WRC volume 49 No. 05-06:1994
$27.95
Progress Reports Volume 49 No. 05-06
Published By | Publication Date | Number of Pages |
WRC | 1994 | 122 |
Contents
This volume includes the full Minutes of the Executive Committee and the Design Division. The balance of the PVRC Minutes, including those of the PVRC Materials and Fabrication Division, appear in teh companion volume, July/August 1994 Progress Reports.
– Executive Committee, February 2, 1994
– JPVRC Progress Reports
– PVRC Operating Procedures
– PVRC By-Laws
– Fatigue Coordinating Committee, January 31, 1994
– Task Group on Continuing Operation of Equipment, January 31, 1994
– Design Division, February 2, 1994
– Committee on Bolted Flanged Connections, February 1, 1994
– Subcommittee on Gasket Testing and Elevated Temperature Flanged Joint Behavior, January 31, 1994
– Subcommittee on Flanges Parameter Study, January 31, 1994
– Task Group on Valve Stem Emissions, February 1, 1994
– Information Exchange Meeting on Gasket Testing, Part 1 and 2, January 31, 1994
– Committee on Dynamic Analysis and Testing, February 1, 1994
– Subcommittee on Dynamic Stress Criteria, February 1, 1994
– Committee on Elevated Temperature Design, February 1, 1994
– Committee on Piping and Nozzles, January 31, 1994
– Subcommittee on Flexibility Models and Stress Intensification Factors, January 31, 1994
– Subcommittee on Long Range Planning, January 31, 1994
– Subcommittee on Shell Intersections, January 31, 1994
– Task Group on Large Diameter Shell Intersections, January 31, 1994
– Committee on Polymers for Pressure Components, February 1, 1994
– Committee on Shells and Ligaments, January 31, 1994
– Alphabetical Listing of Pressure Vessel Research Council Members