{"id":242400,"date":"2024-10-19T15:53:21","date_gmt":"2024-10-19T15:53:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-630752019\/"},"modified":"2024-10-25T10:45:51","modified_gmt":"2024-10-25T10:45:51","slug":"bs-en-630752019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-630752019\/","title":{"rendered":"BS EN 63075:2019"},"content":{"rendered":"
IEC 63075:2019 specifies test methods and requirements for high-temperature superconducting (HTS) AC power cable systems, cables and their accessories, for fixed installations, for rated voltages from 6 kV ( U<\/em> m<\/sub> = 7,2 kV) up to and including 500 kV ( U<\/em> m<\/sub> = 550 kV). The requirements apply to single-core, three-core and three-phase concentric cables with cold dielectric and their accessories that are not intended for fault current limitation purposes. This document does not cover special cables and their accessories, such as fault current limiting cables or submarine cables, for which modifications to the standard tests may be necessary or special test conditions may need to be devised. This document does not cover test methods and requirements for the cooling system.<\/p>\n Superconducting AC power cables and their accessories for rated voltages from 6 kV to 500 kV. Test methods and requirements<\/b><\/p>\nPDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 2<\/td>\n undefined <\/td>\n<\/tr>\n \n 4<\/td>\n CONTENTS <\/td>\n<\/tr>\n \n 8<\/td>\n FOREWORD <\/td>\n<\/tr>\n \n 10<\/td>\n INTRODUCTION <\/td>\n<\/tr>\n \n 11<\/td>\n 1 Scope
2 Normative references <\/td>\n<\/tr>\n\n 12<\/td>\n 3 Terms and definitions
3.1 Definitions of dimensional values (thicknesses, cross-sections, etc.)
3.2 Definitions concerning tests <\/td>\n<\/tr>\n\n 13<\/td>\n 3.3 Other definitions (general design and cryogenic system) <\/td>\n<\/tr>\n \n 15<\/td>\n 4 Voltage and current designations
4.1 Rated voltages
4.2 Rated operating current <\/td>\n<\/tr>\n\n 16<\/td>\n 5 Cable materials
5.1 Cable conductor materials
5.2 Cable insulating materials (dielectric insulation)
5.3 Cable screen materials
5.4 Cable cryostat materials (thermal insulation)
5.5 Cable oversheathing materials (outside cryostat)
6 Cable characteristics <\/td>\n<\/tr>\n\n 17<\/td>\n 7 Accessory characteristics <\/td>\n<\/tr>\n \n 18<\/td>\n 8 Test conditions
8.1 Ambient temperature
8.2 Frequency and waveform of power frequency test voltages
8.3 Wave form of impulse test voltages
8.3.1 Lightning impulse voltage
8.3.2 Switching impulse voltage
8.4 Relationship of test voltages to rated voltages <\/td>\n<\/tr>\n\n 19<\/td>\n 8.5 Cryogen temperature and pressure
9 Routine tests on cables and on prefabricated accessories
9.1 General
9.1.1 Tests on cable core samples
9.1.2 Tests on cable cryostat
9.1.3 Tests on prefabricated accessories <\/td>\n<\/tr>\n\n 20<\/td>\n 9.2 AC voltage test for cable followed by partial discharge test
9.2.1 General
9.2.2 Procedure
9.2.3 Requirement
9.3 Critical current measurement
9.3.1 General
9.3.2 Procedure <\/td>\n<\/tr>\n\n 21<\/td>\n 9.3.3 Requirement
9.4 Pressure test
9.4.1 General
9.4.2 Procedure
9.4.3 Requirement
9.5 Vacuum leak test
9.5.1 General
9.5.2 Procedure
9.5.3 Requirement
9.6 Electrical test on oversheath of the cable
9.7 Tests on prefabricated accessories
9.7.1 Voltage test followed by partial discharge test <\/td>\n<\/tr>\n\n 22<\/td>\n 9.7.2 Pressure test and vacuum leak test
10 Sample tests on cables
10.1 General
10.2 Frequency of tests
10.3 Repetition of tests
10.4 Conductor examination <\/td>\n<\/tr>\n\n 23<\/td>\n 10.5 Measurement of thickness of cable insulation
10.5.1 General
10.5.2 Procedure
10.5.3 Requirement
10.6 Measurement of thickness of oversheath
10.6.1 General
10.6.2 Requirement
10.7 Measurement of diameters
10.8 Measurement of capacitance <\/td>\n<\/tr>\n\n 24<\/td>\n 10.9 Lightning impulse voltage test
11 Sample tests on accessories
11.1 Tests on components
11.2 Tests on complete accessory <\/td>\n<\/tr>\n\n 25<\/td>\n 12 Type tests on cable systems
12.1 General
12.2 Range of type approval <\/td>\n<\/tr>\n\n 26<\/td>\n 12.3 Summary of type tests
12.4 Electrical type tests on complete cable systems
12.4.1 Test voltage values
12.4.2 Tests and sequence of tests <\/td>\n<\/tr>\n\n 27<\/td>\n 12.4.3 Bending test
12.4.4 Critical current measurement
12.4.5 Pressure test <\/td>\n<\/tr>\n\n 28<\/td>\n 12.4.6 Thermal cycle test
12.4.7 Partial discharge test
12.4.8 Tan \u03b4 measurement
12.4.9 Load cycle voltage test
12.4.10 Impulse voltage tests <\/td>\n<\/tr>\n\n 29<\/td>\n 12.4.11 Examination of cable and accessories
12.5 Non-electrical type tests on cable components and on complete cable
12.5.1 Overview on non-electrical type tests <\/td>\n<\/tr>\n\n 30<\/td>\n 12.5.2 Check of cable construction
12.5.3 Tests for determining the mechanical properties of oversheaths before and after ageing
12.5.4 Loss of mass test on PVC oversheaths of type ST2
12.5.5 Test on PVC oversheaths (ST1 and ST2) at low temperature <\/td>\n<\/tr>\n\n 31<\/td>\n 12.5.6 Heat shock test for PVC oversheaths (ST1 and ST2)
12.5.7 Measurement of carbon black content of black PE oversheaths (ST3 and ST7)
12.5.8 Test under fire conditions
12.5.9 Pressure test of cable cryostat <\/td>\n<\/tr>\n\n 32<\/td>\n 12.5.10 Pressure test of components of accessories
13 Prequalification test of the cable system
14 Type test on cables
15 Type test on accessories
16 Tests after installation
16.1 General <\/td>\n<\/tr>\n\n 33<\/td>\n 16.2 Tests at ambient temperature
16.2.1 Vacuum test
16.2.2 Pressure test <\/td>\n<\/tr>\n\n 34<\/td>\n 16.3 Tests at operating temperature
16.3.1 General
16.3.2 DC current test
16.3.3 AC voltage test of the insulation <\/td>\n<\/tr>\n\n 35<\/td>\n 16.3.4 DC voltage test of the oversheath <\/td>\n<\/tr>\n \n 36<\/td>\n Tables
Table 1 \u2013 Test voltages <\/td>\n<\/tr>\n\n 37<\/td>\n Table 2 \u2013 Non-electrical type tests for oversheathing compounds for cables <\/td>\n<\/tr>\n \n 38<\/td>\n Table 3 \u2013 Test requirements for mechanical characteristics ofoversheathing compounds for cables (before and after ageing)
Table 4 \u2013 Test requirements for particular characteristics of PVC oversheathing for cables <\/td>\n<\/tr>\n\n 39<\/td>\n Annex A (informative)Cooling system considerations
A.1 Introductory remarks
A.2 Cryogenic refrigeration
A.2.1 General process
Figures
Figure A.1 \u2013 General refrigeration process with indication of temperature and energy flows <\/td>\n<\/tr>\n\n 40<\/td>\n A.2.2 General hardware components <\/td>\n<\/tr>\n \n 41<\/td>\n A.3 Recommendations for tests after installation
A.3.1 General
A.3.2 Pressure test followed by vacuum leak test
Figure A.2 \u2013 General system components and process flow <\/td>\n<\/tr>\n\n 42<\/td>\n A.3.3 Cooling capacity test and efficiency measurement
A.3.4 Circulation pump mass flow and pressure test
A.3.5 Temperature and pressure control test
A.3.6 Noise measurements
A.3.7 Other measurements <\/td>\n<\/tr>\n\n 43<\/td>\n Annex B (normative)Critical current measurement
B.1 Critical current measurement test
B.1.1 General
B.1.2 Procedure
B.1.3 Test method
Figure B.1 \u2013 Test setup for electrical four-probe method <\/td>\n<\/tr>\n\n 44<\/td>\n Figure B.2 \u2013 Voltage-current characteristic for superconductor <\/td>\n<\/tr>\n \n 45<\/td>\n Annex C (informative)Tests for engineering information
C.1 Overview
C.2 AC loss
C.2.1 General
C.2.2 Electrical method
C.2.3 Calorimetric \u2013 vaporization method
C.2.4 Calorimetric \u2013 cryogen mass flow method <\/td>\n<\/tr>\n\n 46<\/td>\n C.3 Heat invasion of cryostat
C.3.1 General
C.3.2 Calorimetric \u2013 vaporization of liquid cryogen
C.3.3 Calorimetric \u2013 liquid cryogen mass flow method
C.4 Electrical parameters
C.5 Short-circuit tests (fault current) <\/td>\n<\/tr>\n\n 47<\/td>\n Annex D (informative)List of type tests on cable systems
Table D.1 \u2013 Type tests on cable systems <\/td>\n<\/tr>\n\n 48<\/td>\n Annex E (normative)Tests on outer protection for joints
E.1 General
E.2 Range of approval
E.3 Voltage tests
E.3.1 General
E.3.2 Assemblies embodying accessories without sheath sectionalizing insulation
E.3.3 Assemblies embodying sheath sectionalizing insulation <\/td>\n<\/tr>\n\n 49<\/td>\n E.4 Examination of test assembly
Table E.1 \u2013 Impulse voltage tests <\/td>\n<\/tr>\n\n 50<\/td>\n Annex F (informative)Prequalification test of the cable system <\/td>\n<\/tr>\n \n 51<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" \n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2019<\/td>\n 52<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":242402,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[493,2641],"product_tag":[],"class_list":{"0":"post-242400","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-29-060-20","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/242400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/242402"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=242400"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=242400"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=242400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}