Shopping Cart

No products in the cart.

API RP 11S4-2002 (R2013)

$39.00

Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations

Published By Publication Date Number of Pages
API 2002 44
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Each component of the ESP system (pump, motor, intake, seal or protector, cable, switchboard, etc.) is discussed in some detail as far as what must be considered for the best selection at a desired rate and well conditions. Examples are given to illustrate the basic design procedure and illustrate how PVT correlations, multiphase flow correlations, and inflow performance relationships are used.

Summary designs and computer examples using the detailed design principles are presented which show how design considerations fit together, and how tools such as computer programs allow faster solutions resulting in easier trial and error calculations for optimization of designs and study of existing installations.

Topics such as PVT correlations, multiphase flow correlations, and inflow performance relationships are discussed in the appendices.

API RP 11S4-2002 (R2013)
$39.00