Shopping Cart

No products in the cart.

ACI 506.5 2022

$42.79

ACI PRC-506.5-22: Specifying Underground Shotcrete – Guide

Published By Publication Date Number of Pages
ACI 2022
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document provides a guide for owners, contractors, designers, and testing, specifying, and inspection organizations engaged in the application of shotcrete for underground support. The guide provides general information for the selection of constituent materials, and methods to proportion shotcrete. Typical methods of batching, mixing, and handling of proportioned shotcrete materials are detailed along with shotcrete placement methods and equipment. Keywords: acceptance criteria; batching; inspection; methods of payment; mine(s); mixing; mixture proportioning; placement; quality assurance; quality control; safety; shotcrete; testing; tunneling.

PDF Catalog

PDF Pages PDF Title
3 TITLE PAGE
5 CHAPTER 1—INTRODUCTION AND SCOPE
1.1—Introduction
6 1.2—Scope
7 CHAPTER 2—NOTATION AND DEFINITIONS
2.1—Notation
2.2—Definitions
8 CHAPTER 3—SUBMITTALS
3.1—Submittal process
9 3.2—Recommended specifications
CHAPTER 4—MATERIALS
4.1—Accelerators
10 4.2—Recommended specifications
12 CHAPTER 5—ANCHORAGE AND REINFORCEMENT
5.1—Composite support systems
13 5.2—Shotcrete with pattern rock bolts or anchors
5.3—Shotcrete with rock bolts, friction stabilizers, and welded wire reinforcement
14 5.4—Fiber-reinforced shotcrete
15 5.5—Shotcrete with lattice girders
16 5.6—Shotcrete with conventional steel sets
5.7—Recommended specifications
17 CHAPTER 6—MATERIALS HANDLING AND STORAGE
6.1—General
6.2—Temperature considerations
18 6.3—Recommended specifications
CHAPTER 7—SHOTCRETE MIXTURE PROPORTIONING
7.1—General
7.2—Mixture proportions by trial batching or historical data submissions
7.3—In-place mixture proportions
19 7.4—Dry-mix shotcrete
20 7.5—Wet-mix shotcrete
22 7.6—Recommended specifications
CHAPTER 8—PERFORMANCE REQUIREMENTS
8.1—General
8.2—Water-cementitious materials ratio
8.3—Air content
23 8.4—Slump
8.5—Boiled absorption and permeable voids
8.6—Compressive strength
8.7—Flexural strength and toughness
8.8—Early-age strength
24 8.9—Other tests
8.10—Bond strength
8.11—Fire-induced explosive spalling protection
8.12—Recommended specifications
25 CHAPTER 9—QUALITY ASSURANCE AND QUALITY CONTROL
9.1—General
26 9.2—Recommended specifications

CHAPTER 10—PRECONSTRUCTION TRIALS AND TESTING
10.1—General
10.2—Recommended specifications
28 CHAPTER 11—CONSTRUCTION ACCEPTANCE INSPECTION
11.1—General
11.2—Acceptance inspection
30 11.3—Specific inspection and testing quality control requirements for underground shotcrete
31 11.4—Cold placement conditions
11.5—Hot placement conditions
11.6—Shotcrete acceptance and rejection
32 11.7—Recommended specifications
34 11.8—Recommended QC Inspection and Testing Checklist
35 CHAPTER 12—BATCHING, MIXING, AND SUPPLY
12.1—Handling of bulk bin-bags
12.2—Quality control considerations
12.3—Recommended specifications
37 CHAPTER 13—PLACING EQUIPMENT
13.1—General
13.2—Pumps for wet-mix
13.3—Guns for dry-mix
38 13.4—Nozzle systems
13.5—Remote-controlled spraying
39 13.6—Recommended specifications
40 CHAPTER 14—AUXILIARY EQUIPMENT
14.1—Air supply
41 14.2—Recommended specifications
42 CHAPTER 15—SAFETY
15.1—General
15.2—Underground safety
15.3—Required personal safety equipment
43 15.4—View of shotcrete work
15.5—Communications
44 15.6—Nonpersonal safety equipment
15.7—Recommended specifications
45 CHAPTER 16—PREPARATION FOR SHOTCRETING AND GROUNDWATER CONTROL
16.1—General
16.2—Factors affecting shotcrete adhesion and bonding
46 16.3—Surface preparation
16.4—Groundwater
47 16.5—Recommended specifications
48 CHAPTER 17—GROUND REINFORCEMENT INSTALLATION
17.1—General
17.2—Rock bolt installation
17.3—Steel set installation
17.4—Lattice girder installation
49 17.5—Face support
17.6—Recommended specifications
CHAPTER 18—SHOTCRETE APPLICATION
18.1—Methods used to control thickness
18.2—Cover, alignment, and tolerance
50 18.3—Recommended specifications
52 CHAPTER 19—CURING AND PROTECTION
19.1—General
19.2—Protection
53 19.3—Recommended specifications
54 CHAPTER 20—SHOTCRETE FOR REPAIR AND REHABILITATION OF UNDERGROUND STRUCTURES
20.1—General
20.2—Materials selection
55 20.3—Shotcrete placement methods for repair
20.4—Quality assurance requirements for rehabilitation of underground structures
20.5—Repair considerations
56 20.6—Recommended specifications
CHAPTER 21—MEASUREMENT AND PAYMENT
21.1—Basis for payment
57 21.2—Recommended specifications
CHAPTER 22—REFERENCES
58 Authored documents
ACI 506.5 2022
$42.79