ASME PTC 6 04 2004
$98.04
ASME PTC 6 Steam Turbines
Published By | Publication Date | Number of Pages |
ASME | 2004 | 114 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | CONTENTS |
6 | Figures |
7 | Tables |
8 | NOTICE |
9 | FOREWORD |
11 | COMMITTEE ROSTER |
13 | CORRESPONDENCE WITH THE PTC 6 COMMITTEE |
14 | Section 1 Object and Scope 1- 1 OBJECT 1- 2 SCOPE 1- 3 FULL- SCALE AND ALTERNATIVE TESTS |
15 | 1- 4 CONFORMANCE TO CODE 1- 5 ADDITIONAL REQUIREMENTS AND REFERENCES |
16 | Section 2 Definitions and Description of Terms 2- 1 SYMBOLS 2- 2 ABBREVIATIONS |
17 | 2- 3 SUBSCRIPTS |
18 | 2-1 Temperature-Entropy Diagrams |
19 | 2- 4 DEFINITIONS 2- 5 TABLE FOR CONVERSION TO SI UNITS |
20 | Section 3 Guiding Principles 3- 1 PLANNING FOR TEST 3- 2 ITEMS ON WHICH AGREEMENT SHALL BE REACHED |
21 | 3- 3 TIMING OF ACCEPTANCE TEST |
22 | 3- 4 GENERAL TEST REQUIREMENTS |
23 | 3- 5 ISOLATION OF THE CYCLE |
24 | 3- 6 LOCATION OF TURBINE VALVE POINTS |
25 | 3- 7 NUMBER OF TEST RUNS 3- 8 TESTING CONDITIONS |
26 | 3-1 Permissible Deviation of Variables |
27 | 3- 9 FREQUENCY OF OBSERVATIONS AND DURATION OF TEST RUNS |
28 | 3- 10 CALIBRATION OF INSTRUMENTS 3-2 Definitions and Notes to Fig. 3-1 |
29 | 3-1 Required Number of Readings (NR) Corresponding to 0.05% Effect on the Test Results Due to Scatter |
30 | 3- 11 STEAM PRESSURE AND TEMPERATURE MEASUREMENTS 3- 12 CORRECTIONS 3- 13 METHODS OF COMPARING TEST RESULTS |
31 | 3-2 Corrected First Stage Inlet (Bowl) Pressure vs. Corrected Throttle Flow for Use in Determining Predicted VWO Throttle Flow |
32 | 3- 14 TOLERANCES 3-3 Corrected Throttle Flow vs. Corrected Test Load for Use in Determining Predicted VWO Load |
33 | Section 4 Instruments and Methods of Measurement 4- 1 GENERAL |
34 | 4- 2 MEASUREMENT OF MECHANICAL OUTPUT |
35 | 4- 3 MEASUREMENT OF FEEDWATER PUMP POWER |
36 | 4-1 Typical Instrumentation for Measurement of Feedwater Pump Power |
37 | 4- 4 MEASUREMENT OF ELECTRICAL POWER |
38 | 4-2(a) Wye Generator–3-Phase, 3-Wire 4-2(b) Delta Generator–3-Phase, 3-Wire 4-2(c) Wye Generator–3-Phase, 4-Wire |
39 | 4-2(d) Typical Connections for Measuring Electric Power Output by the Three-Wattmeter Method |
40 | 4- 5 A- C GENERATOR TEST INSTRUMENTS |
41 | 4- 6 D- C GENERATOR TEST INSTRUMENTS 4-2(e) Direct Current Series Generator |
42 | 4- 7 CALIBRATION OF ELECTRICAL INSTRUMENTS 4- 8 PRIMARY FLOW MEASUREMENT 4-2(f) Direct Current Shunt Generator 4-2(g) Direct Current Short-Shunt Compound Generator |
43 | 4-3(a) Primary Flow Section With Plate-Type Flow Straightener (Recommended) 4-1 Hole Coordinates for Perforated or Tubed Plate |
44 | 4-3(b) Primary Flow Section With Tube-Type Flow Straightener 4-4 Throat-Tap Flow Nozzle |
45 | 4-5 Perforated or Tubed Plate Flow Straightener With Nonuniform Hole Distribution |
46 | 4-6 Throat-Tap Nozzle Required Surface Finish to Produce a Hydraulically Smooth Surface |
47 | 4-7(a) Throat-Tap Nozzle With Optional Diffusing Cone 4-7(b) Boring in Flow Section Upstream of Nozzle |
48 | 4-8 Primary Flow Section for Welded Assembly |
49 | 4-9 Inspection Port Assembly |
50 | 4-10 Reference Curve for Nozzle Calibration 4-2 Reference Nozzle Coefficients of Discharge |
51 | 4- 9 INSTALLATION OF FLOW SECTION |
52 | 4-11(a) Location and Type of Test Instrumentation (High-Pressure Feedwater Heater Supplied With Superheated Extraction Steam) |
53 | 4-11(b) Location and Type of Test Instrumentation (Heater Drains Cascading to Condenser; Tracer Technique for Flow Measurement) |
54 | 4-11(c) Location and Type of Test Instrumentation (Heater Drains Pumped Forward; Tracer Technique for Flow Measurement) |
55 | 4-11(d) Location and Type of Test Instrumentation for Alternative Test Procedure-Fossil |
56 | 4-11(e) Location and Type of Test Instrumentation for Alternative Test Procedure—Nuclear |
57 | 4-12 Water Leg Correction for Flow Measurement 4-13 Flow Element Tap Locations for Horizontal Pipes |
58 | 4- 10 FLOW CHARACTERISTICS 4- 11 OTHER FLOW- MEASURING DEVICES 4- 12 MEASUREMENT OF STEAM FLOW 4- 13 MEASUREMENT OF WATER FLOW USING TANKS |
59 | 4- 14 DIFFERENTIAL- PRESSURE MEASUREMENTS 4-14(a) Connection Between Calibrated Flow Section and Transducer |
60 | 4-14(b) Connection Between Calibrated Flow Section and Manometer |
61 | 4- 15 ENTHALPY- DROP METHOD FOR STEAM- FLOW DETERMINATION 4-15 Connection Between Flow Section and Transducer in Area of High Radioactivity |
62 | 4- 16 ADDITIONAL FLOW MEASUREMENTS 4-16 Loop-Seal Piping Arrangement for Moisture Separator Drain Flow Measurements |
63 | 4-17 Effect of HP-IP Leakage on Measured IP Efficiency |
64 | 4- 17 MEASUREMENT OF PRESSURE |
65 | 4-18 Connection Between Pressure Source and Transducer |
67 | 4-19 Connection Between Pressure Source and Manometer Air-Filled Connection |
68 | 4-20 Connection Between Pressure Source and Transducer/Water-Filled Connection |
69 | 4-21 Basket Tip |
70 | 4- 18 MEASUREMENT OF TEMPERATURE 4-22 Guide Plate |
72 | 4- 19 METHODS OF DETERMINING STEAM QUALITY |
74 | 4-23 Throttle Steam Quality Calculations for Pressurized Water Reactor |
75 | 4-24 Throttle Steam Quality Calculations for Boiling Water Reactor |
76 | 4-25 Typical Installation of Injection and Sampling Points 4-26 Oxygen Content of Sample |
77 | 4- 20 MEASUREMENT OF SPEED 4- 21 MEASUREMENT OF TIME 4- 22 MEASUREMENT OF WATER LEVELS |
78 | Section 5 Computation of Results 5- 3 TEST DATA REDUCTION 5- 1 DEVIATIONS FROM SPECIFIED OPERATING CONDITIONS 5- 2 TEST RESULTS |
79 | 5- 4 THROTTLE- STEAM FLOW 5- 5 CAPABILITY 5- 6 STEAM RATE 5- 7 HEAT RATE |
80 | 5- 8 CORRECTION OF THE TEST RESULTS TO SPECIFIED CONDITIONS 5- 9 CALCULATION OF TURBINE EXHAUST STEAM ENTHALPY |
82 | 5-1 Typical Saturated Steam Turbine Expansion Line |
83 | 5- 10 TURBINE EFFICIENCY AND EFFECTIVENESS 5-2 Components of Effectiveness |
84 | 5- 11 CALCULATION OF GROUP 1 CORRECTIONS 5- 12 CALCULATION OF GROUP 2 CORRECTIONS |
85 | 5- 13 AVERAGE PERFORMANCE |
86 | Section 6 Report of Tests 6- 1 TURBINE GENERATOR ACCEPTANCE TEST REPORTS |
87 | Section 7 Required Number of Readings 7- 1 INTRODUCTION 7- 2 ILLUSTRATIONS 7- 3 EFFECT OF FLOW NOZZLE DIFFERENTIALS |
88 | 7- 4 EFFECT OF THROTTLE STEAM TEMPERATURE |
89 | 7- 5 COMBINING READINGS FROM MORE THAN ONE SENSOR OR INSTRUMENT 7- 6 ESTIMATED EFFECT OF ALL READINGS FOR THE ENTIRE TEST PERIOD 7- 7 DEVELOPMENT OF FIG. 3- 1 7- 8 STANDARD DEVIATION 7- 9 DISCUSSION ON FIG. 7- 1 7- 10 STANDARD DEVIATION OF THE AVERAGES 7- 11 UNCERTAINTY LIMIT |
90 | 7-1 Standard Deviation Range vs. Sample Size 7-2 Slope of Superheated Steam Enthalpy at Constant Temperature |
91 | 7-3 Slope of Superheated Steam Enthalpy at Constant Pressure 7-4 Slope of Saturated Liquid Enthalpy (Temperature) |
92 | 7-5 Slope of Saturated Liquid Enthalpy (Pressure) 7-6 Typical Throttle Pressure Correction Curve 7-7 Typical Throttle Temperature Correction Curve |
93 | 7- 12 FORMULA FOR FOR NR = Na LINE IN FIG. 3-1 7-8 Typical Exhaust Pressure Correction Curve |
94 | 7- 13 DEVELOPMENT OF Na LINES IN FIG. 3-1 |
95 | Section 8 Group 1 Corrections for the Alternative Procedure 8- 1 CORRECTIONS TO SPECIFIED CONDITIONS 8- 2 CYCLE PARAMETERS 8- 3 CORRECTION FACTOR CURVES 8- 4 SAMPLE GROUP 1 CORRECTION CURVES FOR FOSSIL UNITS |
96 | 8-1 Typical 320 MW Single-Stage Reheat Regenerative Cycle |
97 | 8-2 Final Feedwater Temperature Correction 8-3 Auxiliary Extraction Correction (Extraction Downstream of Reheater) |
98 | 8-4 Correction for Auxiliary Extraction From Cold Reheat 8-5 Corrections for Main Steam and Reheat Steam Desuperheating Flow |
99 | 8- 5 SAMPLE GROUP 1 CORRECTION CURVES FOR NUCLEAR UNITS 8-6 Condensate Subcooling Correction 8-7 Condenser Make-up Correction |
100 | 8-1 Equations for Use in Curves for Group 1 Corrections |
101 | 8-8 Typical Light-Water Moderated Nuclear Cycle |
102 | 8-9 Final Feedwater Temperature Correction for Nuclear Cycles 8-10 Auxiliary Turbine Extraction Correction for Nuclear Cycles |
103 | 8-11 Condensate Subcooling Correction for Nuclear Cycles 8-12 Condensate Make-up Correction for Nuclear Cycles |
104 | Section 9 Rationale for Heat Rate Testing Uncertainty 9- 1 OBJECT 9- 2 SCOPE 9- 3 HEAT RATE TEST 9- 4 MEASUREMENT ERRORS 9- 5 VARIATIONS 9- 6 UNCERTAINTY VALUES 9- 7 TYPICAL TEST UNCERTAINTY CALCULATIONS |
105 | 9-1 Example of a Full-Scale Test Uncertainty Calculation Fossil Condensate Primary Flow Measurement |
106 | 9-2 Example of an Alternative Test Uncertainty Calculation Fossil Feedwater Primary Flow Measurement 9-3 Example of a Full-Scale Test Uncertainty Calculation Nuclear Condensate Primary Flow Measurement |
107 | 9-4 Example of an Alternative Test Uncertainty Calculation Nuclear Feedwater Primary Flow Measurement |
108 | NONMANDATORY APPENDIX A REFERENCES |
109 | INDEX |