BS EN 16603-31-02:2018
$198.66
Space engineering. Two-phase heat transport equipment
Published By | Publication Date | Number of Pages |
BSI | 2018 | 56 |
This standard defines qualification and acceptance requirements for two-phase heat transportation equipment (TPHTE), for use in spacecraft thermal control.
This standard is applicable to qualification and acceptance activities of new hardware.
However, acceptance requirements of this Standard can be used for existing hardware, which has been qualified previously to other requirements than listed herein.
Requirements for mechanical pump driven loops (MPDL) are not included in the present version of this Standard.
This standard also includes definitions and part of the requirements of ECSS-E-ST-32-02 applicable to TPHTE qualification and acceptance.
This standard may be tailored for the specific characteristics and constraints of a space project in conformance with ECSS-S-ST-00.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
9 | 1 Scope |
10 | 2 Normative references |
11 | 3 Terms, definitions and abbreviated terms 3.1 Terms defined in other standards |
12 | 3.2 Terms specific to the present standard |
15 | 3.3 Abbreviated terms |
17 | 4 TPHTE verification principles 4.1 TPHTE categorization 4.2 Involved organizations |
18 | 4.3 Generic requirements in this standard |
19 | 4.4 TPHTE qualification principles 4.4.1 Processes, number of qualification units 4.4.2 Thermal and mechanical qualification 4.4.2.1 Temperature range |
21 | 4.4.2.2 Mechanical qualification |
23 | 4.5 TPHTE acceptance principles |
24 | 5 Requirements for qualification activity 5.1 Technical specification (TS) 5.1.1 General 5.1.2 Requirements to the TS |
25 | 5.1.3 Requirements for formulating technical requirements 5.2 Materials, parts and processes |
26 | 5.3 General qualification requirements 5.3.1 Qualification process 5.3.2 Supporting infrastructure – Tools and test equipment 5.4 Qualification process selection |
28 | 5.5 Qualification stage 5.5.1 Qualification requirements |
29 | 5.5.2 Quality audits 5.5.3 Qualification methods 5.5.3.1 Overview 5.5.3.2 Test |
30 | 5.5.3.3 Analysis 5.5.3.4 Review-of-design (ROD) 5.5.3.5 Inspection |
31 | 5.5.4 Full and delta qualification programme 5.5.4.1 Full qualification programme 5.5.4.2 Delta qualification programme 5.5.5 Performance requirements 5.5.5.1 Generic requirements |
32 | 5.5.5.2 Specific requirements |
34 | 5.6 Qualification test programme 5.6.1 Number of qualification units 5.6.2 Test sequence |
37 | 5.6.3 Test requirements 5.6.3.1 Test specification and reviews 5.6.3.2 Test conditions |
40 | 5.6.3.3 Test data management 5.6.4 Physical properties measurement |
41 | 5.6.5 Proof pressure test 5.6.6 Pressure cycle test 5.6.7 Burst pressure test |
42 | 5.6.8 Leak test |
43 | 5.6.9 Thermal performance test 5.6.9.1 General 5.6.9.2 Specific tests for CCHP |
44 | 5.6.9.3 Specific tests for VCHP |
45 | 5.6.9.4 Specific tests for HP Diode 5.6.9.5 Specific tests for CDL 5.6.10 Mechanical tests 5.6.10.1 General |
46 | 5.6.10.2 Sinusoidal vibration |
47 | 5.6.10.3 Random vibration 5.6.11 Thermal cycle test 5.6.12 Aging and life tests |
48 | 5.6.13 Gas plug test 5.6.14 Reduced thermal performance test 5.6.14.1 General 5.6.14.2 Specific CCHP 5.6.14.3 Specific VCHP |
49 | 5.6.14.4 Specific HP diode 5.6.14.5 Specific CDL 5.7 Operating procedures 5.8 Storage 5.9 Documentation 5.9.1 Documentation summary 5.9.2 Specific documentation requirements |
52 | 6 Requirements for acceptance activity 6.1 General 6.2 Acceptance process 6.2.1 Materials, parts and processes 6.2.2 General acceptance requirements 6.2.2.1 Acceptance process |
53 | 6.2.3 Supporting infrastructure – Tools and test equipment 6.2.4 Acceptance test programme 6.2.5 Operating procedures 6.2.6 Storage |
54 | 6.2.7 Documentation |