{"id":161824,"date":"2024-10-19T09:43:40","date_gmt":"2024-10-19T09:43:40","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/va-designmanuals-pg-18-10-dmfire\/"},"modified":"2024-10-25T02:01:32","modified_gmt":"2024-10-25T02:01:32","slug":"va-designmanuals-pg-18-10-dmfire","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/veteransaffairs\/va-designmanuals-pg-18-10-dmfire\/","title":{"rendered":"VA DesignManuals PG 18 10 dmFire"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | FIRE PROTECTION DESIGN MANUAL TABLE OF CONTENTS <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | DEPARTMENT OF VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL INTRODUCTION <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Hoptels and the Life Safety Code (2015 Ed.) <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Fire Alarm System Operation for Health Care and Ambulatory Health Care Occupancies – Background: What is required? How does VA meet the requirements? <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Why do it this way? Other Issues <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | General Requirements <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Explanation of Fire Alarm Interface with Elevators <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | APPENDIX A UAbbreviations Used in this Design Manual <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | UMandatory References FM Approval Manual UL Fire Resistance Directory UL Building Materials Directory UAdditional References <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | APPENDIX C Master Specifications (PG-18-1): Standard Details (PG-18-04): Architectural Mechanical Engineering HVAC Electrical Engineering <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Other VA Criteria Design Review Checklists 003C5 Architecture Boiler Safety Devices <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | APPENDIX D UVA Design Manuals (PG-18-10)U: UVA Design GuidesU: <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Appendix E Decision Tool to Determine Occupancy Classifications for Mixed Occupancies Question 1 Question 2 Question 3 Is this portion of the building contiguous to a healthcare occupancy? Question 4 Is this portion of the building intended primarily for outpatient or non-patient use? <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Question 5 Question 6 Question 7 Is this portion of the building contiguous to a healthcare occupancy? Question 8 Question 9 Is this portion of the building contiguous to an ambulatory healthcare occupancy? Question 10 <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | INDEX <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | SPEARS\u00ae MANUFACTURING COMPANY CORPORATE OFFICE 15853 OLDEN STREET ( SYLMAR, CALIFORNIA 91342 MAILING ADDRESS: P.O. BOX 9203 ( SYLMAR, CALIFORNIA 91392 <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | SPEARS\u00ae MANUFACTURING COMPANY CORPORATE OFFICE 15853 OLDEN STREET ( SYLMAR, CALIFORNIA 91342 MAILING ADDRESS: P.O. BOX 9203 ( SYLMAR, CALIFORNIA 91392 <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | \ufffd BULLETIN #2: VISUAL ALARMS <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" VA Design Manuals (PG-18-10) – CPM Schedule and Risk Management – Fire Protection<\/b><\/p>\n |