5.01C Submittals <\/td>\n<\/tr>\n
610<\/td>\n48-5.01D Quality Assurance
48-5.01D(1) General
48-5.01D(2) Displacement Monitoring
48-5.02 MATERIALS
48-5.02A General
48-5.02B Design Criteria
48-5.03 CONSTRUCTION <\/td>\n<\/tr>\n
611<\/td>\n48-5.04 PAYMENT <\/td>\n<\/tr>\n
613<\/td>\n49 PILING
49-1.01 GENERAL
49-1.01A Summary
49-1.01B Definitions
49-1.01C Submittals
49-1.01C(1) General
49-1.01C(2) Test Borings
49-1.01D Quality Assurance
49-1.01D(1) General
49-1.01D(2) Determination of Length <\/td>\n<\/tr>\n
614<\/td>\n49-1.01D(3) Load Test Piles <\/td>\n<\/tr>\n
615<\/td>\n49-1.01D(4) Dynamic Monitoring
49-1.01D(5) Test Borings <\/td>\n<\/tr>\n
616<\/td>\n49-1.02 MATERIALS
49-1.03 CONSTRUCTION
49-1.04 PAYMENT
49-2.01 GENERAL
49-2.01A General
49-2.01A(1) Summary <\/td>\n<\/tr>\n
617<\/td>\n49-2.01A(2) Definitions
49-2.01A(3) Submittals
49-2.01A(3)(a) General
49-2.01A(3)(b) Driving System Submittal <\/td>\n<\/tr>\n
618<\/td>\n49-2.01A(4) Quality Assurance
49-2.01A(4)(a) General
49-2.01A(4)(b) Quality Control
49-2.01A(4)(c) Department Acceptance
49-2.01B Materials
49-2.01C Construction
49-2.01C(1) General
49-2.01C(2) Driving Equipment <\/td>\n<\/tr>\n
619<\/td>\n49-2.01C(3) Drilling
49-2.01C(4) Predrilled Holes
49-2.01C(5) Driving
49-2.01C(6) Pile Cutoff
49-2.01D Payment
49-2.02 STEEL PIPE PILING
49-2.02A General
49-2.02A(1) Summary
49-2.02A(2) Definitions <\/td>\n<\/tr>\n
620<\/td>\n49-2.02A(3) Submittals
49-2.02A(3)(a) General
49-2.02A(3)(b) Shop Drawings
49-2.02A(3)(c) Inspection Request Form
49-2.02A(3)(d) Certificate of Compliance
49-2.02A(4) Quality Assurance
49-2.02A(4)(a) General
49-2.02A(4)(b) Quality Control
49-2.02A(4)(b)(i) General
49-2.02A(4)(b)(ii) Plant Audit
49-2.02A(4)(b)(iii) Nondestructive Testing
49-2.02A(4)(b)(iii)(A) General
49-2.02A(4)(b)(iii)(B) Shop Welds <\/td>\n<\/tr>\n
621<\/td>\n49-2.02A(4)(b)(iii)(C) Field Welds
49-2.02A(4)(c) Department Acceptance
49-2.02B Materials
49-2.02B(1) General
49-2.02B(1)(a) General <\/td>\n<\/tr>\n
622<\/td>\n49-2.02B(1)(b) Circumferential Welds
49-2.02B(1)(c) Tolerances
49-2.02B(1)(d) Markings <\/td>\n<\/tr>\n
623<\/td>\n49-2.02B(1)(e) Substitutions
49-2.02B(2) Class N Steel Pipe Piling
49-2.02B(3) Class R Steel Pipe Piling
49-2.02C Construction
49-2.02C(1) General
49-2.02C(2) Field Welds <\/td>\n<\/tr>\n
624<\/td>\n49-2.02D Payment
49-2.03 STRUCTURAL SHAPE STEEL PILING
49-2.03A General
49-2.03A(1) Summary
49-2.03A(2) Definitions
49-2.03A(3) Submittals
49-2.03A(4) Quality Assurance
49-2.03B Materials
49-2.03C Construction
49-2.03D Payment
49-2.04 PRECAST PRESTRESSED CONCRETE PILING
49-2.04A General
49-2.04A(1) Summary
49-2.04A(2) Definitions
49-2.04A(3) Submittals <\/td>\n<\/tr>\n
625<\/td>\n49-2.04A(4) Quality Assurance
49-2.04B Materials
49-2.04B(1) General
49-2.04B(2) Fabrication
49-2.04B(3) Substitutions
49-2.04C Construction
49-2.04C(1) General
49-2.04C(2) Handling
49-2.04C(3) Splicing Precast Prestressed Concrete Piles <\/td>\n<\/tr>\n
626<\/td>\n49-2.04D Payment
49-2.05 STEEL SHEET PILING
49-2.05A General
49-2.05B Materials
49-2.05C Construction
49-2.05D Payment
49-3.01 GENERAL
49-3.01A General
49-3.01B Materials
49-3.01B(1) General
49-3.01B(2) Mass Concrete <\/td>\n<\/tr>\n
627<\/td>\n49-3.01C Construction
49-3.01D Payment
49-3.02 CAST-IN-DRILLED-HOLE CONCRETE PILING
49-3.02A General
49-3.02A(1) Summary
49-3.02A(2) Definitions
49-3.02A(3) Submittals
49-3.02A(3)(a) General
49-3.02A(3)(b) Pile Installation Plan <\/td>\n<\/tr>\n
628<\/td>\n49-3.02A(3)(c) Inspection Pipe Coupler Log
49-3.02A(3)(d) Concrete Placement Log
49-3.02A(3)(e) Coring Logs and Concrete Cores
49-3.02A(3)(f) Testing Report
49-3.02A(3)(g) Mitigation Plans <\/td>\n<\/tr>\n
629<\/td>\n49-3.02A(3)(h) Mitigation Report
49-3.02A(3)(i) Plastic Spacer Manufacturer’s Data and Sample
49-3.02A(4) Quality Assurance
49-3.02A(4)(a) General
49-3.02A(4)(b) Preconstruction Meeting <\/td>\n<\/tr>\n
630<\/td>\n49-3.02A(4)(c) Quality Control
49-3.02A(4)(d) Department Acceptance
49-3.02A(4)(d)(i) General
49-3.02A(4)(d)(ii) Gamma-Gamma Logging
49-3.02A(4)(d)(iii) Rejected Piles <\/td>\n<\/tr>\n
631<\/td>\n49-3.02B Materials
49-3.02B(1) General
49-3.02B(2) Concrete <\/td>\n<\/tr>\n
632<\/td>\n49-3.02B(3) Aggregate Gradation
49-3.02B(4) Permanent Steel Casings
49-3.02B(5) Grout
49-3.02B(6) Slurry
49-3.02B(6)(a) General
49-3.02B(6)(b) Mineral Slurry <\/td>\n<\/tr>\n
633<\/td>\n49-3.02B(6)(c) Synthetic Slurry <\/td>\n<\/tr>\n
634<\/td>\n49-3.02B(6)(d) Water Slurry
49-3.02B(7) Reserved
49-3.02B(8) Spacers
49-3.02B(9)\u201349-3.02B(10) Reserved
49-3.02C Construction
49-3.02C(1) General
49-3.02C(2) Drilled Holes <\/td>\n<\/tr>\n
635<\/td>\n49-3.02C(3) Temporary Steel Casings
49-3.02C(4) Reinforcement
49-3.02C(5) Vertical Inspection Pipes <\/td>\n<\/tr>\n
636<\/td>\n49-3.02C(6) Permanent Steel Casing Installation <\/td>\n<\/tr>\n
637<\/td>\n49-3.02C(7) Construction Joint
49-3.02C(8) Placing Concrete
49-3.02C(9) Placing Concrete Under Slurry <\/td>\n<\/tr>\n
638<\/td>\n49-3.02D Payment
49-3.03 DRIVEN STEEL SHELLS FILLED WITH CONCRETE AND REINFORCEMENT
49-3.03A General
49-3.03A(1) Summary <\/td>\n<\/tr>\n
639<\/td>\n49-3.03A(2) Definitions
49-3.03A(3) Submittals
49-3.03A(4) Quality Assurance
49-3.03B Materials
49-3.03C Construction
49-3.03C(1) General
49-3.03C(2) Open-Ended Steel Shells <\/td>\n<\/tr>\n
640<\/td>\n49-3.03C(3) Close-Ended Steel Shells
49-3.03D Payment
49-4.01 GENERAL
49-4.02 MATERIALS
49-4.03 CONSTRUCTION
49-4.03A General
49-4.03B Drilled Holes
49-4.04 PAYMENT <\/td>\n<\/tr>\n
641<\/td>\n50 PRESTRESSING CONCRETE
50-1.01 GENERAL
50-1.01A Summary
50-1.01B Definitions
50-1.01C Submittals
50-1.01C(1) General
50-1.01C(2) Certifications
50-1.01C(3) Shop Drawings <\/td>\n<\/tr>\n
642<\/td>\n50-1.01C(4) Alternative Prestressing Systems for Cast-In-Place Prestressed Box Girder Bridges
50-1.01C(5) Test Samples <\/td>\n<\/tr>\n
643<\/td>\n50-1.01C(6) Grouting Plan
50-1.01C(7) Daily Grouting Report
50-1.01D Quality Assurance
50-1.01D(1) General
50-1.01D(2) Quality Control
50-1.01D(2)(a) General <\/td>\n<\/tr>\n
644<\/td>\n50-1.01D(2)(b) Equipment and Calibration
50-1.01D(2)(c) Pressure Testing Ducts
50-1.01D(2)(d) Duct Demonstrations for Post-Tensioned Members <\/td>\n<\/tr>\n
645<\/td>\n50-1.01D(2)(e) Void Investigation
50-1.01D(2)(f) Personnel Qualifications
50-1.01D(3) Department Acceptance
50-1.02 MATERIALS
50-1.02A General
50-1.02B Prestressing Steel <\/td>\n<\/tr>\n
646<\/td>\n50-1.02C Grout
50-1.02D Ducts <\/td>\n<\/tr>\n
647<\/td>\n50-1.02E Vents
50-1.02F Permanent Grout Caps
50-1.02G Debonding Sheathing
50-1.02H Anchorage System
50-1.03 CONSTRUCTION
50-1.03A General
50-1.03A(1) General <\/td>\n<\/tr>\n
648<\/td>\n50-1.03A(2) Epoxy-Coated Strand
50-1.03A(3) Ducts
50-1.03A(4) Vents
50-1.03B Prestressing
50-1.03B(1) General
50-1.03B(2) Post-Tensioned Members
50-1.03B(2)(a) General <\/td>\n<\/tr>\n
649<\/td>\n50-1.03B(2)(b) Losses
50-1.03B(2)(c) Anchorages and Distribution
50-1.03B(2)(d) Bonding and Grouting
50-1.03B(2)(d)(i) General <\/td>\n<\/tr>\n
650<\/td>\n50-1.03B(2)(d)(ii) Grouting Equipment
50-1.03B(2)(d)(iii) Mixing and Proportioning
50-1.03B(2)(d)(iv) Placing
50-1.03B(2)(d)(v) Weather Conditions
50-1.03B(2)(d)(vi) Curing <\/td>\n<\/tr>\n
651<\/td>\n50-1.03B(2)(d)(vii) Grout Storage
50-1.03B(2)(d)(viii) Blockages
50-1.03B(2)(d)(ix) Secondary Grouting
50-1.03B(2)(d)(x) Vertical Tendon Grouting
50-1.03B(3) Pretensioned Members
50-1.03B(3)(a) General <\/td>\n<\/tr>\n
652<\/td>\n50-1.03B(3)(b) Debonding Prestressing Strands
50-1.04 PAYMENT <\/td>\n<\/tr>\n
653<\/td>\n51 CONCRETE STRUCTURES
51-1.01 GENERAL
51-1.01A Summary
51-1.01B Definitions
51-1.01C Submittals
51-1.01C(1) General
51-1.01C(2) Permanent Steel Deck Forms <\/td>\n<\/tr>\n
654<\/td>\n51-1.01C(3) Bonding Materials
51-1.01C(4) Rapid Strength Concrete
51-1.01C(5) Chemical Adhesives
51-1.01C(6) Colored Concrete
51-1.01C(7) Hinge Tiedowns
51-1.01D Quality Assurance
51-1.01D(1) General
51-1.01D(2) Quality Control
51-1.01D(2)(a) General
51-1.01D(2)(b) Rapid Strength Concrete <\/td>\n<\/tr>\n
655<\/td>\n51-1.01D(2)(c) Test Panels
51-1.01D(3) Department Acceptance
51-1.01D(3)(a) General
51-1.01D(3)(b) Testing Concrete Surfaces
51-1.01D(3)(b)(i) General
51-1.01D(3)(b)(ii) Surface Smoothness <\/td>\n<\/tr>\n
656<\/td>\n51-1.01D(3)(b)(iii) Coefficient of Friction
51-1.01D(3)(b)(iv) Crack Intensity
51-1.02 MATERIALS
51-1.02A General
51-1.02B Concrete <\/td>\n<\/tr>\n
657<\/td>\n51-1.02C Bonding Materials
51-1.02D Rapid Strength Concrete <\/td>\n<\/tr>\n
658<\/td>\n51-1.02E Colored Concrete
51-1.02F Mortar
51-1.02G Grout
51-1.02H Chemical Adhesives
51-1.02I Miscellaneous Metal
51-1.02J Miscellaneous Materials
51-1.03 CONSTRUCTION
51-1.03A General
51-1.03B Methods and Equipment <\/td>\n<\/tr>\n
659<\/td>\n51-1.03C Preparation
51-1.03C(1) General
51-1.03C(2) Forms
51-1.03C(2)(a) General <\/td>\n<\/tr>\n
660<\/td>\n51-1.03C(2)(b) Removing Forms
51-1.03C(2)(c) Permanent Steel Deck Forms
51-1.03C(2)(c)(i) General <\/td>\n<\/tr>\n
661<\/td>\n51-1.03C(2)(c)(ii) Design Requirements
51-1.03C(2)(c)(iii) Installation
51-1.03D Placing Concrete
51-1.03D(1) General <\/td>\n<\/tr>\n
662<\/td>\n51-1.03D(2) Concrete Bridge Decks
51-1.03D(3) Concrete Placed Under Water <\/td>\n<\/tr>\n
663<\/td>\n51-1.03D(4) Construction Joints
51-1.03D(5) Colored Concrete
51-1.03D(6) Bearing Surfaces <\/td>\n<\/tr>\n
664<\/td>\n51-1.03D(7) Pier Columns
51-1.03E Miscellaneous Construction
51-1.03E(1) General
51-1.03E(2) Placing Mortar
51-1.03E(3) Drill and Bond Dowels
51-1.03E(4) Drill and Grout Dowels <\/td>\n<\/tr>\n
665<\/td>\n51-1.03E(5) Drill and Bond Dowels (Chemical Adhesive)
51-1.03E(6) Nonskid Abrasive Finish
51-1.03E(7) Drains in Walls
51-1.03E(8) Deck Bleeder Drains
51-1.03E(9) Utility Facilities <\/td>\n<\/tr>\n
666<\/td>\n51-1.03E(10) Concrete Headers and Steel Plates
51-1.03E(11) Diaphragm Bolsters
51-1.03E(12) Hinge Tiedowns
51-1.03F Finishing Concrete
51-1.03F(1) General
51-1.03F(2) Ordinary Surface Finish
51-1.03F(3) Class 1 Surface Finish <\/td>\n<\/tr>\n
667<\/td>\n51-1.03F(4) Class 2 Surface Finish
51-1.03F(5) Finishing Roadway Surfaces
51-1.03F(5)(a) General <\/td>\n<\/tr>\n
668<\/td>\n51-1.03F(5)(b) Bridge Deck Surface Texture
51-1.03F(5)(b)(i) General
51-1.03F(5)(b)(ii) Grinding and Grooving
51-1.03F(5)(b)(iii) Longitudinal Tining <\/td>\n<\/tr>\n
669<\/td>\n51-1.03F(6) Finishing Pedestrian Overcrossing Surfaces
51-1.03G Concrete Surface Textures
51-1.03G(1) General
51-1.03G(2) Form Liners <\/td>\n<\/tr>\n
670<\/td>\n51-1.03H Curing Concrete Structures <\/td>\n<\/tr>\n
671<\/td>\n51-1.03I Protecting Concrete Structures
51-1.04 PAYMENT
51-2.01 GENERAL
51-2.01A General
51-2.01A(1) Summary
51-2.01A(2) Definitions
51-2.01A(3) Submittals
51-2.01A(4) Quality Assurance
51-2.01B Materials
51-2.01B(1) General
51-2.01B(2) Snowplow Deflectors <\/td>\n<\/tr>\n
672<\/td>\n51-2.01C Construction
51-2.01C(1) General
51-2.01C(2) Snowplow Deflectors
51-2.01D Payment
51-2.02 SEALED JOINTS
51-2.02A General
51-2.02A(1) General
51-2.02A(1)(a) Summary
51-2.02A(1)(b) Definitions <\/td>\n<\/tr>\n
673<\/td>\n51-2.02A(1)(c) Submittals
51-2.02A(1)(d) Quality Assurance
51-2.02A(2) Materials
51-2.02A(3) Construction
51-2.02A(4) Payment
51-2.02B Type A and AL Joint Seals
51-2.02B(1) General
51-2.02B(1)(a) Summary
51-2.02B(1)(b) Definitions
51-2.02B(1)(c) Submittals <\/td>\n<\/tr>\n
674<\/td>\n51-2.02B(1)(d) Quality Assurance
51-2.02B(1)(d)(i) General
51-2.02B(1)(d)(ii) Department Acceptance
51-2.02B(2) Materials
51-2.02B(3) Construction
51-2.02B(3)(a) General
51-2.02B(3)(b) Type A Seal Preparation <\/td>\n<\/tr>\n
675<\/td>\n51-2.02B(3)(c) Type AL Seal Preparation
51-2.02B(4) Payment
51-2.02C Type B Joint Seals
51-2.02C(1) General
51-2.02C(1)(a) Summary
51-2.02C(1)(b) Definitions
51-2.02C(1)(c) Submittals
51-2.02C(1)(d) Quality Assurance
51-2.02C(1)(d)(i) General
51-2.02C(1)(d)(ii) Quality Control
51-2.02C(1)(d)(iii) Department Acceptance
51-2.02C(2) Materials <\/td>\n<\/tr>\n
676<\/td>\n51-2.02C(3) Construction
51-2.02C(4) Payment
51-2.02D Joint Seal Assemblies with a Movement Rating of 4 inches or Less
51-2.02D(1) General
51-2.02D(1)(a) Summary
51-2.02D(1)(b) Definitions
51-2.02D(1)(c) Submittals
51-2.02D(1)(c)(i) General <\/td>\n<\/tr>\n
677<\/td>\n51-2.02D(1)(c)(ii) Shop Drawings
51-2.02D(1)(d) Quality Assurance
51-2.02D(2) Materials
51-2.02D(2)(a) General
51-2.02D(2)(b) Alternative Joint Seal Assemblies <\/td>\n<\/tr>\n
678<\/td>\n51-2.02D(3) Construction
51-2.02D(4) Payment
51-2.02E Joint Seal Assemblies with a Movement Rating Over 4 inches
51-2.02E(1) General
51-2.02E(1)(a) Summary
51-2.02E(1)(b) Definitions
51-2.02E(1)(c) Submittals
51-2.02E(1)(c)(i) General
51-2.02E(1)(c)(ii) Shop Drawings <\/td>\n<\/tr>\n
679<\/td>\n51-2.02E(1)(c)(iii) Certificate of Compliance
51-2.02E(1)(d) Quality Assurance
51-2.02E(1)(d)(i) General
51-2.02E(1)(d)(ii) Quality Control
51-2.02E(1)(d)(iii) Department Acceptance
51-2.02E(2) Materials
51-2.02E(2)(a) General
51-2.02E(2)(b) Design Requirements <\/td>\n<\/tr>\n
680<\/td>\n51-2.02E(3) Construction
51-2.02E(4) Payment
51-2.02F Asphaltic Plug Joint Seals
51-2.02F(1) General
51-2.02F(1)(a) Summary
51-2.02F(1)(b) Definitions
51-2.02F(1)(c) Submittals
51-2.02F(1)(c)(i) General
51-2.02F(1)(c)(ii) Shop Drawings
51-2.02F(1)(c)(iii) Product Data
51-2.02F(1)(c)(iv) Certificate of Compliance
51-2.02F(1)(c)(v) Samples
51-2.02F(1)(d) Quality Assurance
51-2.02F(1)(d)(i) General <\/td>\n<\/tr>\n
681<\/td>\n51-2.02F(1)(d)(ii) Quality Control
51-2.02F(2) Materials
51-2.02F(3) Construction <\/td>\n<\/tr>\n
682<\/td>\n51-2.02F(4) Payment
51-2.03 SLIDING JOINTS
51-2.03A General
51-2.03B Materials
51-2.03C Construction
51-2.03D Payment
51-2.04 WATERSTOPS
51-2.04A General
51-2.04A(1) Summary
51-2.04A(2) Definitions <\/td>\n<\/tr>\n
683<\/td>\n51-2.04A(3) Submittals
51-2.04A(4) Quality Assurance
51-2.04B Materials
51-2.04C Construction <\/td>\n<\/tr>\n
684<\/td>\n51-2.04D Payment
51-2.05 STRIP WATERSTOPS
51-2.05A General
51-2.05B Materials
51-2.05C Construction
51-2.05D Payment
51-3.01 GENERAL
51-3.01A General
51-3.01B Materials
51-3.01C Construction
51-3.01D Payment <\/td>\n<\/tr>\n
685<\/td>\n51-3.02 ELASTOMERIC BEARING PADS
51-3.02A General
51-3.02A(1) Summary
51-3.02A(2) Definitions
51-3.02A(3) Submittals
51-3.02A(3)(a) General
51-3.02A(3)(b) Samples
51-3.02A(3)(b)(i) General
51-3.02A(3)(b)(ii) Plain Elastomeric Bearing Pads
51-3.02A(3)(b)(iii) Steel-Reinforced Elastomeric Bearing Pads
51-3.02A(3)(c) Certificate of Compliance
51-3.02A(3)(c)(i) General
51-3.02A(3)(c)(ii) Plain Elastomeric Bearing Pads
51-3.02A(3)(c)(iii) Steel-Reinforced Elastomeric Bearing Pads
51-3.02A(4) Quality Assurance
51-3.02A(4)(a) General
51-3.02A(4)(b) Department Acceptance
51-3.02A(4)(b)(i) General <\/td>\n<\/tr>\n
686<\/td>\n51-3.02A(4)(b)(ii) Plain Elastomeric Bearing Pads
51-3.02A(4)(b)(iii) Steel-Reinforced Elastomeric Bearing Pads
51-3.02B Materials
51-3.02B(1) General
51-3.02B(2) Plain Elastomeric Bearing Pads <\/td>\n<\/tr>\n
687<\/td>\n51-3.02B(3) Steel-Reinforced Elastomeric Bearing Pads
51-3.02C Construction
51-3.02D Payment
51-3.03 PTFE SPHERICAL BEARINGS
51-3.03A General
51-3.03A(1) Summary
51-3.03A(2) Definitions <\/td>\n<\/tr>\n
688<\/td>\n51-3.03A(3) Submittals
51-3.03A(3)(a) General
51-3.03A(3)(b) Shop Drawings
51-3.03A(4) Quality Assurance
51-3.03A(4)(a) General
51-3.03A(4)(b) Quality Control
51-3.03A(4)(b)(i) General
51-3.03A(4)(b)(ii) Proof Testing <\/td>\n<\/tr>\n
689<\/td>\n51-3.03B Materials
51-3.03B(1) General
51-3.03B(2) Fabrication <\/td>\n<\/tr>\n
690<\/td>\n51-3.03C Construction
51-3.03D Payment
51-3.04\u201351-3.05 RESERVED
51-4.01 GENERAL
51-4.01A Summary
51-4.01B Definitions <\/td>\n<\/tr>\n
691<\/td>\n51-4.01C Submittals
51-4.01C(1) General
51-4.01C(2) Shop Drawings
51-4.01C(2)(a) General
51-4.01C(2)(b) Girders
51-4.01C(2)(c) Closure Wall Panels
51-4.01C(2)(d) Box Culverts
51-4.01C(2)(e) Deck Panels
51-4.01D Quality Assurance
51-4.01D(1) General <\/td>\n<\/tr>\n
692<\/td>\n51-4.01D(2) Quality Control
51-4.01D(3) Department Acceptance
51-4.02 MATERIALS
51-4.02A General
51-4.02B Delivery, Storage, and Handling
51-4.02C Materials
51-4.02D Fabricating Precast Concrete Members
51-4.02D(1) General
51-4.02D(2) Girders, Box Girders, and Double T Girders <\/td>\n<\/tr>\n
693<\/td>\n51-4.02D(3) Slabs
51-4.02D(4) Closure Wall Panels
51-4.02D(5) Box Culverts
51-4.02D(6) Lagging
51-4.02D(7) Deck Panels <\/td>\n<\/tr>\n
694<\/td>\n51-4.03 CONSTRUCTION
51-4.03A General
51-4.03B Girders, Box Girders, and Double T Girders
51-4.03C Slabs <\/td>\n<\/tr>\n
695<\/td>\n51-4.03D Closure Wall Panels
51-4.03E Box Culverts
51-4.03F Lagging
51-4.03G Deck Panels
51-4.04 PAYMENT
51-5.01 GENERAL
51-5.01A Summary
51-5.01B Definitions
51-5.01C Submittals
51-5.01D Quality Assurance
51-5.01D(1) General <\/td>\n<\/tr>\n
696<\/td>\n51-5.01D(2) Quality Control
51-5.01D(2)(a) General
51-5.01D(2)(b) Rapid Strength Concrete
51-5.02 MATERIALS
51-5.02A General
51-5.02B Fabric
51-5.02C Concrete <\/td>\n<\/tr>\n
697<\/td>\n51-5.02D Aggregate Base
51-5.02E Bar Reinforcement
51-5.02F Miscellaneous Joint Materials
51-5.02G Hot Mix Asphalt
51-5.03 CONSTRUCTION
51-5.03A General
51-5.03B Type N Approach Slabs
51-5.03B(1) General <\/td>\n<\/tr>\n
698<\/td>\n51-5.03B(2) Filter Fabric
51-5.03B(3) Treated Permeable Base
51-5.03C Type EQ Approach Slabs
51-5.03D Type R Approach Slabs
51-5.03D(1) General
51-5.03D(2) Removal of Existing Facilities
51-5.03D(3) Existing Base Material <\/td>\n<\/tr>\n
699<\/td>\n51-5.03D(4) Aggregate Base
51-5.03D(5) Profile Grade
51-5.03D(6) Temporary Roadway Structural Section
51-5.03E Paving Notch Extensions
51-5.04 PAYMENT <\/td>\n<\/tr>\n
700<\/td>\n51-6.01 GENERAL
51-6.01A Summary
51-6.01B Definitions
51-6.01C Submittals
51-6.01D Quality Assurance
51-6.01D(1) General
51-6.01D(2) Quality Control
51-6.01D(2)(a) General
51-6.01D(2)(b) Temperature Monitoring <\/td>\n<\/tr>\n
701<\/td>\n51-6.02 MATERIALS
51-6.03 CONSTRUCTION
51-6.04 PAYMENT
51-7.01 GENERAL
51-7.01A General <\/td>\n<\/tr>\n
702<\/td>\n51-7.01B Materials
51-7.01C Construction
51-7.01D Payment
51-7.02 PRECAST DRAINAGE INLETS <\/td>\n<\/tr>\n
703<\/td>\n52 REINFORCEMENT
52-1.01 GENERAL
52-1.01A Summary
52-1.01B Definitions
52-1.01C Submittals
52-1.01C(1) General
52-1.01C(2) Shop Drawings <\/td>\n<\/tr>\n
704<\/td>\n52-1.01C(3) Certificates
52-1.01D Quality Assurance
52-1.02 MATERIALS
52-1.02A General
52-1.02B Bar Reinforcement <\/td>\n<\/tr>\n
705<\/td>\n52-1.02C Welded Wire Reinforcement
52-1.02D Reinforcing Wire
52-1.03 CONSTRUCTION
52-1.03A General
52-1.03B Cleaning
52-1.03C Bending
52-1.03D Placing <\/td>\n<\/tr>\n
706<\/td>\n52-1.04 PAYMENT <\/td>\n<\/tr>\n
707<\/td>\n52-2.01 GENERAL
52-2.01A General
52-2.01A(1) Summary
52-2.01A(2) Definitions
52-2.01A(3) Submittals
52-2.01A(3)(a) General
52-2.01A(3)(b) Samples
52-2.01A(3)(b)(i) General
52-2.01A(3)(b)(ii) Epoxy Powder Test Samples
52-2.01A(3)(b)(iii) Patching Material Test Samples
52-2.01A(3)(b)(iv) Test Samples
52-2.01A(4) Quality Assurance
52-2.01B Materials <\/td>\n<\/tr>\n
708<\/td>\n52-2.01C Construction
52-2.01D Payment
52-2.02 EPOXY-COATED REINFORCEMENT
52-2.02A General
52-2.02A(1) Summary
52-2.02A(2) Definitions
52-2.02A(3) Submittals
52-2.02A(3)(a) General
52-2.02A(3)(b) Test Samples
52-2.02A(3)(c) Certificates <\/td>\n<\/tr>\n
709<\/td>\n52-2.02A(4) Quality Assurance
52-2.02A(4)(a) General
52-2.02A(4)(b) Department Acceptance
52-2.02B Materials
52-2.02C Construction
52-2.02D Payment
52-2.03 EPOXY-COATED PREFABRICATED REINFORCEMENT
52-2.03A General
52-2.03A(1) Summary
52-2.03A(2) Definitions
52-2.03A(3) Submittals
52-2.03A(3)(a) General
52-2.03A(3)(b) Test Samples <\/td>\n<\/tr>\n
710<\/td>\n52-2.03A(3)(c) Certificates
52-2.03A(4) Quality Assurance
52-2.03A(4)(a) General
52-2.03A(4)(b) Department Acceptance
52-2.03B Materials
52-2.03C Construction
52-2.03D Payment
52-3.01 GENERAL <\/td>\n<\/tr>\n
711<\/td>\n52-3.02 MATERIALS
52-3.03 CONSTRUCTION
52-3.04 PAYMENT
52-5.01 GENERAL
52-5.01A Summary
52-5.01B Definitions
52-5.01C Submittals
52-5.01C(1) General
52-5.01C(2) Samples
52-5.01C(2)(a) General
52-5.01C(2)(b) Test Samples
52-5.01C(3) Test Reports <\/td>\n<\/tr>\n
712<\/td>\n52-5.01C(4) Certificates
52-5.01D Quality Assurance
52-5.01D(1) General
52-5.01D(2) Qualifications
52-5.01D(3) Test Samples
52-5.01D(4) Quality Control
52-5.01D(4)(a) General
52-5.01D(4)(b) Quality Control Testing <\/td>\n<\/tr>\n
713<\/td>\n52-5.01D(4)(c) Quality Control Test Report
52-5.01D(5) Department Acceptance
52-5.02 MATERIALS <\/td>\n<\/tr>\n
714<\/td>\n52-5.03 CONSTRUCTION
52-5.04 PAYMENT
52-6.01 GENERAL
52-6.01A Summary
52-6.01B Definitions
52-6.01C Submittals
52-6.01C(1) General
52-6.01C(2) Product Data
52-6.01C(2)(a) General
52-6.01C(2)(b) Radiographic Film Developing Process Records
52-6.01C(3) Samples
52-6.01C(3)(a) General
52-6.01C(3)(b) Test Samples
52-6.01C(4) Test Reports
52-6.01C(4)(a) General
52-6.01C(4)(b) Splicing Quality Control Test Report <\/td>\n<\/tr>\n
715<\/td>\n52-6.01C(4)(c) Splice Rejection Mitigation Report
52-6.01C(5) Certificates
52-6.01C(6) Qualification Statements
52-6.01C(6)(a) General
52-6.01C(6)(b) Welder and Welding Procedures Qualifications
52-6.01C(6)(c) Splice Prequalification Report
52-6.01C(6)(d) Weld Flash Removal Process
52-6.01D Quality Assurance
52-6.01D(1) General <\/td>\n<\/tr>\n
716<\/td>\n52-6.01D(2) Qualifications
52-6.01D(2)(a) General
52-6.01D(2)(b) Operator and Procedure Prequalification
52-6.01D(2)(c) Welder and Welding Procedure Qualifications
52-6.01D(3) Test Samples
52-6.01D(3)(a) General
52-6.01D(3)(b) Ultimate Butt Splice
52-6.01D(4) Quality Control
52-6.01D(4)(a) General <\/td>\n<\/tr>\n
717<\/td>\n52-6.01D(4)(b) Quality Control Testing
52-6.01D(4)(b)(i) General
52-6.01D(4)(b)(ii) Total Slip Testing
52-6.01D(4)(b)(iii) Service Splice Testing <\/td>\n<\/tr>\n
718<\/td>\n52-6.01D(4)(b)(iv) Ultimate Butt Splice Testing <\/td>\n<\/tr>\n
719<\/td>\n52-6.01D(4)(c) Weld Flash Removal Process
52-6.01D(4)(d) Splicing Quality Control Test Report
52-6.01D(5) Department Acceptance
52-6.02 MATERIALS
52-6.02A General
52-6.02B Service Splices and Ultimate Butt Splices
52-6.02B(1) General
52-6.02B(2) Service Splices <\/td>\n<\/tr>\n
720<\/td>\n52-6.02B(3) Ultimate Butt Splices
52-6.03 CONSTRUCTION
52-6.03A General
52-6.03B Lap Splicing <\/td>\n<\/tr>\n
721<\/td>\n52-6.03C Service Splices and Ultimate Butt Splices
52-6.03C(1) General
52-6.03C(2) Mechanical Splices
52-6.03C(3) Resistance-Butt-Welded Splices
52-6.03C(4) Complete-Joint-Penetration Butt-Welded Splices <\/td>\n<\/tr>\n
722<\/td>\n52-6.04 PAYMENT
52-7.01 GENERAL
52-7.01A Summary
52-7.01B Definitions
52-7.01C Submittals
52-7.01D Quality Assurance
52-7.01D(1) General
52-7.01D(2) Prestressing Tendon Connection
52-7.01D(3)\u201352-7.01D(5) Reserved
52-7.02 MATERIALS
52-7.02A General
52-7.02B Prestressing Tendon Connection
52-7.02C Bar Reinforcing Steel Connection
52-7.02D Copper Cable to Bar Reinforcing Steel Connection <\/td>\n<\/tr>\n
723<\/td>\n52-7.02E Pile and Concrete Epoxy Insulation
52-7.02F Concrete Insulation Course
52-7.02G Neoprene Sheet Insulation
52-7.02H Joint Sealant Insulation
52-7.02I Membrane Insulation
52-7.02J Mortar Block Insulation
52-7.02K Epoxy-Coated Reinforcing Steel Insulation
52-7.02L Plastic End Cover Insulators
52-7.02M Pipe Wrapping Tape Insulation
52-7.02N Epoxy for Insulation of Embedded Metal Materials <\/td>\n<\/tr>\n
724<\/td>\n52-7.03 CONSTRUCTION
52-7.03A General
52-7.03B Prestressing Tendon Connection
52-7.03C Bar Reinforcing Steel Connection
52-7.03D Copper Cable to Bar Reinforcing Steel Connection
52-7.03E Pile and Concrete Epoxy Insulation
52-7.03F Concrete Insulation Course
52-7.03G Neoprene Sheet Insulation
52-7.03H Joint Sealant Insulation
52-7.03I Membrane Insulation <\/td>\n<\/tr>\n
725<\/td>\n52-7.03J Mortar Block Insulation
52-7.03K Epoxy-Coated Reinforcing Steel Insulation
52-7.03L Plastic End Cover Insulators
52-7.03M Pipe Wrapping Tape Insulation
52-7.03N Epoxy for Insulation of Embedded Metal Materials
52-7.04 PAYMENT <\/td>\n<\/tr>\n
727<\/td>\n53 SHOTCRETE
53-1.01 GENERAL
53-1.01A Summary
53-1.01B Definitions
53-1.01C Submittals
53-1.01D Quality Assurance
53-1.02 MATERIALS
53-1.03 CONSTRUCTION
53-1.03A General
53-1.03B Preparing Foundations <\/td>\n<\/tr>\n
728<\/td>\n53-1.03C Placing Shotcrete
53-1.03D Finishing Shotcrete
53-1.04 PAYMENT
53-2.01 GENERAL
53-2.01A Summary
53-2.01B Definitions
53-2.01C Submittals <\/td>\n<\/tr>\n
729<\/td>\n53-2.01D Quality Assurance
53-2.01D(1) General
53-2.01D(2) Qualifications
53-2.01D(3) Preconstruction Test Panels
53-2.01D(4) Quality Control
53-2.01D(4)(a) General <\/td>\n<\/tr>\n
730<\/td>\n53-2.01D(4)(b) Field Quality Control
53-2.01D(5) Department Acceptance
53-2.01D(5)(a) General
53-2.01D(5)(b) Visual Inspection
53-2.01D(5)(c) Compressive Strength
53-2.02 MATERIALS <\/td>\n<\/tr>\n
731<\/td>\n53-2.03 CONSTRUCTION
53-2.04 PAYMENT <\/td>\n<\/tr>\n
733<\/td>\n54 WATERPROOFING
54-1.01 GENERAL
54-1.02 MATERIALS
54-1.03 CONSTRUCTION
54-1.04 PAYMENT
54-2.01 GENERAL
54-2.02 MATERIALS
54-2.03 CONSTRUCTION
54-2.03A General
54-2.03B Waterproofing <\/td>\n<\/tr>\n
734<\/td>\n54-2.03C Dampproofing
54-2.04 PAYMENT
54-3.01 GENERAL
54-3.01A Summary
54-3.01B Definitions
54-3.01C Submittals
54-3.01D Quality Assurance
54-3.02 MATERIALS <\/td>\n<\/tr>\n
735<\/td>\n54-3.03 CONSTRUCTION <\/td>\n<\/tr>\n
736<\/td>\n54-3.04 PAYMENT
54-4.01 GENERAL
54-4.02 MATERIALS
54-4.02A General
54-4.02B Membrane
54-4.02C Protective Cover <\/td>\n<\/tr>\n
737<\/td>\n54-4.03 CONSTRUCTION
54-4.03A General
54-4.03B Butyl Membrane Waterproofing <\/td>\n<\/tr>\n
738<\/td>\n54-4.03C Asphaltic Protective Cover
54-4.04 PAYMENT
54-5.01 GENERAL
54-5.01A Summary
54-5.01B Definitions
54-5.01C Submittals
54-5.01D Quality Assurance
54-5.02 MATERIALS <\/td>\n<\/tr>\n
739<\/td>\n54-5.03 CONSTRUCTION <\/td>\n<\/tr>\n
740<\/td>\n54-5.04 PAYMENT
54-6.01 GENERAL
54-6.02 MATERIALS
54-6.03 CONSTRUCTION
54-6.04 PAYMENT <\/td>\n<\/tr>\n
743<\/td>\n55 STEEL STRUCTURES
55-1.01 GENERAL
55-1.01A Summary
55-1.01B Definitions
55-1.01C Submittals
55-1.01C(1) General
55-1.01C(2) Shop Drawings <\/td>\n<\/tr>\n
744<\/td>\n55-1.01C(3) Check Testing
55-1.01D Quality Assurance
55-1.01D(1) General
55-1.01D(2) Qualifications
55-1.01D(3) Quality Control
55-1.01D(3)(a) General <\/td>\n<\/tr>\n
745<\/td>\n55-1.01D(3)(b) Source Quality Control
55-1.01D(3)(b)(i) General
55-1.01D(3)(b)(ii) Charpy V-notch Requirements
55-1.01D(3)(b)(iii) Rotational Capacity Testing
55-1.01D(3)(b)(iii)(1) General
55-1.01D(3)(b)(iii)(2) Long Bolt Test <\/td>\n<\/tr>\n
747<\/td>\n55-1.01D(3)(b)(iii)(3) Short Bolt Test <\/td>\n<\/tr>\n
749<\/td>\n55-1.01D(3)(c) Field Quality Control
55-1.01D(3)(c)(i) General
55-1.01D(3)(c)(ii) Rotational Capacity Testing
55-1.01D(3)(c)(iii) Installation Tension Testing
55-1.01D(3)(c)(iv) Verification Tension Testing
55-1.01D(4) Department Acceptance <\/td>\n<\/tr>\n
750<\/td>\n55-1.02 MATERIALS
55-1.02A General
55-1.02B Delivery, Storage, and Handling
55-1.02C Design Requirements
55-1.02D Materials
55-1.02D(1) General <\/td>\n<\/tr>\n
751<\/td>\n55-1.02D(2) Charpy V-notch Requirements <\/td>\n<\/tr>\n
752<\/td>\n55-1.02D(3) Structural Steel
55-1.02D(4) Bearing Pads
55-1.02D(5) Castings <\/td>\n<\/tr>\n
753<\/td>\n55-1.02D(6) Unidentified Stock Material
55-1.02D(7) Miscellaneous Materials
55-1.02E Fabrication
55-1.02E(1) General
55-1.02E(2) Flatness of Faying and Bearing Surfaces
55-1.02E(3) Bent Plates <\/td>\n<\/tr>\n
754<\/td>\n55-1.02E(4) Fastener Threads
55-1.02E(5) Pin Connections
55-1.02E(6) Bolted Connections
55-1.02E(6)(a) General <\/td>\n<\/tr>\n
755<\/td>\n55-1.02E(6)(b) Bolt Holes
55-1.02E(6)(b)(i) General
55-1.02E(6)(b)(ii) Punching
55-1.02E(6)(b)(iii) Drilling
55-1.02E(6)(b)(iv) Reaming <\/td>\n<\/tr>\n
756<\/td>\n55-1.02E(6)(c) Installation
55-1.02E(7) Welding
55-1.02E(7)(a) General <\/td>\n<\/tr>\n
757<\/td>\n55-1.02E(7)(b) Backing for Welds
55-1.02E(7)(c) Steel Pedestrian Bridges
55-1.02E(8) Curved Girders
55-1.02E(9) Shop Assembly <\/td>\n<\/tr>\n
758<\/td>\n55-1.03 CONSTRUCTION
55-1.03A General
55-1.03B Falsework
55-1.03C Erection
55-1.03C(1) General
55-1.03C(2) Continuous Members
55-1.03C(3) Bearings and Anchorages <\/td>\n<\/tr>\n
759<\/td>\n55-1.03C(4)\u201355-1.03C(10) Reserved
55-1.04 PAYMENT <\/td>\n<\/tr>\n
761<\/td>\n56 OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES
56-1.01 GENERAL
56-1.02 MATERIALS
56-1.03 CONSTRUCTION
56-1.04 PAYMENT
56-2.01 GENERAL
56-2.01A Summary
56-2.01B Definitions
56-2.01C Submittals
56-2.01C(1) General
56-2.01C(2) Shop Drawings <\/td>\n<\/tr>\n
762<\/td>\n56-2.01C(3) Quality Control Program
56-2.01D Quality Assurance
56-2.01D(1) General
56-2.01D(2) Quality Control
56-2.01D(2)(a) General
56-2.01D(2)(b) Nondestructive Testing
56-2.01D(2)(b)(i) General
56-2.01D(2)(b)(ii) Ultrasonic Testing
56-2.01D(2)(b)(iii) Radiographic Testing
56-2.01D(2)(b)(iv) Longitudinal Seam Welds <\/td>\n<\/tr>\n
763<\/td>\n56-2.01D(2)(c) Walkway Safety Railing
56-2.01D(3) Department Acceptance
56-2.02 MATERIALS
56-2.02A General
56-2.02B Bars, Plates, Shapes, and Structural Tubing
56-2.02B(1) General
56-2.02B(2) Charpy V-notch Impact
56-2.02C Sheets
56-2.02D Bolted Connections <\/td>\n<\/tr>\n
764<\/td>\n56-2.02E Anchorages
56-2.02F Pipe Posts
56-2.02G Steel Walkway Gratings
56-2.02H Elastomeric Bearing Pads
56-2.02I Safety Chain at Walkways
56-2.02J Safety Cable at Walkways
56-2.02K Fabrication
56-2.02K(1) General <\/td>\n<\/tr>\n
765<\/td>\n56-2.02K(2) Welding
56-2.02K(3) Bolted Connections
56-2.02K(4) Walkway
56-2.02K(5) Handholes <\/td>\n<\/tr>\n
766<\/td>\n56-2.02K(6) Identification Plate
56-2.02L Surface Finish
56-2.02L(1) General
56-2.02L(2) Galvanizing
56-2.02L(3) Cleaning and Painting
56-2.03 CONSTRUCTION
56-2.03A General
56-2.03B Existing Sign Structures
56-2.03B(1) General
56-2.03B(2) Remove Sign Structure
56-2.03B(3) Reconstruct Sign Structure <\/td>\n<\/tr>\n
767<\/td>\n56-2.03B(4) Modify Sign Structure
56-2.03B(5) Relocate Sign Structure
56-2.03B(6) Salvage Sign Structure
56-2.04 PAYMENT
56-3.01 GENERAL
56-3.01A General
56-3.01B Materials
56-3.01B(1) General
56-3.01B(2) Fabrication
56-3.01B(2)(a) General
56-3.01B(2)(b) Bonding Jumper
56-3.01C Construction
56-3.01C(1) General
56-3.01C(2) Foundations
56-3.01C(2)(a) General <\/td>\n<\/tr>\n
768<\/td>\n56-3.01C(2)(b) Cast-In-Drilled-Hole Concrete Pile Foundations <\/td>\n<\/tr>\n
769<\/td>\n56-3.01C(3) Identification Tags
56-3.01D Payment
56-3.02 STEEL STANDARDS, POLES, PEDESTALS, AND POSTS
56-3.02A General
56-3.02A(1) General
56-3.02A(2) Definitions
56-3.02A(3) Submittals
56-3.02A(3)(a) General
56-3.02A(3)(b) Test Reports <\/td>\n<\/tr>\n
770<\/td>\n56-3.02A(4) Quality Assurance
56-3.02A(4)(a) General
56-3.02A(4)(b) Quality Control
56-3.02A(4)(c) Department Acceptance
56-3.02B Materials
56-3.02B(1) General
56-3.02B(2) Bolted Connections <\/td>\n<\/tr>\n
771<\/td>\n56-3.02B(3) Standards and Poles
56-3.02B(3)(a) General
56-3.02B(3)(b) Fabrication
56-3.02B(3)(c) Welding <\/td>\n<\/tr>\n
772<\/td>\n56-3.02C Construction
56-3.02D Payment
56-3.03\u201356-3.04 RESERVED
56-3.05 HIGH MAST LIGHTING ASSEMBLY POLES
56-3.06 WOOD POLES
56-3.06A General
56-3.06B Materials <\/td>\n<\/tr>\n
773<\/td>\n56-3.06C Construction
56-3.06D Payment <\/td>\n<\/tr>\n
775<\/td>\n57 WOOD AND PLASTIC LUMBER STRUCTURES
57-1.01 GENERAL
57-1.01A Summary
57-1.01B Definitions
57-1.01C Submittals
57-1.01D Quality Assurance
57-1.02 MATERIALS
57-1.02A General
57-1.02B Structural Metal
57-1.02C Hardware
57-1.03 CONSTRUCTION
57-1.04 PAYMENT <\/td>\n<\/tr>\n
776<\/td>\n57-2.01 GENERAL
57-2.01A General
57-2.01A(1) Summary
57-2.01A(2) Definitions
57-2.01A(3) Submittals
57-2.01A(4) Quality Assurance
57-2.01B Materials
57-2.01B(1) General
57-2.01B(2) Structural Timber and Lumber <\/td>\n<\/tr>\n
777<\/td>\n57-2.01B(3) Preservative Treatment
57-2.01C Construction
57-2.01C(1) General
57-2.01C(2) Framing <\/td>\n<\/tr>\n
778<\/td>\n57-2.01C(3) Treated Timber
57-2.01C(3)(a) General
57-2.01C(3)(b) Manual Treatment <\/td>\n<\/tr>\n
779<\/td>\n57-2.01C(3)(c) Handling
57-2.01C(4) Painting
57-2.01D Payment
57-2.02 TIMBER LAGGING
57-2.02A General
57-2.02B Materials
57-2.02C Construction
57-2.02D Payment
57-2.03 TIMBER CATWALK
57-2.03A General
57-2.03B Materials
57-2.03B(1) General <\/td>\n<\/tr>\n
780<\/td>\n57-2.03B(2) Timber Planks
57-2.03B(3) Cable Handrail
57-2.03C Construction
57-2.03D Payment
57-2.04 ABUTMENT LUMBER BLOCKING
57-2.05 TIMBER RETAINING WALLS
57-2.06\u201357-2.10 RESERVED
57-3.01 GENERAL
57-3.01A Summary
57-3.01B Definitions
57-3.01C Submittals
57-3.01C(1) General <\/td>\n<\/tr>\n
781<\/td>\n57-3.01C(2) Shop Drawings
57-3.01D Quality Assurance
57-3.01D(1) General
57-3.01D(2) Quality Control
57-3.01D(2)(a) General
57-3.01D(2)(b) Stiffness Test
57-3.01D(3) Department Acceptance
57-3.01D(3)(a) General
57-3.01D(3)(b) Void Testing
57-3.01D(3)(b)(i) General
57-3.01D(3)(b)(ii) Exterior Void Test <\/td>\n<\/tr>\n
782<\/td>\n57-3.01D(3)(b)(iii) Interior Void Test
57-3.02 MATERIALS
57-3.02A General <\/td>\n<\/tr>\n
783<\/td>\n57-3.02B Reinforced Recycled Plastic Lumber
57-3.02C Composite Plastic Lumber <\/td>\n<\/tr>\n
784<\/td>\n57-3.02D Unreinforced Recycled Plastic Lumber
57-3.03 CONSTRUCTION
57-3.04 PAYMENT
57-3.05\u201357-3.10 RESERVED <\/td>\n<\/tr>\n
785<\/td>\n58 SOUND WALLS
58-1.01 GENERAL
58-1.02 MATERIALS
58-1.03 CONSTRUCTION
58-1.04 PAYMENT
58-2.01 GENERAL
58-2.01A Summary
58-2.01B Definitions
58-2.01C Submittals
58-2.01C(1) General
58-2.01C(2) Test Data
58-2.01C(3) Product Data
58-2.01C(4) Mix Design
58-2.01C(5) Samples
58-2.01C(6) Qualification Data
58-2.01C(7) Certificates of Compliance
58-2.01C(8) Daily Field Report and Final Report <\/td>\n<\/tr>\n
786<\/td>\n58-2.01D Quality Assurance
58-2.01D(1) General
58-2.01D(2) Quality Control
58-2.01D(2)(a) General
58-2.01D(2)(b) Preconstruction Testing
58-2.01D(2)(c) Field Quality Control
58-2.01D(2)(c)(i) General
58-2.01D(2)(c)(ii) Special Inspector
58-2.01D(2)(c)(iii) Masonry Compressive Strength Testing <\/td>\n<\/tr>\n
787<\/td>\n58-2.01D(3) Department Acceptance
58-2.02 MATERIALS
58-2.02A General
58-2.02B Concrete Masonry Units
58-2.02C Mortar
58-2.02D Grout
58-2.02E Lightweight Aggregate <\/td>\n<\/tr>\n
788<\/td>\n58-2.02F Reinforcement
58-2.02G Expansion Joint Filler
58-2.02H Access Gates
58-2.03 CONSTRUCTION
58-2.03A General
58-2.03B Mortar Bedding and Jointing <\/td>\n<\/tr>\n
789<\/td>\n58-2.03C Reinforcement
58-2.03D Grouting
58-2.03E Access Gates
58-2.04 PAYMENT
58-4.01 GENERAL
58-4.01A Summary
58-4.01B Definitions
58-4.01C Submittals
58-4.01C(1) General
58-4.01C(2) Shop Drawings <\/td>\n<\/tr>\n
790<\/td>\n58-4.01D Quality Assurance
58-4.02 MATERIALS
58-4.03 CONSTRUCTION
58-4.04 PAYMENT <\/td>\n<\/tr>\n
791<\/td>\n59 STRUCTURAL STEEL COATINGS
59-1.01 GENERAL
59-1.01A Summary
59-1.01B Definitions
59-1.01C Submittals
59-1.01D Quality Assurance
59-1.02 MATERIALS
59-1.02A General
59-1.02B Abrasives
59-1.02C Coatings
59-1.03 CONSTRUCTION
59-1.03A General
59-1.03B Weather Conditions <\/td>\n<\/tr>\n
792<\/td>\n59-1.03C Cleaning
59-1.03C(1) General
59-1.03C(2) Pressure Rinsing
59-1.03C(3) Pressure Washing
59-1.03C(4) Steam Cleaning
59-1.03C(5) Blast Cleaning
59-1.03D Painting <\/td>\n<\/tr>\n
793<\/td>\n59-1.04 PAYMENT
59-2.01 GENERAL
59-2.01A General
59-2.01A(1) Summary
59-2.01A(2) Definitions
59-2.01A(3) Submittals
59-2.01A(3)(a) General
59-2.01A(3)(b) Mandatory SSPC-QP Certifications
59-2.01A(3)(c) Painting Quality Work Plan <\/td>\n<\/tr>\n
794<\/td>\n59-2.01A(4) Quality Assurance
59-2.01A(4)(a) General
59-2.01A(4)(b) Certifications
59-2.01A(4)(c) Prepainting Meeting
59-2.01A(4)(d) Quality Control
59-2.01A(4)(d)(i) General
59-2.01A(4)(d)(ii) Inorganic Zinc Coatings <\/td>\n<\/tr>\n
795<\/td>\n59-2.01B Materials
59-2.01B(1) General
59-2.01B(2) Design Criteria
59-2.01B(2)(a) General
59-2.01B(2)(b) Ventilated Containment Systems <\/td>\n<\/tr>\n
796<\/td>\n59-2.01C Construction
59-2.01C(1) General
59-2.01C(2) Containment Systems
59-2.01C(2)(a) General
59-2.01C(2)(b) Ventilated Containment Systems
59-2.01C(2)(b)(i) General
59-2.01C(2)(b)(ii) Ventilation <\/td>\n<\/tr>\n
797<\/td>\n59-2.01C(3) Surface Preparation
59-2.01C(3)(a) General
59-2.01C(3)(b) Cleaning
59-2.01C(3)(b)(i) General
59-2.01C(3)(b)(ii) Blast Cleaning
59-2.01C(4) Painting
59-2.01C(4)(a) General <\/td>\n<\/tr>\n
798<\/td>\n59-2.01C(4)(b) Zinc Coating System
59-2.01C(4)(b)(i) General <\/td>\n<\/tr>\n
799<\/td>\n59-2.01C(4)(b)(ii) Undercoat <\/td>\n<\/tr>\n
800<\/td>\n59-2.01C(4)(b)(iii) Final Coat
59-2.01C(4)(b)(iv) Finish Coats
59-2.01C(4)(c) State Specification Paint Waterborne Coating System
59-2.01C(4)(d) Moisture-Cured Polyurethane Coating System
59-2.01D Payment <\/td>\n<\/tr>\n
801<\/td>\n59-2.02 PAINTING STEEL SOLDIER PILES
59-2.02A General
59-2.02B Materials
59-2.02C Construction
59-2.02D Payment
59-2.03\u201359-2.05 RESERVED
59-3.01 GENERAL
59-3.02 MATERIALS
59-3.03 CONSTRUCTION
59-3.04 PAYMENT
59-4.01 GENERAL <\/td>\n<\/tr>\n
802<\/td>\n59-4.02 MATERIALS
59-4.03 CONSTRUCTION
59-4.03A General
59-4.03B Undercoating of Ungalvanized Surfaces
59-4.03C Testing of Inorganic Zinc Coating
59-4.03D Finish Coats
59-4.04 PAYMENT
59-5.01 GENERAL
59-5.01A Summary
59-5.01B Definitions
59-5.01C Submittals
59-5.01C(1) General
59-5.01C(2) Coating Quality Work Plan <\/td>\n<\/tr>\n
803<\/td>\n59-5.01D Quality Assurance
59-5.01D(1) General
59-5.01D(2) Precoating Meeting
59-5.01D(3) Test Coupons
59-5.01D(4) Quality Control
59-5.02 MATERIALS <\/td>\n<\/tr>\n
804<\/td>\n59-5.03 CONSTRUCTION
59-5.04 PAYMENT <\/td>\n<\/tr>\n
805<\/td>\n60 EXISTING STRUCTURES
60-1.01 GENERAL
60-1.02 MATERIALS
60-1.03 CONSTRUCTION
60-1.04 PAYMENT
60-2.01 GENERAL
60-2.01A General
60-2.01B Materials
60-2.01C Construction
60-2.01D Payment <\/td>\n<\/tr>\n
806<\/td>\n60-2.02 BRIDGE REMOVAL
60-2.02A General
60-2.02A(1) Summary
60-2.02A(2) Definitions
60-2.02A(3) Submittals
60-2.02A(4) Quality Assurance
60-2.02A(4)(a) General
60-2.02A(4)(b) Quality Control
60-2.02B Materials
60-2.02B(1) General
60-2.02B(2) Design Criteria for Temporary Support Shoring and Temporary Bracing <\/td>\n<\/tr>\n
807<\/td>\n60-2.02C Construction
60-2.02C(1) General
60-2.02C(2) Protective Covers
60-2.02C(3) Preliminary Work <\/td>\n<\/tr>\n
808<\/td>\n60-2.02D Payment
60-2.03\u201360-2.10 RESERVED
60-3.01 GENERAL
60-3.01A General
60-3.01B Materials
60-3.01C Construction
60-3.01D Payment
60-3.02 BRIDGE DECK REPAIR AND PREPARATION
60-3.02A General
60-3.02B Materials
60-3.02B(1) General
60-3.02B(2) Rapid Setting Concrete
60-3.02C Construction
60-3.02C(1) General <\/td>\n<\/tr>\n
809<\/td>\n60-3.02C(2) Removing Concrete Deck Surface
60-3.02C(3) Removing Asphalt Concrete Surfacing
60-3.02C(4) Removing Seals
60-3.02C(5) Removing Unsound Concrete <\/td>\n<\/tr>\n
810<\/td>\n60-3.02C(6) Rapid Setting Concrete Patch
60-3.02C(7) Prepare Concrete Deck Surface
60-3.02C(8)\u201360-3.02C(15) Reserved
60-3.02D Payment
60-3.03 BRIDGE DECK TREATMENT
60-3.03A General
60-3.03A(1) General <\/td>\n<\/tr>\n
811<\/td>\n60-3.03A(2) Materials
60-3.03A(3) Construction
60-3.03A(4) Payment
60-3.03B Methacrylate Resin Bridge Deck Treatment
60-3.03B(1) General
60-3.03B(1)(a) Summary
60-3.03B(1)(b) Definitions
60-3.03B(1)(c) Submittals
60-3.03B(1)(d) Quality Assurance
60-3.03B(2) Materials <\/td>\n<\/tr>\n
812<\/td>\n60-3.03B(3) Construction <\/td>\n<\/tr>\n
813<\/td>\n60-3.03B(4) Payment
60-3.03C\u201360-3.03J Reserved
60-3.04 DECK OVERLAYS
60-3.04A General
60-3.04A(1) General
60-3.04A(2) Materials
60-3.04A(3) Construction
60-3.04A(4) Payment
60-3.04B Polyester Concrete Overlays
60-3.04B(1) General
60-3.04B(1)(a) Summary
60-3.04B(1)(b) Definitions
60-3.04B(1)(c) Submittals
60-3.04B(1)(d) Quality Assurance <\/td>\n<\/tr>\n
814<\/td>\n60-3.04B(2) Materials <\/td>\n<\/tr>\n
815<\/td>\n60-3.04B(3) Construction
60-3.04B(3)(a) General
60-3.04B(3)(b) Placing Methacrylate Resin <\/td>\n<\/tr>\n
816<\/td>\n60-3.04B(3)(c) Placing Polyester Concrete
60-3.04B(4) Payment <\/td>\n<\/tr>\n
817<\/td>\n60-3.04C Polyester Concrete Expansion Dams
60-3.04C(1) General
60-3.04C(1)(a) Summary
60-3.04C(1)(b) Definitions
60-3.04C(1)(c) Submittals
60-3.04C(1)(d) Quality Assurance
60-3.04C(2) Materials
60-3.04C(3) Construction
60-3.04C(4) Payment
60-3.04D Concrete Overlays
60-3.04D(1) General <\/td>\n<\/tr>\n
818<\/td>\n60-3.04D(2) Materials
60-3.04D(3) Construction
60-3.04D(4) Payment
60-3.04E Multilayer Polymer Overlays
60-3.04F\u201360-3.04M Reserved
60-3.05 REPAIRING STRUCTURES
60-3.05A General
60-3.05A(1) General
60-3.05A(2) Materials
60-3.05A(3) Construction
60-3.05A(4) Payment
60-3.05B Repairing Spalled Surface Areas
60-3.05B(1) General
60-3.05B(1)(a) Summary
60-3.05B(1)(b) Definitions
60-3.05B(1)(c) Submittals
60-3.05B(1)(d) Quality Assurance
60-3.05B(2) Materials <\/td>\n<\/tr>\n
819<\/td>\n60-3.05B(3) Construction
60-3.05B(4) Payment
60-3.05C Epoxy Crack Injection
60-3.05C(1) General
60-3.05C(1)(a) Summary
60-3.05C(1)(b) Definitions
60-3.05C(1)(c) Submittals
60-3.05C(1)(d) Quality Assurance
60-3.05C(2) Materials <\/td>\n<\/tr>\n
820<\/td>\n60-3.05C(3) Construction
60-3.05C(4) Payment
60-3.05D Heat-Straighten Steel Girders
60-3.05E\u201360-3.05J Reserved
60-3.06\u201360-3.10 RESERVED
60-4.01 GENERAL
60-4.01A General
60-4.01B Materials
60-4.01C Construction
60-4.01D Payment
60-4.02 REFINISHING BRIDGE DECKS
60-4.02A General <\/td>\n<\/tr>\n
821<\/td>\n60-4.02B Materials
60-4.02C Construction
60-4.02C(1) General
60-4.02C(2) Placing Portland Cement Concrete <\/td>\n<\/tr>\n
822<\/td>\n60-4.02C(3) Placing Rapid Setting Concrete
60-4.02D Payment
60-4.03 ACCESS OPENINGS
60-4.03A General
60-4.03B Materials
60-4.03C Construction
60-4.03C(1) General
60-4.03C(2) Deck Access Openings
60-4.03C(3) Soffit Access Openings
60-4.03C(4) Soffit Access Opening Extensions <\/td>\n<\/tr>\n
823<\/td>\n60-4.03C(5) Close Deck Access Openings
60-4.03D Payment
60-4.04 CORING CONCRETE
60-4.04A General
60-4.04A(1) Summary
60-4.04A(2) Definitions
60-4.04A(3) Submittals
60-4.04A(4) Quality Assurance
60-4.04B Materials
60-4.04C Construction <\/td>\n<\/tr>\n
824<\/td>\n60-4.04D Payment
60-4.05 CORING AND PRESSURE GROUTING DOWELS
60-4.05A General
60-4.05B Materials
60-4.05C Construction
60-4.05D Payment
60-4.06 STEEL COLUMN CASINGS
60-4.06A General
60-4.06A(1) Summary
60-4.06A(2) Definitions
60-4.06A(3) Submittals
60-4.06A(4) Quality Assurance <\/td>\n<\/tr>\n
825<\/td>\n60-4.06B Materials
60-4.06B(1) General
60-4.06B(2) Grout
60-4.06C Construction
60-4.06C(1) General
60-4.06C(2) Painting
60-4.06C(3) Grouting <\/td>\n<\/tr>\n
826<\/td>\n60-4.06D Payment
60-4.07 COMPOSITE COLUMNS CASINGS
60-4.08 PRESTRESSING STEEL GIRDERS
60-4.09 BRIDGE JOINT RESTRAINERS
60-4.09A General
60-4.09A(1) Summary
60-4.09A(2) Definitions
60-4.09A(3) Submittals
60-4.09A(3)(a) General
60-4.09A(3)(b) Cable-Type Restrainers <\/td>\n<\/tr>\n
827<\/td>\n60-4.09A(3)(c) Pipe-Type Restrainers
60-4.09A(4) Quality Assurance
60-4.09B Materials
60-4.09B(1) General
60-4.09B(2) Cable Type Restrainers
60-4.09B(2)(a) General <\/td>\n<\/tr>\n
828<\/td>\n60-4.09B(2)(b) Corrosion Protection
60-4.09B(2)(c) Fabrication
60-4.09B(2)(c)(i) General
60-4.09B(2)(c)(ii) Applying Corrosion Protection <\/td>\n<\/tr>\n
829<\/td>\n60-4.09B(3) Bar Type Restrainers
60-4.09B(4) Pipe Type Restrainers
60-4.09C Construction
60-4.09C(1) General
60-4.09C(2) Cable Type Restrainers
60-4.09C(3) Bar Type Restrainers
60-4.09C(4) Pipe Type Restrainers
60-4.09D Payment <\/td>\n<\/tr>\n
830<\/td>\n60-4.10\u201360-4.15 RESERVED
60-5.01 GENERAL
60-5.01A General
60-5.01B Materials
60-5.01C Construction
60-5.01D Payment
60-5.02 ABANDONING PEDESTRIAN UNDERCROSSINGS
60-5.03\u201360-5.10 RESERVED <\/td>\n<\/tr>\n
831<\/td>\nDIVISION VII DRAINAGE FACILITIES
61 GENERAL
61-1.01 GENERAL
61-1.02 MATERIALS
61-1.03 CONSTRUCTION
61-1.04 PAYMENT
61-2.01 GENERAL
61-2.01A Summary
61-2.01B Definitions
61-2.01C Submittals <\/td>\n<\/tr>\n
832<\/td>\n61-2.01D Quality Assurance
61-2.01D(1) General
61-2.01D(2) Quality Control
61-2.01D(2)(a) Watertightness Test
61-2.01D(2)(b) Performance Specifications <\/td>\n<\/tr>\n
833<\/td>\n61-2.01D(3) Field Leakage Testing
61-2.01D(3)(a) General <\/td>\n<\/tr>\n
834<\/td>\n61-2.01D(3)(b) Exfiltration and Infiltration Testing
61-2.01D(3)(c) Low-Pressure Air Test <\/td>\n<\/tr>\n
835<\/td>\n61-2.01D(3)(d) Other Allowable Tests
61-2.01D(3)(e) Joints or Pipe Section Not Passing Leakage Testing
61-2.01D(3)(f) Reserved
61-2.02 MATERIALS
61-2.03 CONSTRUCTION <\/td>\n<\/tr>\n
836<\/td>\n61-2.04 PAYMENT
61-3.01 GENERAL
61-3.02 MATERIALS
61-3.03 CONSTRUCTION
61-3.04 PAYMENT
61-4.01 GENERAL
61-4.02 MATERIALS
61-4.03 CONSTRUCTION <\/td>\n<\/tr>\n
837<\/td>\n61-4.04 PAYMENT
61-5.01 GENERAL
61-5.01A Summary
61-5.01B Definitions
61-5.01C Submittals
61-5.01D Quality Assurance
61-5.02 MATERIALS
61-5.03 CONSTRUCTION
61-5.04 PAYMENT <\/td>\n<\/tr>\n
838<\/td>\n61-6.01 GENERAL
61-6.02 MATERIALS
61-6.03 CONSTRUCTION
61-6.04 PAYMENT
62\u201363 RESERVED <\/td>\n<\/tr>\n
839<\/td>\n64 PLASTIC PIPE
64-1.01 GENERAL
64-1.01A Summary
64-1.01B Definitions
64-1.01C Submittals
64-1.01D Quality Assurance
64-1.02 MATERIALS
64-1.03 CONSTRUCTION
64-1.04 PAYMENT
64-2.01 GENERAL
64-2.01A Summary
64-2.01B Definitions
64-2.01C Submittals
64-2.01D Quality Assurance
64-2.02 MATERIALS
64-2.02A General <\/td>\n<\/tr>\n
840<\/td>\n64-2.02B Backfill
64-2.02C Corrugated Polyethylene Pipe
64-2.02D Corrugated PVC Pipe with Smooth Interior <\/td>\n<\/tr>\n
841<\/td>\n64-2.02E Joints
64-2.02F\u201364-2.02H Reserved
64-2.03 CONSTRUCTION
64-2.03A General <\/td>\n<\/tr>\n
842<\/td>\n64-2.03B Earthwork
64-2.03C Pipe Placement
64-2.04 PAYMENT <\/td>\n<\/tr>\n
843<\/td>\n65 CONCRETE PIPE
65-1.01 GENERAL
65-1.02 MATERIALS
65-1.03 CONSTRUCTION
65-1.04 PAYMENT
65-2.01 GENERAL
65-2.01A Summary
65-2.01B Definitions
65-2.01C Submittals <\/td>\n<\/tr>\n
844<\/td>\n65-2.01D Quality Assurance
65-2.01D(1) General
65-2.01D(2) Field Testing of Siphon and Pressure Pipe <\/td>\n<\/tr>\n
845<\/td>\n65-2.01D(3) Circular Reinforced Concrete Pipe, Described or Chosen by Class
65-2.01D(4) Circular Reinforced Concrete Pipe, Direct Design Method
65-2.01D(5) Oval Shaped Reinforced Concrete Pipe
65-2.02 MATERIALS
65-2.02A General <\/td>\n<\/tr>\n
846<\/td>\n65-2.02B Delivery, Storage and Handling
65-2.02C Circular Reinforced Concrete Pipe
65-2.02C(1) General
65-2.02C(2) Circular Reinforced Concrete Pipe, Described or Chosen by Class <\/td>\n<\/tr>\n
847<\/td>\n65-2.02C(3) Circular Reinforced Concrete Pipe, Direct Design Method
65-2.02D Oval Shaped Reinforced Concrete Pipe <\/td>\n<\/tr>\n
848<\/td>\n65-2.02E Reserved
65-2.02F Joints
65-2.03 CONSTRUCTION
65-2.03A General
65-2.03B Earthwork
65-2.03C Laying Pipe <\/td>\n<\/tr>\n
849<\/td>\n65-2.04 PAYMENT
65-3.01 GENERAL
65-3.02 MATERIALS
65-3.03 CONSTRUCTION
65-3.04 PAYMENT <\/td>\n<\/tr>\n
851<\/td>\n66 CORRUGATED METAL PIPE
66-1.01 GENERAL
66-1.01A Summary
66-1.01B Definitions
66-1.01C Submittals
66-1.01D Quality Assurance
66-1.01D(1) General
66-1.01D(2)Quality Control
66-1.01D(2)a Field Testing of Corrugated Steel Pipe Siphons
66-1.02 MATERIALS
66-1.02A General <\/td>\n<\/tr>\n
852<\/td>\n66-1.02B Dimensions and Thickness
66-1.02C Protective Coatings, Linings, and Paving <\/td>\n<\/tr>\n
853<\/td>\n66-1.02D Coupling Bands
66-1.02E Corrugated Steel Pipe
66-1.02E(1) General
66-1.02E(2) Fabrication
66-1.02E(2)(a) General
66-1.02E(2)(b) Fabrication by Riveting
66-1.02E(2)(c) Fabrication by Continuous Helical Seam
66-1.02E(2)(c)(i) General <\/td>\n<\/tr>\n
854<\/td>\n66-1.02E(2)(c)(ii) Fabrication by Continuous Lock Seam
66-1.02E(2)(c)(iii) Fabrication by Continuous Welded Seam
66-1.02E(3) End Finish
66-1.02E(4) Damaged Galvanizing
66-1.02E(5) Damaged Aluminum Coatings <\/td>\n<\/tr>\n
855<\/td>\n66-1.02E(6) Corrugated Steel Pipe Siphons
66-1.02F Corrugated Aluminum Pipe
66-1.02F(1) General
66-1.02F(2) Fabrication
66-1.02F(2)(a) General
66-1.02F(2)(b) Fabrication by Riveting
66-1.02F(2)(c) Fabrication by Continuous Helical Lock Seam
66-1.02F(3) End Finish
66-1.03 CONSTRUCTION <\/td>\n<\/tr>\n
856<\/td>\n66-1.04 PAYMENT
66-2.01 GENERAL
66-2.02 MATERIALS
66-2.03 CONSTRUCTION <\/td>\n<\/tr>\n
857<\/td>\n66-2.04 PAYMENT
66-3.01 GENERAL
66-3.02 MATERIALS
66-3.03 CONSTRUCTION
66-3.04 PAYMENT
66-4.01 GENERAL
66-4.02 MATERIALS <\/td>\n<\/tr>\n
859<\/td>\n66-4.03 CONSTRUCTION
66-4.04 PAYMENT <\/td>\n<\/tr>\n
861<\/td>\n67 STRUCTURAL PLATE CULVERTS
67-1.01 GENERAL
67-1.02 MATERIALS
67-1.03 CONSTRUCTION
67-1.04 PAYMENT
67-2.01 GENERAL
67-2.01A Summary
67-2.01B Definitions
67-2.01C Submittals
67-2.01D Quality Assurance
67-2.02 MATERIALS
67-2.02A General <\/td>\n<\/tr>\n
862<\/td>\n67-2.02B Protective Coating
67-2.02C Identification
67-2.02D Reserved
67-2.03 CONSTRUCTION
67-2.04 PAYMENT <\/td>\n<\/tr>\n
863<\/td>\n67-3.01 GENERAL
67-3.01A Summary
67-3.01B Definitions
67-3.01C Submittals
67-3.01D Quality Assurance
67-3.02 MATERIALS
67-3.02A General <\/td>\n<\/tr>\n
864<\/td>\n67-3.02B Pressure Grouting <\/td>\n<\/tr>\n
865<\/td>\n67-3.02C Reserved
67-3.03 CONSTRUCTION
67-3.04 PAYMENT <\/td>\n<\/tr>\n
867<\/td>\n68 SUBSURFACE DRAINS
68-1.01 GENERAL
68-1.01A Summary
68-1.01B Definitions
68-1.01C Submittals
68-1.01D Quality Assurance
68-1.02 MATERIALS
68-1.02A General
68-1.02B Protective Coating
68-1.03 CONSTRUCTION
68-1.03A General
68-1.03B Filter Fabric
68-1.04 PAYMENT
68-2.01 GENERAL
68-2.01A Summary
68-2.01B Definitions
68-2.01C Submittals <\/td>\n<\/tr>\n
868<\/td>\n68-2.01C Quality Assurance
68-2.02 MATERIALS
68-2.02A General
68-2.02B Perforated Steel Pipe
68-2.02C Perforated Aluminum Pipe
68-2.02D Perforated Plastic Pipe
68-2.02E Underdrain Outlets and Risers <\/td>\n<\/tr>\n
869<\/td>\n68-2.02F Permeable Material
68-2.02F(1) General
68-2.02F(2) Class 1 Permeable Material
68-2.02F(3) Class 2 Permeable Material <\/td>\n<\/tr>\n
870<\/td>\n68-2.02F(4) Class 3 Permeable Material
68-2.02G Filter Fabric
68-2.02H\u201368-2.02N Reserved
68-2.03 CONSTRUCTION
68-2.04 PAYMENT
68-3.01 GENERAL <\/td>\n<\/tr>\n
871<\/td>\n68-3.02 MATERIALS
68-3.03 CONSTRUCTION <\/td>\n<\/tr>\n
872<\/td>\n68-3.04 PAYMENT
68-4.01 GENERAL
68-4.02 MATERIALS
68-4.02A General
68-4.02B Pipe and Pipe Fittings <\/td>\n<\/tr>\n
873<\/td>\n68-4.02C Treated Permeable Material
68-4.02D Filter Fabric
68-4.02E Miscellaneous
68-4.02F\u201368-4.02H Reserved
68-4.03 CONSTRUCTION <\/td>\n<\/tr>\n
874<\/td>\n68-4.04 PAYMENT
68-7.01 GENERAL
68-7.01A Summary
68-7.01B Definitions
68-7.01C Submittals <\/td>\n<\/tr>\n
875<\/td>\n68-7.01D Quality Assurance
68-7.02 MATERIALS
68-7.02A General
68-7.02B Geocomposite Drain
68-7.02C Plastic Pipe
68-7.02D Drainage Pads
68-7.02E Treated Permeable Base
68-7.03 CONSTRUCTION
68-7.04 PAYMENT <\/td>\n<\/tr>\n
877<\/td>\n69 OVERSIDE DRAINS
69-1.01 GENERAL
69-1.01A Summary
69-1.01B Definitions
69-1.01C Submittals
69-1.01D Quality Assurance
69-1.02 MATERIALS
69-1.02A General
69-1.02B Steel Pipe Overside Drains
69-1.02C Aluminum Pipe Overside Drains <\/td>\n<\/tr>\n
878<\/td>\n69-1.02D Plastic Pipe Overside Drains
69-1.02E Anchor Assemblies
69-1.02F Cable Anchorage System
69-1.02G Protective Coatings
69-1.03 CONSTRUCTION <\/td>\n<\/tr>\n
879<\/td>\n69-1.04 PAYMENT <\/td>\n<\/tr>\n
881<\/td>\n70 MISCELLANEOUS DRAINAGE FACILITIES
70-1.01 GENERAL
70-1.02 MATERIALS
70-1.03 CONSTRUCTION
70-1.04 PAYMENT
70-2.01 GENERAL
70-2.02 MATERIALS
70-2.03 CONSTRUCTION <\/td>\n<\/tr>\n
882<\/td>\n70-2.04 PAYMENT
70-3.01 GENERAL
70-3.01A Summary
70-3.01B Definitions
70-3.01C Submittals
70-3.01D Quality Assurance
70-3.01D(1) General
70-3.01D(2) Quality Control
70-3.02 MATERIALS
70-3.02A General
70-3.02B Coatings
70-3.02B(1) General
70-3.02B(2) Coal Tar Coating <\/td>\n<\/tr>\n
883<\/td>\n70-3.02B(3) Factory-Applied Fusion-Bonded Epoxy Coating
70-3.02B(4) Asphalt Coating
70-3.03 CONSTRUCTION
70-3.03A General
70-3.03B Coatings
70-3.04 PAYMENT
70-4.01 GENERAL
70-4.02 MATERIALS
70-4.03 CONSTRUCTION <\/td>\n<\/tr>\n
884<\/td>\n70-4.04 PAYMENT
70-5.01 GENERAL
70-5.01A General
70-5.01B Materials
70-5.01C Construction
70-5.01D Payment
70-5.02 FLARED END SECTIONS
70-5.02A General
70-5.02A(1) Summary
70-5.02A(2) Definitions
70-5.02A(3) Submittals
70-5.02A(4) Quality Assurance
70-5.02B Materials
70-5.02B(1) General
70-5.02B(2) Concrete Flared End Sections <\/td>\n<\/tr>\n
885<\/td>\n70-5.02B(3) Metal Flared End Sections
70-5.02B(4) Plastic Flared End Sections
70-5.02B(5) Alternative Flared End Sections
70-5.02C Construction
70-5.02D Payment
70.5.03 DRAINAGE GATES
70-5.03A General
70-5.03B Materials
70-5.03B(1) General
70-5.03B(2) Automatic Drainage Gates
70-5.03B(2)(a) General
70-5.03B(2)(b) Automatic Drainage Gates for Low Head Pressure
70-5.03B(2)(c) Automatic Drainage Gates for High Head Pressure
70-5.03B(3) Slide Headgates
70-5.03C Construction <\/td>\n<\/tr>\n
886<\/td>\n70-5.03D Payment
70-5.04 INLET DEPRESSIONS
70-5.04A General
70-5.04B Materials
70-5.04B(1) General
70-5.04B(2) Hot Mix Asphalt Inlet Depressions
70-5.04B(3) Concrete Inlet Depressions
70-5.04C Construction
70-5.04D Payment
70-5.05 DRAINAGE INLET MARKERS
70-5.05A General
70-5.05B Materials <\/td>\n<\/tr>\n
887<\/td>\n70-5.05C Construction
70-5.05D Payment <\/td>\n<\/tr>\n
888<\/td>\n70-5.06\u201370-5.15 RESERVED
70-6.01 GENERAL
70-6.01A Summary
70-6.01B Definitions
70-6.01C Submittals
70-6.01D Quality Assurance
70-6.02 MATERIALS
70-6.02A General
70-6.02B Line Drain Channel
70-6.02C Line Drain Frames and Grates <\/td>\n<\/tr>\n
889<\/td>\n70-6.03 CONSTRUCTION
70-6.04 PAYMENT
70-7.01 GENERAL
70-7.01A Summary
70-7.01B Definitions
70-7.01C Submittals
70-7.01D Quality Assurance
70-7.02 MATERIALS
70-7.02A General <\/td>\n<\/tr>\n
890<\/td>\n70-7.02B Casing
70-7.02C Casing Hanger Assemblies
70-7.02D Concrete Casing Supports
70-7.03 CONSTRUCTION <\/td>\n<\/tr>\n
891<\/td>\n70-7.04 PAYMENT <\/td>\n<\/tr>\n
893<\/td>\n71 EXISTING DRAINAGE FACILITIES
71-1.01 GENERAL
71-1.02 MATERIALS
71-1.03 CONSTRUCTION
71-1.04 PAYMENT
71-2.01 GENERAL
71-2.02 MATERIALS
71-2.03 CONSTRUCTION
71-2.04 PAYMENT
71-3.01 GENERAL
71-3.01A General
71-3.01A(1) Summary <\/td>\n<\/tr>\n
894<\/td>\n71-3.01A(2) Definitions
71-3.01A(3) Submittals
71-3.01A(4) Quality Assurance
71-3.01A(4)(a) General
71-3.01A(4)(b) Preconstruction Meetings
71-3.01A(4)(b)i Prerehabilitation Meeting
71-3.01A(4)(b)ii Pregrouting Meeting
71-3.01A(4)(c) Quality Control
71-3.01A(4)(c)i Annular Space Grouting <\/td>\n<\/tr>\n
895<\/td>\n71-3.01A(4)(c)ii CCTV Recording
71-3.01A(4)(c)iii Photographs
71-3.01A(4)(c)iv Monitoring of Annular Space Grouting <\/td>\n<\/tr>\n
896<\/td>\n71-3.01A(4)(c)v Pipeliners
71-3.01A(4)(c)vi Deflection Testing of Pipeliners
71-3.01B Materials
71-3.01B(1) General
71-3.01B(2) Contact Grout <\/td>\n<\/tr>\n
897<\/td>\n71-3.01B(3) Annular Space Grout
71-3.01C Construction
71-3.01C(1) General
71-3.01C(2) Cleaning and Preparation
71-3.01C(3) Inspection and Evaluation <\/td>\n<\/tr>\n
898<\/td>\n71-3.01C(4) Repairing
71-3.01C(5) Rehabilitation
71-3.01C(5)(a) General
71-3.01C(5)(b) Annular Space Grouting
71-3.01C(5)(c) Restoring Openings <\/td>\n<\/tr>\n
899<\/td>\n71-3.01C(5)(d) Postrehabilitation Inspection
71-3.01D Payment
71-3.02 FILL CULVERT VOIDS
71-3.03 CONTACT GROUTING
71-3.04 INVERT PAVING
71-3.05 EDPM RUBBER PIPE JOINT SEAL
71-3.06 WELDED STEEL PIPELINERS
71-3.07 PLASTIC PIPELINERS
71-3.08 CURED-IN-PLACE PIPELINERS <\/td>\n<\/tr>\n
900<\/td>\n71-3.09 MACHINE SPIRAL WOUND PVC PIPELINERS
71-3.09A General
71-3.09A(1) General
71-3.09A(1)(a) Summary
71-3.09A(1)(b) Definitions
71-3.09A(1)(c) Submittals
71-3.09A(1)(d) Quality Assurance
71-3.09A(2) Materials
71-3.09A(3) Construction
71-3.09A(4) Payment
71-3.09B Machine Spiral Wound PVC Pipeliners, Grouted
71-3.09B(1) General
71-3.09B(1)(a) Summary
71-3.09B(1)(b) Definitions
71-3.09B(1)(c) Submittals <\/td>\n<\/tr>\n
901<\/td>\n71-3.09B(1)(d) Quality Assurance
71-3.09B(2) Materials
71-3.09B(3) Construction
71-3.09B(4) Payment
71-3.09C Machine Spiral Wound PVC Pipeliners, Expandable Diameter
71-3.09C(1) General
71-3.09C(2) Materials
71-3.09C(3) Construction
71-3.09C(4) Payment
71-3.10 CEMENTITIOUS PIPELINERS
71-3.11\u201371-3.15 RESERVED
71-4.01 GENERAL
71-4.01A General
71-4.01B Materials <\/td>\n<\/tr>\n
902<\/td>\n71-4.01C Construction
71-4.01D Payment
71-4.02 PIPES
71-4.02A General
71-4.02B Materials
71-4.02C Construction
71-4.02D Payment
71-4.03 INLETS, MANHOLES, AND RISERS
71-4.03A General
71-4.03B Materials
71-4.03C Construction
71-4.03D Payment
71-4.04 SLOTTED PIPE GRATE
71-5.01 GENERAL
71-5.02 MATERIALS
71-5.03 CONSTRUCTION
71-5.03A General <\/td>\n<\/tr>\n
903<\/td>\n71-5.013B Frames, Covers, Grates, and Manholes
71-5.03C Inlet
71-5.04 PAYMENT <\/td>\n<\/tr>\n
904<\/td>\n71-6.01 GENERAL
71-6.01A General
71-6.01B Materials
71-6.01C Construction
71-6.01D Payment
71-6.02 MANHOLES
71-6.03 CULVERTS AND PIPELINES
71-6.04 INLETS
71-6.05\u201371-6.15 RESERVED
71-7.01A GENERAL
71-7.01B MATERIALS
71-7.01C CONSTRUCTION
71-7.01D PAYMENT <\/td>\n<\/tr>\n
905<\/td>\nDIVISION VIII MISCELLANEOUS CONSTRUCTION
72 SLOPE PROTECTION
72-1.01 GENERAL
72-1.02 MATERIALS
72-1.03 CONSTRUCTION
72-1.04 PAYMENT
72-2.01 GENERAL
72-2.02 MATERIALS
72-2.02A General
72-2.02B Rock <\/td>\n<\/tr>\n
907<\/td>\n72-2.02C Fabric
72-2.03 CONSTRUCTION
72-2.03A General
72-2.03B Placement Method A
72-2.03C Placement Method B
72-2.04 PAYMENT
72-3.01 GENERAL
72-3.02 MATERIALS
72-3.02A General <\/td>\n<\/tr>\n
908<\/td>\n72-3.02B Concrete
72-3.02C Rock
72-3.02D Weep Tubes <\/td>\n<\/tr>\n
909<\/td>\n72-3.03 CONSTRUCTION
72-3.03A General
72-3.03B Placement Method A
72-3.03C Placement Method B
72-3.03D Placing Weep Tubes
72-3.03E Placing Concrete
72-3.04 PAYMENT <\/td>\n<\/tr>\n
910<\/td>\n72-4.01 GENERAL
72-4.02 MATERIALS
72-4.03 CONSTRUCTION
72-4.04 PAYMENT
72-5.01 GENERAL <\/td>\n<\/tr>\n
911<\/td>\n72-5.02 MATERIALS
72-5.03 CONSTRUCTION <\/td>\n<\/tr>\n
912<\/td>\n72-5.04 PAYMENT
72-11.01 GENERAL
72-11.01A General
72-11.01A(1) Summary
72-11.01A(2) Definitions
72-11.01A(3) Submittals
72-11.01A(4) Quality Assurance
72-11.01B Materials
72-11.01C Construction
72-11.01C(1) General <\/td>\n<\/tr>\n
913<\/td>\n72-11.01C(2) Minor Concrete
72-11.01C(3) Shotcrete
72-11.01D Payment
72-11.02 EXPOSED AGGREGATE SLOPE PAVING
72-11.02A General
72-11.02B Materials
72-11.02C Construction <\/td>\n<\/tr>\n
914<\/td>\n72-11.02D Payment
72-11.03 SLOPE PAVING WITH CONCRETE PAVERS
72-11.03A General
72-11.03A(1) Summary
72-11.03A(2) Definitions
72-11.03A(3) Submittals
72-11.03A(4) Quality Assurance
72-11.03B Materials
72-11.03B(1) General
72-11.03B(2) Concrete Pavers
72-11.03B(3) Mortar
72-11.03B(4) Bond Coat <\/td>\n<\/tr>\n
915<\/td>\n72-11.03B(5) Grout
72-11.03C Construction
72-11.03C(1) General
72-11.03C(2) Installation using a Bond Coat <\/td>\n<\/tr>\n
916<\/td>\n72-11.03C(3) Installation on a Mortar Bedding
72-11.03D Payment
72-16.01 GENERAL
72-16.01A Summary
72-16.01B Definitions
72-16.01C Submittals
72-16.01D Quality Assurance
72-16-.01D(1) General
72-16-.01D(2) Quality Control
72-16.02 MATERIALS
72-16.02A General
72-16.02B Mesh <\/td>\n<\/tr>\n
917<\/td>\n72-16.02C PVC Coating <\/td>\n<\/tr>\n
918<\/td>\n72-16.02D Joints
72-16.02E Internal Connecting Wire <\/td>\n<\/tr>\n
919<\/td>\n72-16.02F Fabric
72-16.02G Rock
72-16.03 CONSTRUCTION
72-16.03A General
72-16.03B Assembly <\/td>\n<\/tr>\n
920<\/td>\n72-16.03C Filling
72-16.04 PAYMENT
72-17.01 GENERAL
72-17.01A General
72-17.01B Material
72-17.01C Construction <\/td>\n<\/tr>\n
921<\/td>\n72-17.01D Payment
72-17.02 REMOVE SLOPE PAVING
72-17.02A General
72-17.02B Materials
72-17.02C Construction
72-17.02D Payment <\/td>\n<\/tr>\n
923<\/td>\n73 CONCRETE CURBS AND SIDEWALKS
73-1.01 GENERAL
73-1.02 MATERIALS
73-1.02A General
73-1.02B Detectable Warning Surfaces
73-1.03 CONSTRUCTION
73-1.03A General
73-1.03B Subgrade Preparation
73-1.03C Fixed Form Method <\/td>\n<\/tr>\n
924<\/td>\n73-1.03D Extruded and Slip Form Methods
73-1.03E Curing
73-1.04 PAYMENT <\/td>\n<\/tr>\n
925<\/td>\n73-2.01 GENERAL
73-2.02 MATERIALS
73-2.03 CONSTRUCTION
73-2.03A General
73-2.03B Fixed Form Method
73-2.03C Extruded or Slip Form Methods <\/td>\n<\/tr>\n
926<\/td>\n73-2.04 PAYMENT
73-3.01 GENERAL
73-3.01A Summary
73-3.01B Definitions
73-3.01C Submittals
73-3.01D Quality Assurance
73-3.01D(1) General
73-3.01D(2) Warranties
73-3.01D(3) Quality Control
73-3.02 MATERIALS
73-3.03 CONSTRUCTION <\/td>\n<\/tr>\n
927<\/td>\n73-3.04 PAYMENT
73-4.01 GENERAL
73-4.01A Summary
73-4.01B Definitions
73-4.01C Submittals
73-4.01D Quality Assurance
73-4.01D(1) General
73-4.01D(2) Quality Control
73-4.01D(3) Department Acceptance
73-4.02 MATERIALS
73-4.03 CONSTRUCTION <\/td>\n<\/tr>\n
928<\/td>\n73-4.04 PAYMENT
73-10.01 GENERAL
73-10.02 MATERIALS
73-10.03 CONSTRUCTION
73-10.04 PAYMENT <\/td>\n<\/tr>\n
929<\/td>\n74 PUMPING EQUIPMENT AND CONTROLS
74-1.01 GENERAL
74-1.01A Summary
74-1.01B Definitions
74-1.01C Submittals
74-1.01C(1) General
74-1.01C(2) Shop Drawings
74-1.01C(3) Product Data <\/td>\n<\/tr>\n
930<\/td>\n74-1.01C(4) Samples
74-1.01C(5) Work Plans
74-1.01C(5)(a) General
74-1.01C(5)(b) Performance Testing Plan
74-1.01C(5)(c) Maintenance Plan
74-1.01C(6) Maintenance and Operation Manual
74-1.01D Quality Assurance
74-1.01D(1) General
74-1.01D(2) Quality Control
74-1.01D(2)(a) General <\/td>\n<\/tr>\n
931<\/td>\n74-1.01D(2)(b) Operational Tests
74-1.01D(2)(c) Performance Tests
74-1.01D(2)(d) Drainage Pump Final Inspection
74-1.02 MATERIALS
74-1.02A General
74-1.02B Delivery, Storage, and Handling
74-1.03 CONSTRUCTION
74-1.03A General
74-1.03B Painting <\/td>\n<\/tr>\n
932<\/td>\n74-1.03C Care and Cleaning
74-1.03D Maintenance Instructions
74-1.03E Total Pumping Capacity and Maintenance Requirements <\/td>\n<\/tr>\n
933<\/td>\n74-1.03F Use of Pumps before Contract Acceptance
74-1.04 PAYMENT
74-2.01 GENERAL
74-2.01A Summary
74-2.01B Definitions
74-2.01C Submittals
74-2.01C(1) General
74-2.01C(2) Product Data <\/td>\n<\/tr>\n
934<\/td>\n74-2.01C(3) Certificates of Compliance
74-2.01D Quality Assurance
74-2.01D(1) General
74-2.01D(2) Regulatory Requirements
74-2.02 MATERIALS
74-2.02A General
74-2.02B Drainage Pumps and Pumping Apparatus
74-2.02B(1) General <\/td>\n<\/tr>\n
935<\/td>\n74-2.02B(2) Drainage Pump
74-2.02B(3) Pumping Apparatus <\/td>\n<\/tr>\n
936<\/td>\n74-2.02C Pump House Doors, Louvers, and Fans
74-2.02C(1) General
74-2.02C(2) Pump House Doors
74-2.02C(3) Wall Louvers
74-2.02C(4) Fans <\/td>\n<\/tr>\n
937<\/td>\n74-2.02D Pipe, Joints, and Fittings
74-2.02D(1) General
74-2.02D(2) Steel Pipe
74-2.02D(3) Ductile Iron Pipe
74-2.02D(4) Flexible Expansion Couplings
74-2.02E Bracing and Hardware
74-2.02F Storage Cabinets <\/td>\n<\/tr>\n
938<\/td>\n74-2.03 CONSTRUCTION
74-2.03A General
74-2.03B Pump House Doors
74-2.04 PAYMENT
74-3.01 GENERAL
74-3.01A Summary
74-3.01B Definitions
74-3.01C Submittals
74-3.01C(1) General
74-3.01C(2) Product Data <\/td>\n<\/tr>\n
939<\/td>\n74-3.01D Quality Assurance
74-3.01D(1) General
74-3.01D(2) Regulatory Requirements
74-3.01D(3) Manufacturer’s Field Services
74-3.01D(4) Field Quality Control
74-3.01D(5) Training
74-3.02 MATERIALS
74-3.02A General
74-3.02B Power and Metering Equipment
74-3.02B(1) General
74-3.02B(2) Service Pedestal Equipment
74-3.02B(3) Motor Control Center Equipment <\/td>\n<\/tr>\n
941<\/td>\n74-3.02C Pump Control
74-3.02C(1) General
74-3.02C(2) Water Level Monitoring System
74-3.02C(3) Pump Controller <\/td>\n<\/tr>\n
942<\/td>\n74-3.02D Conduit
74-3.02E Conductors and Cable
74-3.02E(1) General
74-3.02E(2) Conductors
74-3.02E(3) Conductor and Cable Identification
74-3.02F Nameplates and Warning Plates
74-3.02F(1) General
74-3.02F(2) Nameplate and Warning Plate Identification <\/td>\n<\/tr>\n
943<\/td>\n74-3.02G Miscellaneous Materials <\/td>\n<\/tr>\n
944<\/td>\n74-3.03 CONSTRUCTION
74-3.03A General
74-3.03B Installation
74-3.03B(1) General
74-3.03B(2) Conduit, Conductors, and Cable <\/td>\n<\/tr>\n
945<\/td>\n74-3.03B(3) Motor Control Center
74-3.03B(4) Panel LP
74-3.03B(5) Miscellaneous Materials
74-3.03C Conductor Splices
74-3.04 PAYMENT
74-4.01 GENERAL
74-4.01A Summary
74-4.01B Definitions
74-4.01C Submittals
74-4.01C(1) General
74-4.01C(2) Shop Drawings
74-4.01C(3) Product Data <\/td>\n<\/tr>\n
946<\/td>\n74-4.01C(4) Closeout Submittals
74-4.01D Quality Assurance
74-4.02 MATERIALS
74-4.02A General
74-4.02B Manufactured Units
74-4.02B(1) General <\/td>\n<\/tr>\n
947<\/td>\n74-4.02B(2) Components
74-4.02B(2)a General
74-4.02B(2)(b) Pumps
74-4.02B(2)(c) Ball Valves
74-4.02B(2)(d) Butterfly Valves
74-4.02B(2)(e) Pump Controller <\/td>\n<\/tr>\n
948<\/td>\n74-4.02B(2)(f) Booster Pump Enclosures
74-4.02B(2)(g) Pressure Gauges
74-4.02B(2)(h) Appurtenances
74-4.02B(3) Fabrication <\/td>\n<\/tr>\n
949<\/td>\n74-4.03 CONSTRUCTION
74-4.03A General
74-4.03B Foundation and Pad
74-4.03C Skid Installation
74-4.03D Nameplates
74-4.04 PAYMENT <\/td>\n<\/tr>\n
951<\/td>\n75 MISCELLANEOUS METAL
75-1.01 GENERAL
75-1.01A Summary
75-1.01B Definitions
75-1.01C Submittals
75-1.01D Quality Assurance
75-1.01D(1) General
75-1.01D(2) Qualifications
75-1.01D(3) Department Acceptance
75-1.02 MATERIALS
75-1.02A General <\/td>\n<\/tr>\n
952<\/td>\n75-1.02B Galvanizing <\/td>\n<\/tr>\n
954<\/td>\n75-1.02C\u201375-1.02H Reserved
75-1.03 CONSTRUCTION
75-1.04 PAYMENT
75-2.01 GENERAL
75-2.02 MATERIALS
75-2.02A General
75-2.02B Frames, Grates, and Covers
75-2.03 CONSTRUCTION
75-2.04 PAYMENT
75-3.01 GENERAL
75-3.01A Summary <\/td>\n<\/tr>\n
955<\/td>\n75-3.01B Definitions
75-3.01C Submittals
75-3.01C(1) General
75-3.01C(2) Bridge Deck Drainage System
75-3.01D Quality Assurance
75-3.01D(1) General
75-3.01D(2) Quality Control
75-3.01D(2)(a) General
75-3.01D(2)(b) Bridge Deck Drainage System
75-3.01D(2)(c) Nonskid Surface
75-3.01D(3) Department Acceptance
75-3.02 MATERIALS
75-3.02A General <\/td>\n<\/tr>\n
956<\/td>\n75-3.02B Bolted and Threaded Bar Connections
75-3.02C Anchorage Devices
75-3.02C(1) General
75-3.02C(2) Mechanical Expansion Anchors <\/td>\n<\/tr>\n
957<\/td>\n75-3.02C(3) Resin Capsule Anchors
75-3.02C(4) Cast-in-Place Concrete Inserts
75-3.02D Bridge Deck Drainage System
75-3.02D(1) General
75-3.02D(2) Pipe Connections and Joints <\/td>\n<\/tr>\n
958<\/td>\n75-3.02D(3) Fiberglass Pipes and Fittings
75-3.02D(4) PVC Pipes and Fittings
75-3.02E Bearing Devices
75-3.02F Nonskid Surface
75-3.03 CONSTRUCTION
75-3.03A General
75-3.03B Bolted and Threaded Bar Connections <\/td>\n<\/tr>\n
959<\/td>\n75-3.03C Anchorage Devices
75-3.03D Bridge Deck Drainage System
75-3.03E Bearing Devices
75-3.03F Nonskid Surface <\/td>\n<\/tr>\n
960<\/td>\n75-3.04 PAYMENT
75-4.01 GENERAL
75-4.02 MATERIALS
75-4.03 CONSTRUCTION
75-4.04 PAYMENT
75-5.01 GENERAL
75-5.01A Summary
75-5.01B Definitions
75-5.01C Submittals
75-5.01D Quality Assurance <\/td>\n<\/tr>\n
961<\/td>\n75-5.02 MATERIALS
75-5.03 CONSTRUCTION
75-5.04 PAYMENT <\/td>\n<\/tr>\n
963<\/td>\n76 WELLS <\/td>\n<\/tr>\n
965<\/td>\n77 LOCAL INFRASTRUCTURE <\/td>\n<\/tr>\n
967<\/td>\n78 INCIDENTAL CONSTRUCTION
78-1.01 GENERAL
78-1.02 MATERIALS
78-1.03 CONSTRUCTION
78-1.04 PAYMENT
78-2.01 GENERAL
78-2.02 MATERIALS
78-2.03 CONSTRUCTION
78-2.04 PAYMENT
78-4.01 GENERAL
78-4.01A General <\/td>\n<\/tr>\n
968<\/td>\n78-4.01B Materials
78-4.01C Construction
78-4.01D Payment
78-4.02 PAINTING TIMBER
78-4.02A General
78-4.02B Materials
78-4.02C Construction
78-4.02C(1) General
78-4.02C(2) Surface Preparation
78-4.02C(3) Application
78-4.02D Payment
78-4.03 PAINTING CONCRETE
78-4.03A General
78-4.03A(1) Summary
78-4.03A(2) Definitions
78-4.03A(3) Submittals
78-4.03A(4) Quality Assurance
78-4.03B Materials
78-4.03C Construction
78-4.03C(1) General <\/td>\n<\/tr>\n
969<\/td>\n78-4.03C(2) Surface Preparation
78-4.03C(3) Application
78-4.03D Payment
78-4.04 STAINING CONCRETE AND SHOTCRETE
78-4.04A General
78-4.04A(1) General
78-4.04A(1)(a) Summary
78-4.04A(1)(b) Definitions
78-4.04A(1)(c) Submittals
78-4.04A(1)(d) Quality Assurance
78-4.04A(1)(d)(i) General
78-4.04A(1)(d)(ii) Test Panels
78-4.04A(2) Materials
78-4.04A(2)(a) General
78-4.04A(2)(b) Stain <\/td>\n<\/tr>\n
970<\/td>\n78-4.04A(2)(c) Sealer
78-4.04A(2)(d) Sealing Compound
78-4.04A(3) Construction
78-4.04A(3)(a) General
78-4.04A(3)(b) Surface Preparation
78-4.04A(3)(c) Application
78-4.04A(4) Payment
78-4.04B Sculpted Shotcrete and Textured Concrete
78-4.04B(1) General
78-4.04B(1)(a) Summary
78-4.04B(1)(b) Definitions
78-4.04B(1)(c) Submittals
78-4.04B(1)(c)(i) General
78-4.04B(1)(c)(ii) Contractor Qualifications <\/td>\n<\/tr>\n
971<\/td>\n78-4.04B(1)(c)(iii) Application Plan
78-4.04B(1)(d) Quality Assurance
78-4.04B(1)(d)(i) General
78-4.04B(1)(d)(ii) Contractor Qualifications
78-4.04B(1)(d)(iii) Prestaining Meeting
78-4.04B(2) Materials
78-4.04B(3) Construction
78-4.04B(4) Payment
78-4.05 ROCK STAINING
78-4.05A GENERAL
78-4.05A(1) Summary
78-4.05A(2) Definitions
78-4.05A(3) Submittals <\/td>\n<\/tr>\n
972<\/td>\n78-4.05A(4) Quality Assurance
78-4.05A(4)(a) General
78-4.05A(4)(b) Test Plot
78-4.05B MATERIALS
78-4.05B(1) General
78-4.05B(2) Stain
78-4.05C CONSTRUCTION
78-4.05C(1) General
78-4.05C(2) Preparation
78-4.05C(3) Application
78-4.05D PAYMENT
78-4.06 ANTI-GRAFFITI COATING
78-4.06A General
78-4.06A(1) Summary
78-4.06A(2) Definitions
78-4.06A(3) Submittals <\/td>\n<\/tr>\n
973<\/td>\n78-4.06A(4) Quality Assurance
78-4.06B Materials
78-4.06C Construction
78-4.06D Payment
78-4.07 STAINING GALVANIZED SURFACES
78-4.08 PAINTING ELECTRICAL MATERIAL
78-4.08A General
78-4.08B Materials
78-4.08C Construction
78-4.08C(1) General
78-4.08C(2) Traffic Signal Faces and Fittings <\/td>\n<\/tr>\n
974<\/td>\n78-4.08D Payment
78-4.09\u201378-4.15 RESERVED
78-5.01 GENERAL
78-5.01A Summary
78-5.01B Definitions
78-5.01C Submittals
78-5.01D Quality Assurance
78-5.02 MATERIALS
78-5.03 CONSTRUCTION
78-5.04 PAYMENT
78-21.01 GENERAL <\/td>\n<\/tr>\n
975<\/td>\n78-21.02 MATERIALS
78-21.03 CONSTRUCTION
78-21.04 PAYMENT
78-22.01 GENERAL
78-22.02 MATERIALS
78-22.03 CONSTRUCTION
78-22.04 PAYMENT
79 RESERVED <\/td>\n<\/tr>\n
977<\/td>\n80 FENCES
80-1.01 GENERAL
80-1.02 MATERIALS
80-1.03 CONSTRUCTION
80-1.04 PAYMENT
80-2.01 GENERAL
80-2.01A Summary
80-2.01B Definitions <\/td>\n<\/tr>\n
978<\/td>\n80-2.01C Submittals
80-2.01D Quality Assurance
80-2.02 MATERIALS
80-2.02A General
80-2.02B Metal Posts and Braces
80-2.02C Wood Posts and Braces
80-2.02C(1) General
80-2.02C(2) Untreated <\/td>\n<\/tr>\n
979<\/td>\n80-2.02C(3) Treated <\/td>\n<\/tr>\n
980<\/td>\n80-2.02D Barbed Wire
80-2.02E Wire Mesh
80-2.02F Tension Wires, Hardware, and Grounding Materials
80-2.02G Gateways <\/td>\n<\/tr>\n
981<\/td>\n80-2.03 CONSTRUCTION <\/td>\n<\/tr>\n
982<\/td>\n80-2.04 PAYMENT
80-3.01 GENERAL
80-3.01A Summary
80-3.01B Definitions
80-3.01C Submittals
80-3.01D Quality Assurance <\/td>\n<\/tr>\n
983<\/td>\n80-3.02 MATERIALS
80-3.02A General
80-3.02B Posts and Braces
80-3.02C Fabric <\/td>\n<\/tr>\n
984<\/td>\n80-3.02D Tension Wires, Hog Rings, Turnbuckles, Truss Tighteners, Truss Rods, and Stretcher Bars and Bar Bands
80-3.02E Slats <\/td>\n<\/tr>\n
985<\/td>\n80-3.03 CONSTRUCTION
80-3.04 PAYMENT
80-10.01 GENERAL
80-10.01A Summary <\/td>\n<\/tr>\n
986<\/td>\n80-10.01B Definitions
80-10.01C Submittals
80-10.01D Quality Assurance
80-10.02 MATERIALS
80-10.03 CONSTRUCTION <\/td>\n<\/tr>\n
987<\/td>\n80-10.04 PAYMENT
80-15.01 GENERAL
80-15.01A General
80-15.01B Materials
80-15.01C Construction
80-15.01D Payment
80-15.02 RECONSTRUCT FENCES
80-15.02A General
80-15.02B Materials
80-15.02C Construction
80-15.02D Payment
80-15.03 SALVAGE FENCES
80-15.03A General
80-15.03B Materials
80-15.03C Construction
80-15.03D Payment <\/td>\n<\/tr>\n
988<\/td>\n80-15.04\u201380-15.08 RESERVED <\/td>\n<\/tr>\n
989<\/td>\nDIVISION IX TRAFFIC CONTROL DEVICES
81 MISCELLANEOUS TRAFFIC CONTROL DEVICES
81-1.01 GENERAL
81-1.02 MATERIALS
81-1.03 CONSTRUCTION
81-1.04 PAYMENT
81-2.01 GENERAL
81-2.01A Summary
81-2.01B Definitions
81-2.01C Submittals
81-2.01D Quality Assurance <\/td>\n<\/tr>\n
990<\/td>\n81-2.02 MATERIALS
81-2.02A General
81-2.02B Wood Posts
81-2.02C Metal Posts
81-2.02D Flexible Posts
81-2.02E Target Plates <\/td>\n<\/tr>\n
991<\/td>\n81-2.02F Hardware
81-2.02G\u201381-2.02L Reserved
81-2.03 CONSTRUCTION
81-2.04 PAYMENT
81-3.01 GENERAL
81-3.01A Summary
81-3.01B Definitions
81-3.01C Submittals
81-3.01D Quality Assurance
81-3.02 MATERIALS
81-3.02A General
81-3.02B Nonreflective Pavement Markers
81-3.02B(1) General <\/td>\n<\/tr>\n
992<\/td>\n81-3.02B(2) Plastic Nonreflective Pavement Markers
81-3.02B(3) Ceramic Nonreflective Pavement Markers
81-3.02C Retroreflective Pavement Markers <\/td>\n<\/tr>\n
993<\/td>\n81-3.02D Hot Melt Bituminous Adhesive <\/td>\n<\/tr>\n
994<\/td>\n81-3.02E Epoxy Adhesive
81-3.03 CONSTRUCTION
81-3.03A General
81-3.03B Hot Melt Bituminous Adhesive
81-3.03C Epoxy Adhesive <\/td>\n<\/tr>\n
995<\/td>\n81-3.03D Pavement Recesses
81-3.04 PAYMENT
81-8.01 GENERAL
81-8.02 MATERIALS
81-8.03 CONSTRUCTION
81-8.03A General
81-8.03B Remove Pavement Markers
81-8.03C Reserved
81-8.04 PAYMENT <\/td>\n<\/tr>\n
997<\/td>\n82 SIGNS AND MARKERS
82-1.01 GENERAL
82-1.01A Summary
82-1.02 MATERIALS
82-1.03 CONSTRUCTION
82-1.04 PAYMENT
82-2.01 GENERAL
82-2.01A Summary
82-2.01B Definitions
82-2.01C Submittals <\/td>\n<\/tr>\n
998<\/td>\n82-2.01D Quality Assurance
82-2.02 MATERIALS
82-2.02A General <\/td>\n<\/tr>\n
999<\/td>\n82-2.02B Aluminum Sheeting
82-2.02C Retroreflective Sheeting
82-2.02D Process Colors and Film <\/td>\n<\/tr>\n
1000<\/td>\n82-2.02E Single-Sheet Aluminum Panels
82-2.02F Fiberglass-Reinforced Plastic Panels <\/td>\n<\/tr>\n
1001<\/td>\n82-2.02G Laminated Panels
82-2.02G(1) General
82-2.02G(2) Roadside Laminated Panels <\/td>\n<\/tr>\n
1002<\/td>\n82-2.02G(3) Overhead Laminated Panels
82-2.02H Formed Panels
82-2.03 CONSTRUCTION
82-2.03A General
82-2.03B Laminated Panels <\/td>\n<\/tr>\n
1003<\/td>\n82-2.04 PAYMENT
82-3.01 GENERAL
82-3.01A Summary
82-3.01B Definitions
82-3.01C Submittals
82-3.01D Quality Assurance
82-3.02 MATERIALS
82-3.02A General
82-3.02B Metal Posts
82-3.02C Wood Posts <\/td>\n<\/tr>\n
1004<\/td>\n82-3.02D Laminated Wood Box Posts
82-3.02E Sign Panel Fastening and Mounting Hardware
82-3.03 CONSTRUCTION
82-3.03A General <\/td>\n<\/tr>\n
1005<\/td>\n82-3.03B Sign Panel Installation
82-3.04 PAYMENT
82-4.01 GENERAL
82-4.02 MATERIALS
82-4.03 CONSTRUCTION <\/td>\n<\/tr>\n
1006<\/td>\n82-4.04 PAYMENT
82-5.01 GENERAL
82-5.01A Summary
82-5.01B Definitions
82-5.01C Submittals
82-5.01D Quality Assurance
82-5.02 MATERIALS
82-5.02A General <\/td>\n<\/tr>\n
1007<\/td>\n82-5.02B Wood Posts
82-5.02C Metal Posts
82-5.02D Flexible Posts
82-5.02E Target Plates <\/td>\n<\/tr>\n
1008<\/td>\n82-5.02F Reflectors
82-5.02G Hardware
82-5.02H Highway Post Markers
82-5.02I\u201382-5.02L Reserved
82-5.03 CONSTRUCTION
82-5.04 PAYMENT
82-9.01 GENERAL
82-9.02 MATERIALS
82-9.03 CONSTRUCTION
82-9.03A General <\/td>\n<\/tr>\n
1009<\/td>\n82-9.03B Installation of Sign Panels on Existing Frames
82-9.03C Installation of Removable Sign Panel Frames
82-9.03D Relocate Markers
82-9.03E Reset Markers
82-9.04 PAYMENT <\/td>\n<\/tr>\n
1011<\/td>\n83 RAILINGS AND BARRIERS
83-1.01 GENERAL
83-1.02 MATERIALS
83-1.02A General
83-1.02B Steel Parts and Hardware
83-1.02C Mortar
83-1.02D Markers
83-1.03 CONSTRUCTION
83-1.03A General
83-1.03B Mortar
83-1.03C Median Barriers
83-1.04 PAYMENT <\/td>\n<\/tr>\n
1012<\/td>\n83-2.01 GENERAL
83-2.01A General
83-2.01A(1) General
83-2.01A(2) Materials
83-2.01A(3) Construction
83-2.01A(4) Payment
83-2.01B Vegetation Control
83-2.02 MIDWEST GUARDRAIL SYSTEMS
83-2.02A General
83-2.02A(1) Summary
83-2.02A(2) Definitions
83-2.02A(3) Submittals
83-2.02A(4) Quality Assurance
83-2.02B Materials
83-2.02B(1) General
83-2.02B(1)(a) General
83-2.02B(1)(b) Steel Components and Hardware <\/td>\n<\/tr>\n
1013<\/td>\n83-2.02B(1)(c) Wood Posts and Blocks
83-2.02B(1)(d) Bolt Hole Grease
83-2.02B(1)(e) Components for Connection to a Concrete Surface
83-2.02B(2) End Anchor Assemblies and Rail Tensioning Assemblies <\/td>\n<\/tr>\n
1014<\/td>\n83-2.02B(3) Type WB-31 Transition Railings <\/td>\n<\/tr>\n
1015<\/td>\n83-2.02C Construction
83-2.02C(1) General
83-2.02C(1)(a) General
83-2.02C(1)(b) Posts
83-2.02C(1)(c) Bolt Holes and Cuts in Wood Posts and Blocks
83-2.02C(1)(d) Rail Elements
83-2.02C(1)(e) Connection to a Concrete Bridge Railing or Barrier <\/td>\n<\/tr>\n
1016<\/td>\n83-2.02C(1)(f) Anchor Bolts Set With Epoxy
83-2.02C(2) End Anchor Assemblies
83-2.02C(3) Type WB-31 Transition Railings
83-2.02D Payment
83-2.03 THRIE BEAM BARRIERS
83-2.03A General
83-2.03B Materials <\/td>\n<\/tr>\n
1017<\/td>\n83-2.03C Construction
83-2.03D Payment
83-2.04 TERMINAL SYSTEMS
83-2.04A General
83-2.04A(1) General
83-2.04A(2) Materials
83-2.04A(3) Construction
83-2.04A(4) Payment <\/td>\n<\/tr>\n
1018<\/td>\n83-2.04B Alternative In-Line Terminal Systems
83-2.04C Alternative Flared Terminal Systems
83-2.04D\u201383-2.04H Reserved
83-2.05 CALIFORNIA BRIDGE RAILS
83-2.05A General
83-2.05A(1) Summary
83-2.05A(2) Definitions
83-2.05A(3) Submittals
83-2.05A(4) Quality Assurance
83-2.05B Materials
83-2.05B(1) General
83-2.05B(2) Reinforced Concrete
83-2.05B(3) Metal Components <\/td>\n<\/tr>\n
1019<\/td>\n83-2.05B(4) Coatings
83-2.05C Construction
83-2.05D Payment
83-2.06 CHAIN LINK RAILINGS
83-2.06A General
83-2.06B Materials <\/td>\n<\/tr>\n
1020<\/td>\n83-2.06C Construction
83-2.06D Payment
83-2.07 CABLE RAILINGS
83-2.07A General
83-2.07B Materials <\/td>\n<\/tr>\n
1021<\/td>\n83-2.07C Construction
83-2.07D Payment
83-2.08 TUBULAR HANDRAILINGS
83-2.08A General
83-2.08B Materials
83-2.08C Construction <\/td>\n<\/tr>\n
1022<\/td>\n83-2.08D Payment
83-2.09 PIPE HANDRAILINGS
83-2.09A General
83-2.09B Materials
83-2.09C Construction
83-2.09D Payment
83-2.10\u201383-2.14 RESERVED
83-3.01 GENERAL
83-3.01A Summary
83-3.01B Definitions <\/td>\n<\/tr>\n
1023<\/td>\n83-3.01C Submittals
83-3.01D Quality Assurance
83-3.01D(1) General
83-3.01D(2) Quality Control
83-3.01D(2)(a) General
83-3.01D(2)(b) Barrier Smoothness
83-3.01D(2)(c) Barrier Reinforcement Positions
83-3.01D(3) Department Acceptance
83-3.02 MATERIALS
83-3.02A General
83-3.02B Concrete
83-3.02B(1) General <\/td>\n<\/tr>\n
1024<\/td>\n83-3.02B(2) Concrete for Extrusion or Slip form Methods
83-3.02C Bar Reinforcing Steel
83-3.02D Steel Plates and Hardware
83-3.02E Granular Backfill
83-3.02F Type K Concrete Barrier Reflectors
83-3.02G Connection of a Concrete Barrier to a Structure
83-3.02H Type 60K Portable Concrete Barriers <\/td>\n<\/tr>\n
1025<\/td>\n83-3.03 CONSTRUCTION
83-3.03A General
83-3.03A(1) General
83-3.03A(2) Closing Gaps in Concrete Barriers
83-3.03A(3) Adjusting Barrier Height
83-3.03A(4) Locating Expansion Joints
83-3.03A(5) Placing Barriers
83-3.03A(6) Barrier Construction Methods
83-3.03A(6)(a) General
83-3.03A(6)(b) Cast-In-Place-with-Fixed-Forms Method
83-3.03A(6)(c) Extrusion or Slip form Method
83-3.03A(6)(c)(i) General <\/td>\n<\/tr>\n
1026<\/td>\n83-3.03A(6)(c)(ii) Placing Concrete
83-3.03A(6)(c)(iii) Placing Reinforcing Bars
83-3.03A(6)(c)(iv) Maintaining Barrier Grades
83-3.03A(6)(c)(v) Constructing Expansion Joints
83-3.03A(7) Finishing
83-3.03A(8) Curing <\/td>\n<\/tr>\n
1027<\/td>\n83-3.03A(9) Smoothness
83-3.03A(10) Installing Tubular Handrailings
83-3.03A(11) Installing Barrier Markers
83-3.03A(12) Installing Reflectors
83-3.03A(13) Placing Granular Backfill
83-3.03B Concrete Barriers at Existing Structures
83-3.03C Connection of a Concrete Barrier to a Structure
83-3.03D Concrete Barrier Transitions
83-3.03E Type 60K Portable Concrete Barriers <\/td>\n<\/tr>\n
1028<\/td>\n83-3.03F Wildlife Passage Ways
83-3.04 PAYMENT
83-4.01 GENERAL
83-4.01A General
83-4.01B Materials
83-4.01C Construction
83-4.01D Payment
83-4.02\u201383-4.10 RESERVED
83-11.01 GENERAL
83-11.01A General <\/td>\n<\/tr>\n
1029<\/td>\n83-11.01B Materials
83-11.01C Construction
83-11.01D Payment
83-11.02 EXISTING GUARDRAILS
83-11.02A General
83-11.02A(1) General
83-11.02A(2) Materials
83-11.02A(3) Construction
83-11.02A(4) Payment
83-11.02B Remove Guardrails
83-11.02B(1) General
83-11.02B(2) Materials
83-11.02B(3) Construction
83-11.02B(4) Payment
83-11.02C Salvage Guardrails
83-11.02C(1) General
83-11.02C(2) Materials
83-11.02C(3) Construction <\/td>\n<\/tr>\n
1030<\/td>\n83-11.02C(4) Payment
83-11.02D Reconstruct Guardrails
83-11.02E Adjust Guardrails
83-11.02F\u201383-11.02J Reserved
83-11.03 EXISTING METAL BRIDGE RAILINGS
83-11.03A General
83-11.03A(1) General
83-11.03A(2) Materials
83-11.03A(3) Construction
83-11.03A(4) Payment
83-11.03B Reconstruct Metal Bridge Railings
83-11.03B(1) General
83-11.03B(1)(a) Summary
83-11.03B(1)(b) Definitions
83-11.03B(1)(c) Submittals
83-11.03B(1)(d) Quality Assurance
83-11.03B(2) Materials
83-11.03B(3) Construction <\/td>\n<\/tr>\n
1031<\/td>\n83-11.03B(4) Payment
83-11.03C\u201383-11.03G Reserved
83-11.04\u201383-11.08 RESERVED <\/td>\n<\/tr>\n
1033<\/td>\n84 MARKINGS
84-1.01 GENERAL
84-1.02 MATERIALS
84-1.03 CONSTRUCTION
84-1.04 PAYMENT
84-2.01 GENERAL
84-2.01A Summary
84-2.01B Definitions
84-2.01C Submittals
84-2.01D Quality Assurance <\/td>\n<\/tr>\n
1034<\/td>\n84-2.02 MATERIALS
84-2.02A General
84-2.02B Thermoplastic
84-2.02C Paint
84-2.02D Glass Beads
84-2.02E Thermoplastic Traffic Stripes and Pavement Markings with Enhanced Wet-Night Visibility
84-2.02F Two-Component Painted Traffic Stripes and Pavement Markings <\/td>\n<\/tr>\n
1035<\/td>\n84-2.02G Recessed Two-Component Painted Traffic Stripes and Pavement Markings
84-2.02H Traffic Stripe and Pavement Marking Tape
84-2.02I\u201384-2.02M Reserved
84-2.03 CONSTRUCTION
84-2.03A General
84-2.03B Surface Preparation
84-2.03C Application of Stripes and Markings
84-2.03C(1) General <\/td>\n<\/tr>\n
1036<\/td>\n84-2.03C(2) Thermoplastic Traffic Stripes and Pavement Markings
84-2.03C(2)(a) General
84-2.03C(2)(b) Extruded Thermoplastic Traffic Stripes and Pavement Markings
84-2.03C(2)(c) Sprayable Thermoplastic Traffic Stripes and Pavement Markings
84-2.03C(2)(d) Recessed Thermoplastic Traffic Stripes and Pavement Markings <\/td>\n<\/tr>\n
1037<\/td>\n84-2.03C(2)(e) Thermoplastic Traffic Stripes and Pavement Markings with Enhanced Wet-Night Visibility
84-2.03C(3) Painted Traffic Stripes and Pavement Markings
84-2.03C(3)(a) General <\/td>\n<\/tr>\n
1038<\/td>\n84-2.03C(3)(b) Two-Component Painted Traffic Stripes and Pavement Markings <\/td>\n<\/tr>\n
1039<\/td>\n84-2.03C(3)(c) Recessed Two-Component Painted Traffic Stripes and Pavement Markings
84-2.03C(4) Reserved
84-2.03C(5)\u201384-2.03C(10) Reserved
84-2.04 PAYMENT
84-3.01\u201384-3.10 RESERVED
84-8.01 GENERAL
84-8.01A Summary
84-8.01B Definitions
84-8.01C Submittals
84-8.01D Quality Assurance
84-8.02 MATERIALS
84-8.03 CONSTRUCTION
84-8.03A General <\/td>\n<\/tr>\n
1040<\/td>\n84-8.03B Rumble Strips in Concrete Pavement
84-8.03C Rumble Strips in Asphalt Concrete Pavement
84-8.04 PAYMENT
84-9.01 GENERAL
84-9.02 MATERIALS
84-9.03 CONSTRUCTION
84-9.03A General
84-9.03B Remove Traffic Stripes and Pavement Markings
84-9.03C Remove Traffic Stripes and Pavement Markings Containing Lead
84-9.03D Remove Contrast Treatment <\/td>\n<\/tr>\n
1041<\/td>\n84-9.03E\u201384-9.03J Reserved
84-9.04 PAYMENT
85 RESERVED <\/td>\n<\/tr>\n
1043<\/td>\nDIVISION X ELECTRICAL WORK
86-88 RESERVED <\/td>\n<\/tr>\n
1045<\/td>\nDIVISION XI MATERIALS
89 AGGREGATE
89-1.01 GENERAL
89-1.02 MATERIALS
89-1.03 CONSTRUCTION
89-1.04 PAYMENT <\/td>\n<\/tr>\n
1047<\/td>\n90 CONCRETE
90-1.01 GENERAL
90-1.01A Summary
90-1.01B Definitions
90-1.01C Submittals
90-1.01C(1) General
90-1.01C(2) Aggregate Gradation
90-1.01C(3) Cementitious Materials
90-1.01C(4) Admixtures
90-1.01C(5) Curing Compound <\/td>\n<\/tr>\n
1048<\/td>\n90-1.01C(6) Mix Design
90-1.01C(7) Concrete Delivery
90-1.01C(8) Testing
90-1.01C(9) Stationary Mixer Certification
90-1.01C(10) Protecting Concrete
90-1.01D Quality Assurance
90-1.01D(1) General
90-1.01D(2) Cementitious Material Content <\/td>\n<\/tr>\n
1049<\/td>\n90-1.01D(3) Shrinkage
90-1.01D(4) Concrete Uniformity
90-1.01D(5) Compressive Strength
90-1.01D(5)(a) General <\/td>\n<\/tr>\n
1051<\/td>\n90-1.01D(5)(b) Prequalification
90-1.01D(6) Curing Compound <\/td>\n<\/tr>\n
1052<\/td>\n90-1.02 MATERIALS
90-1.02A General
90-1.02B Cementitious Materials
90-1.02B(1) General <\/td>\n<\/tr>\n
1053<\/td>\n90-1.02B(2) Cement
90-1.02B(3) Supplementary Cementitious Materials <\/td>\n<\/tr>\n
1055<\/td>\n90-1.02C Aggregates
90-1.02C(1) General <\/td>\n<\/tr>\n
1056<\/td>\n90-1.02C(2) Coarse Aggregate
90-1.02C(3) Fine Aggregate <\/td>\n<\/tr>\n
1057<\/td>\n90-1.02C(4) Aggregate Gradation
90-1.02C(4)(a) General
90-1.02C(4)(b) Coarse Aggregate Gradation <\/td>\n<\/tr>\n
1058<\/td>\n90-1.02C(4)(c) Fine Aggregate Gradation
90-1.02C(4)(d) Combined Aggregate Gradation
90-1.02D Water <\/td>\n<\/tr>\n
1059<\/td>\n90-1.02E Admixtures
90-1.02E(1) General
90-1.02E(2) Chemical Admixtures <\/td>\n<\/tr>\n
1060<\/td>\n90-1.02E(3) Air-Entraining Admixtures
90-1.02F Proportioning Concrete
90-1.02F(1) General
90-1.02F(2) Storage of Aggregates
90-1.02F(3) Proportioning Devices <\/td>\n<\/tr>\n
1061<\/td>\n90-1.02F(4) Proportioning
90-1.02F(4)(a) General <\/td>\n<\/tr>\n
1062<\/td>\n90-1.02F(4)(b) Proportioning and Dispensing Liquid Admixtures
90-1.02F(4)(c) Automatic Proportioning <\/td>\n<\/tr>\n
1063<\/td>\n90-1.02G Mixing and Transporting Concrete
90-1.02G(1) General
90-1.02G(2) Machine Mixing <\/td>\n<\/tr>\n
1064<\/td>\n90-1.02G(3) Transporting Mixed Concrete <\/td>\n<\/tr>\n
1065<\/td>\n90-1.02G(4) Time or Quantity of Mixing
90-1.02G(5) Hand Mixing <\/td>\n<\/tr>\n
1066<\/td>\n90-1.02G(6) Quantity of Water and Penetration or Slump
90-1.02H Concrete in Corrosive Environments <\/td>\n<\/tr>\n
1067<\/td>\n90-1.02I Concrete in Freeze-Thaw Areas
90-1.02I(1) General
90-1.02I(2) Materials
90-1.02I(2)(a) General
90-1.02I(2)(b) Concrete Exposed to Deicing Chemicals <\/td>\n<\/tr>\n
1068<\/td>\n90-1.02J Curing Compound
90-1.03 CONSTRUCTION
90-1.03A General
90-1.03B Curing Concrete
90-1.03B(1) General
90-1.03B(2) Water Method <\/td>\n<\/tr>\n
1069<\/td>\n90-1.03B(3) Curing Compound Method
90-1.03B(3)(a) General
90-1.03B(3)(b) Materials <\/td>\n<\/tr>\n
1070<\/td>\n90-1.03B(3)(c) Mixing
90-1.03B(3)(d) Application
90-1.03B(4) Waterproof Membrane Method <\/td>\n<\/tr>\n
1071<\/td>\n90-1.03B(5) Forms-In-Place Method
90-1.03C Protecting Concrete
90-1.04 PAYMENT
90-2.01 GENERAL
90-2.01A Summary
90-2.01B Definitions
90-2.01C Submittals <\/td>\n<\/tr>\n
1072<\/td>\n90-2.01D Quality Assurance
90-2.02 MATERIALS
90-2.02A General
90-2.02B Cementitious Material <\/td>\n<\/tr>\n
1073<\/td>\n90-2.02C Aggregate
90-2.02D Water
90-2.02E Production
90-2.03 CONSTRUCTION
90-2.04 PAYMENT
90-3.01 GENERAL
90-3.01A Summary <\/td>\n<\/tr>\n
1074<\/td>\n90-3.01B Definitions
90-3.01C Submittals
90-3.01C(1) General
90-3.01C(2) Volumetric Proportioning
90-3.01C(3) Certificate of Compliance
90-3.01C(4) Weighmaster Certificate
90-3.01C(5) Production Data <\/td>\n<\/tr>\n
1075<\/td>\n90-3.01D Quality Assurance
90-3.01D(1) General
90-3.01D(2) Penetration
90-3.01D(3) Aggregate Moisture
90-3.01D(4) Concrete Uniformity
90-3.02 MATERIALS
90-3.02A General <\/td>\n<\/tr>\n
1076<\/td>\n90-3.02B Volumetric Proportioning
90-3.02B(1) General
90-3.02B(2) Proportioning
90-3.02B(3) Mixer Requirements
90-3.02B(4) Mixer Calibration <\/td>\n<\/tr>\n
1077<\/td>\n90-3.02B(5) Mixing Concrete
90-3.03 CONSTRUCTION
90-3.04 PAYMENT <\/td>\n<\/tr>\n
1078<\/td>\n90-4.01 GENERAL
90-4.01A Summary
90-4.01B Definitions
90-4.01C Submittals
90-4.01C(1) General
90-4.01C(2) Certificates of Compliance
90-4.01C(3) Precast Concrete Quality Control Plan <\/td>\n<\/tr>\n
1079<\/td>\n90-4.01C(4) Daily Production Log
90-4.01C(5) Precast Concrete Report
90-4.01D Quality Assurance
90-4.01D(1) General <\/td>\n<\/tr>\n
1080<\/td>\n90-4.01D(2) Quality Control
90-4.01D(2)(a) General
90-4.01D(2)(b) Quality Control Meeting
90-4.01D(2)(c) Sampling, Testing, and Inspecting <\/td>\n<\/tr>\n
1081<\/td>\n90-4.01D(3) Department Acceptance
90-4.02 MATERIALS <\/td>\n<\/tr>\n
1082<\/td>\n90-4.03 CONSTRUCTION <\/td>\n<\/tr>\n
1083<\/td>\n90-4.04 PAYMENT
90-5.01 GENERAL
90-5.01A Summary
90-5.01B Definitions
90-5.01C Submittals
90-5.01D Quality Assurance
90-5.01D(1) General
90-5.01D(2) Quality Control
90-5.01D(2)(a) General
90-5.01D(2)(b) Compressive Strength <\/td>\n<\/tr>\n
1084<\/td>\n90-5.01D(2)(c) Prequalification of Mix Design
90-5.01D(2)(d) Mock-up <\/td>\n<\/tr>\n
1085<\/td>\n90-5.01D(2)(e) Field Quality Control
90-5.01D(2)(e)(i) General
90-5.01D(2)(e)(ii) Fine Aggregate Moisture Content
90-5.01D(2)(e)(iii) Slump Flow and Visual Stability Index
90-5.01D(3) Department Acceptance
90-5.02 MATERIALS
90-5.03 CONSTRUCTION
90-5.04 PAYMENT
90-6.01 GENERAL
90-6.01A Summary
90-6.01B Definitions
90-6.01C Submittals
90-6.01C(1) General
90-6.01C(2) Mix Design <\/td>\n<\/tr>\n
1086<\/td>\n90-6.01D Quality Assurance
90-6.01D(1) General
90-6.01D(2) Quality Control
90-6.01D(2)(a) General
90-6.01D(2)(b) Prequalification
90-6.01D(2)(c) Unit Weight of Fresh Concrete
90-6.01D(2)(d) Air-Dry Unit Weight
90-6.01D(3) Department Acceptance
90-6.01D(3)(a) General
90-6.01D(3)(b) Penetration
90-6.01D(3)(c) Air Content
90-6.01D(3)(d) Compressive Strength
90-6.02 MATERIALS
90-6.02A General <\/td>\n<\/tr>\n
1087<\/td>\n90-6.02B Aggregate
90-6.02C Proportioning
90-6.03 CONSTRUCTION
90-6.04 PAYMENT <\/td>\n<\/tr>\n
1089<\/td>\n91 PAINT
91-1.01 GENERAL
91-1.01A Summary
91-1.01B Definitions
91-1.01C Submittals
91-1.01D Quality Assurance
91-1.02 MATERIALS
91-1.03 CONSTRUCTION
91-1.04 PAYMENT
91-2.01 GENERAL
91-2.02 MATERIALS
91-2.02A General
91-2.02B Exterior-Grade Latex Paint <\/td>\n<\/tr>\n
1090<\/td>\n91-2.02C Moisture-Cured Polyurethane Coating
91-2.03 CONSTRUCTION
91-2.04 PAYMENT
91-3.01 GENERAL
91-3.02 MATERIALS
91-3.02A General
91-3.02B Latex-Base Wood Primer
91-3.02C Latex-Base Paint for Exterior Wood
91-3.03 CONSTRUCTION
91-3.04 PAYMENT
91-4.01 GENERAL
91-4.02 MATERIALS
91-4.02A General <\/td>\n<\/tr>\n
1091<\/td>\n91-4.02B Acrylic Emulsion Paint for Exterior Masonry
91-4.02C\u201391-4.02F Reserved
91-4.03 CONSTRUCTION
91-4.04 PAYMENT <\/td>\n<\/tr>\n
1093<\/td>\n92 ASPHALT BINDERS
92-1.01 GENERAL
92-1.01A Summary
92-1.01B Definitions
92-1.01C Submittals
92-1.01D Quality Assurance
92-1.01D(1) General
92-1.01D(2) Certification
92-1.01D(3) Sampling
92-1.02 MATERIALS
92-1.02A General
92-1.02B Performance Grade Asphalt Binders <\/td>\n<\/tr>\n
1096<\/td>\n92-1.03 CONSTRUCTION
92-1.04 PAYMENT <\/td>\n<\/tr>\n
1102<\/td>\n93 RESERVED <\/td>\n<\/tr>\n
1103<\/td>\n94 ASPHALTIC EMULSIONS
94-1.01 GENERAL
94-1.01A Summary
94-1.01B Definitions
94-1.01C Submittals
94-1.01D Quality Assurance
94-1.02 MATERIALS
94-1.02A General
94-1.02B Anionic Asphaltic Emulsions <\/td>\n<\/tr>\n
1105<\/td>\n94-1.02C Cationic Asphaltic Emulsions <\/td>\n<\/tr>\n
1106<\/td>\n94-1.02D Polymer Modified Asphaltic Emulsions <\/td>\n<\/tr>\n
1107<\/td>\n94-1.02E Quick-setting Asphaltic Emulsions <\/td>\n<\/tr>\n
1108<\/td>\n94-1.03 CONSTRUCTION
94-1.04 PAYMENT <\/td>\n<\/tr>\n
1111<\/td>\n95 EPOXY
95-1.01 GENERAL
95-1.01A Summary
95-1.01B Definitions
95-1.01C Submittals
95-1.01D Quality Assurance
95-1.02 MATERIALS
95-1.02A General
95-1.02B Packaging, Labeling, and Storing
95-1.02C Epoxy Binder
95-1.02D Epoxy Adhesive for Bonding Freshly Mixed Concrete to Hardened Concrete <\/td>\n<\/tr>\n
1112<\/td>\n95-1.02E Rapid Set Epoxy Adhesive for Pavement Markers
95-1.02F Standard Set Epoxy Adhesive for Pavement Markers <\/td>\n<\/tr>\n
1113<\/td>\n95-1.02G Epoxy Sealant for Inductive Loops
95-1.02H Epoxy Resin Adhesive for Pressure Injection Grouting of Concrete Pavement
95-1.03 CONSTRUCTION <\/td>\n<\/tr>\n
1114<\/td>\n95-1.04 PAYMENT <\/td>\n<\/tr>\n
1115<\/td>\n96 GEOSYNTHETICS
96-1.01 GENERAL
96-1.01A Summary
96-1.01B Definitions
96-1.01C Submittals
96-1.01C(1) General
96-1.01C(2) Geotechnical Subsurface Reinforcement
96-1.01D Quality Assurance
96-1.02 MATERIALS
96-1.02A General
96-1.02B Filter Fabric <\/td>\n<\/tr>\n
1116<\/td>\n96-1.02C Geocomposite Wall Drain
96-1.02D Geotechnical Subsurface Reinforcement
96-1.02D(1) General
96-1.02D(2) Long Term Design Strength <\/td>\n<\/tr>\n
1117<\/td>\n96-1.02E Silt Fence Fabric
96-1.02F Gravel-Filled Bag
96-1.02G Sediment Filter Bag <\/td>\n<\/tr>\n
1118<\/td>\n96-1.02H Temporary Cover
96-1.02I Rock Slope Protection Fabric
96-1.02J Paving Fabric <\/td>\n<\/tr>\n
1119<\/td>\n96-1.02K Paving Mat
96-1.02L Paving Grid
96-1.02M Paving Geocomposite Grid
96-1.02N Geocomposite Strip Membrane <\/td>\n<\/tr>\n
1120<\/td>\n96-1.02O Subgrade Enhancement Geotextile
96-1.02P Biaxial Geogrid <\/td>\n<\/tr>\n
1121<\/td>\n96-1.02Q Geosynthetic Bond Breaker
96-1.02R\u201396-1.02Y Reserved
96-1.03 CONSTRUCTION
96-1.04 PAYMENT
97\u201398 RESERVED <\/td>\n<\/tr>\n
1123<\/td>\nDIVISION XII BUILDING CONSTRUCTION
99 BUILDING CONSTRUCTION <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

California State Transportation Agency – Standard Specifications<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
CA<\/b><\/a><\/td>\n2015<\/td>\n1155<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":186324,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2720],"product_tag":[],"class_list":{"0":"post-186322","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ca","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/186322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/186324"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=186322"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=186322"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=186322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}