IEEE STD 515 2004
$45.50
IEEE Standard for the Testing, Design, Installation, and Maintenance of Electrical Resistance Heat Tracing for Industrial Applications
Published By | Publication Date | Number of Pages |
IEEE | 2004 | 75 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | Title page Title page |
4 | Introduction Introduction Participants Participants |
6 | Contents Contents |
8 | 1. Overview 1. Overview 1.1 Scope 1.1 Scope |
9 | 1.2 Purpose 1.2 Purpose 2. References 2. References 3. Definitions 3. Definitions |
13 | 4. General product testing 4. General product testing 4.1 Type testāGeneral purpose tests 4.1 Type testāGeneral purpose tests |
21 | 4.2 Type testāverification of sheath temperatures 4.2 Type testāverification of sheath temperatures |
23 | 4.3 Specific type test requirements for hazardous (classified) locations 4.3 Specific type test requirements for hazardous (classified) locations |
25 | 4.4 Routine tests 4.4 Routine tests |
26 | 5. Marking and installation instructions 5. Marking and installation instructions 5.1 Product markings for heating devices 5.1 Product markings for heating devices 5.2 Markings for field-assembled components 5.2 Markings for field-assembled components |
27 | 5.3 Installation Instructions 5.3 Installation Instructions 6. Design 6. Design 6.1 Process considerations 6.1 Process considerations |
28 | 6.2 Environmental/site considerations 6.2 Environmental/site considerations 6.3 Thermal insulation and heat-loss considerations 6.3 Thermal insulation and heat-loss considerations |
32 | 6.4 Maximum temperature determination 6.4 Maximum temperature determination |
34 | 6.5 Stabilized and controlled designs 6.5 Stabilized and controlled designs |
35 | 6.6 Design information 6.6 Design information |
37 | 6.7 Power system 6.7 Power system |
38 | 6.8 Special considerations 6.8 Special considerations |
41 | 6.9 Control and monitoring considerations 6.9 Control and monitoring considerations |
44 | 6.10 Division 1 and Zone 1 design requirements 6.10 Division 1 and Zone 1 design requirements |
45 | 6.11 Safety shower design requirements 6.11 Safety shower design requirements 7. Installation 7. Installation 7.1 Personnel 7.1 Personnel 7.2 Receiving and storage of materials 7.2 Receiving and storage of materials |
46 | 7.3 Scheduling of installation 7.3 Scheduling of installation 7.4 General installation recommendations 7.4 General installation recommendations |
47 | 7.5 Special Division 1 and Zone 1 installation requirements 7.5 Special Division 1 and Zone 1 installation requirements |
49 | 7.6 Controls and sensors 7.6 Controls and sensors 7.7 Cable testing after installation 7.7 Cable testing after installation 7.8 Thermal insulationāRecommendations 7.8 Thermal insulationāRecommendations |
50 | 7.9 Functional check and field documentationāRecommendations 7.9 Functional check and field documentationāRecommendations |
51 | 8. Maintenance 8. Maintenance 8.1 General maintenance recommendations 8.1 General maintenance recommendations 8.2 Division 1/Zone 1 maintenance recommendations 8.2 Division 1/Zone 1 maintenance recommendations 8.3 Visual inspection 8.3 Visual inspection 8.4 Periodic operational check 8.4 Periodic operational check |
52 | 8.5 Record keeping 8.5 Record keeping |
53 | Annex AāBibliography Annex AāBibliography |
55 | Annex BāPipe heat-loss considerations Annex BāPipe heat-loss considerations |
61 | Annex CāVessel heat-loss considerations Annex CāVessel heat-loss considerations |
65 | Annex DāHeat-up considerations Annex DāHeat-up considerations |
67 | Annex EāMethod to determine equivalent thicknesses of insulating cements Annex EāMethod to determine equivalent thicknesses of insulating cements |
68 | Annex FāType test matrix for Clause 4 Annex FāType test matrix for Clause 4 |
70 | Annex GāDesign basic dataāExample (see 6.6) Annex GāDesign basic dataāExample (see 6.6) |
71 | Annex HāHeater installation recordāExample (see 7.2.2) Annex HāHeater installation recordāExample (see 7.2.2) |
72 | Annex IāDivision 1/Zone 1āChecklist example (see 7.5) Annex IāDivision 1/Zone 1āChecklist example (see 7.5) |
73 | Annex JāHeater commissioning recordāExample (see 7.9) Annex JāHeater commissioning recordāExample (see 7.9) |
74 | Annex KāMaintenance log recordāExample (see 8.5.3) Annex KāMaintenance log recordāExample (see 8.5.3) |