ASME P30.1 2014
$98.04
ASME P30.1 Planning for Load Handling Activities
Published By | Publication Date | Number of Pages |
ASME | 2014 | 32 |
This standard establishes planning considerations and practices that apply to Load Handling Equipment (LHE), other associated equipment and activities when moving loads vertically or horizontally. The planning guidance contained in this standard is divided into two categories dependent upon the nature of the load handling activity and the degree of exposure to the issues that impact safety. The categories are designated as Standard Lift Plan and Critical Lift Plan. This standard does not preclude the user of this standard from creating subcategories based on their specific load handling activity considerations.
PDF Catalog
PDF Pages | PDF Title |
---|---|
5 | CONTENTS |
6 | FOREWORD |
7 | COMMITTEE ROSTER |
8 | INTRODUCTION SECTION I: CHARTER FOR P30 — PLANNING FOR THE USE OF CRANES, DERRICKS, HOISTS, CABLEWAYS, AERIAL DEVICES, AND LIFTING ACCESSORIES COMMITTEE SECTION II: PURPOSE SECTION III: USE BY REGULATORY AGENCIES SECTION IV: EFFECTIVE DATE SECTION V: REQUIREMENTS AND RECOMMENDATIONS SECTION VI: REQUESTS FOR REVISION SECTION VII: REQUESTS FOR INTERPRETATION SECTION VIII: ADDITIONAL GUIDANCE |
11 | Chapter 1 Scope and Definitions 1-1 SCOPE 1-2 DEFINITIONS |
12 | Chapter 2 Load Handling Activity Considerations and Plan Categories 2-1 LOAD HANDLING ACTIVITY CONSIDERATIONS |
13 | Figure Fig. 2-1-1 Load Handling Activity Categorization |
14 | 2-2 PLAN CATEGORIES 2-2.1 Standard Lift Plan 2-2.2 Critical Lift Plan |
15 | Chapter 3 Personnel and Responsibilities 3-1 PERSONNEL QUALIFICATION/COMPETENCE 3-2 ROLES AND RESPONSIBILITIES |
16 | Chapter 4 Standard Lift Plan 4-1 INTRODUCTION 4-2 STANDARD LIFT PLAN DEVELOPMENT 4-3 PRE-LIFT REVIEW 4-4 EXECUTING THE STANDARD LIFT PLAN 4-5 POST-LIFT REVIEW |
17 | Chapter 5 Critical Lift Plan 5-1 INTRODUCTION 5-2 CRITICAL LIFT PLAN DEVELOPMENT 5-2.1 The Load 5-2.2 Load Handling Equipment 5-2.3 Rigging |
18 | 5-2.4 LHE and Load Travel Path 5-2.5 Personnel 5-2.6 Site, Services, and Ancillary Equipment 5-2.7 Communication System 5-2.8 Site Control 5-2.9 Contingency Considerations 5-2.10 Emergency Action Plan 5-3 PRE-LIFT MEETING |
19 | 5-4 EXECUTING THE CRITICAL LIFT PLAN 5-4.1 Preparation for the Load Handling Activity 5-4.2 Initiating the Load Handling Activity 5-4.3 During the Load Handling Activity 5-5 POST-LIFT REVIEW |
21 | NONMANDATORY APPENDIX A EXAMPLE LIFT PLAN A-1 INTRODUCTION A-2 LIFT DATA SHEET INSTRUCTIONS AND COMMENTARY A-2.1 General A-2.2 Example Data Sheet A-2.3 Completing the Example LDS A-2.3.1 Payload and Crane Details Sections. A-2.3.2 Load Details. |
22 | A-2.3.3 Crane Capacities. A-2.3.4 Document Attachments. A-2.3.5 Notes. A-2.3.6 Signatures and Approvals. |
28 | NONMANDATORY APPENDIX B INDUSTRY REFERENCES |