{"id":255234,"date":"2024-10-19T16:52:17","date_gmt":"2024-10-19T16:52:17","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-61936-22015\/"},"modified":"2024-10-25T12:18:51","modified_gmt":"2024-10-25T12:18:51","slug":"bsi-pd-iec-ts-61936-22015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-61936-22015\/","title":{"rendered":"BSI PD IEC\/TS 61936-2:2015"},"content":{"rendered":"
This part of IEC 61936<\/span> <\/span> provides, in a convenient form, common rules for the design and the erection of electrical power installations in systems with nominal voltages above 1,5 kV d.c., so as to provide safety and proper functioning for the use intended.<\/p>\n This technical specification does not apply to the design and erection of any of the following:<\/p>\n overhead and underground lines between separate installations;<\/p>\n<\/li>\n electric railways;<\/p>\n<\/li>\n mining equipment and installations;<\/p>\n<\/li>\n installations on ships and off-shore installations;<\/p>\n<\/li>\n electrostatic equipment (e.g. electrostatic precipitators, spray-painting units);<\/p>\n<\/li>\n test sites;<\/p>\n<\/li>\n medical equipment, e.g. medical X-ray equipment;<\/p>\n<\/li>\n valve hall.<\/p>\n<\/li>\n<\/ul>\n This technical specification does not apply to the design of factory-built, type-tested switchgear for which separate IEC standards exist.<\/p>\n This technical specification does not apply to the requirements for carrying out live working on electrical installations.<\/p>\n This technical specification does not apply to the design of factory-built, type-tested thyristor valves, VSC valves and switchgear for which separate IEC standards exist.<\/p>\n Power installations exceeding 1 kV a.c. and 1,5 kV d.c. – d.c.<\/b><\/p>\n\n
PDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 4<\/td>\n CONTENTS <\/td>\n<\/tr>\n \n 7<\/td>\n FOREWORD <\/td>\n<\/tr>\n \n 10<\/td>\n INTRODUCTION <\/td>\n<\/tr>\n \n 11<\/td>\n 1 Scope
2 Normative references <\/td>\n<\/tr>\n\n 12<\/td>\n 3 Terms and definitions <\/td>\n<\/tr>\n \n 14<\/td>\n 4 Fundamental requirements
4.1 General
4.1.1 General requirements
4.1.2 Agreements between supplier (manufacturer) and user
4.2 Electrical requirements
4.2.1 Methods of d.c. neutral point earthing <\/td>\n<\/tr>\n\n 15<\/td>\n 4.2.2 Voltage classification
4.2.3 Current in normal operation
4.2.4 Short-circuit current
4.2.5 Rated frequency
4.2.6 Corona <\/td>\n<\/tr>\n\n 16<\/td>\n 4.2.7 Electric and magnetic fields
4.2.8 Overvoltages
4.2.9 Harmonics
4.2.10 Galvanic separation between a.c. and d.c. systems
4.3 Mechanical requirements
4.4 Climatic and environmental conditions
4.4.1 General <\/td>\n<\/tr>\n\n 17<\/td>\n 4.4.2 Normal conditions
4.4.3 Special conditions
4.5 Special requirements
5 Insulation
5.1 General
5.2 Selection of insulation level
5.2.1 Consideration of methods of neutral earthing
5.2.2 Consideration of rated withstand voltages <\/td>\n<\/tr>\n\n 18<\/td>\n 5.3 Verification of withstand values
5.4 Minimum clearances of live parts <\/td>\n<\/tr>\n\n 20<\/td>\n 5.5 Minimum clearances between parts under special conditions
5.6 Tested connection zones
6 Equipment
6.1 General requirements
6.2 Specific requirements
6.2.1 Switching devices
6.2.2 Reactors <\/td>\n<\/tr>\n\n 21<\/td>\n 6.2.3 Prefabricated type-tested switchgear
6.2.4 Surge arresters
6.2.5 Capacitors
6.2.6 Line traps
6.2.7 Insulators
6.2.8 Insulated cables <\/td>\n<\/tr>\n\n 22<\/td>\n 6.2.9 Conductors and accessories
6.2.10 Rotating electrical machines
6.2.11 Static converters
6.2.12 Fuses
6.2.13 Electrical and mechanical Interlocking
6.2.14 Electronic valve devices
6.2.15 Valve cooling system <\/td>\n<\/tr>\n\n 23<\/td>\n 7 Installations
7.1 General requirements
7.1.1 Circuit arrangement
7.1.2 Documentation
7.1.3 Transport routes
7.1.4 Aisles and access areas
7.1.5 Lighting
7.1.6 Operational safety
7.1.7 Labelling
7.2 Outdoor installations of open design <\/td>\n<\/tr>\n\n 24<\/td>\n 7.2.1 Protective barrier clearances
7.2.2 Protective obstacle clearances
7.2.3 Boundary clearances
7.2.4 Minimum height over access area <\/td>\n<\/tr>\n\n 25<\/td>\n 7.2.5 Clearances to buildings <\/td>\n<\/tr>\n \n 26<\/td>\n Figures
Figure 1 \u2013 Approaches with buildings (within closed electrical operating areas) <\/td>\n<\/tr>\n\n 27<\/td>\n 7.2.6 External fences or walls and access doors
7.3 Indoor installations of open design
7.4 Installation of prefabricated type-tested switchgear
7.5 Requirements for buildings
7.5.1 General
7.5.2 Structural provisions <\/td>\n<\/tr>\n\n 28<\/td>\n 7.5.3 Rooms for switchgear
7.5.4 Maintenance and operating areas
7.5.5 Doors
7.5.6 Draining of insulating liquids
7.5.7 Air conditioning and ventilation <\/td>\n<\/tr>\n\n 29<\/td>\n 7.5.8 Buildings which require special consideration
7.6 High voltage\/low voltage prefabricated substations
7.7 Electrical installations on mast, pole and tower
8 Safety measures
8.1 General
8.2 Protection against direct contact
8.2.1 Measures for protection against direct contact
8.2.2 Protection requirements <\/td>\n<\/tr>\n\n 30<\/td>\n 8.3 Means to protect persons in case of indirect contact
8.4 Means to protect persons working on electrical installations
8.5 Protection from danger resulting from arc fault
8.6 Protection against direct lightning strokes
8.7 Protection against fire
8.8 Protection against leakage of insulating liquid
8.9 Identification and marking
9 Protection, control and auxiliary systems <\/td>\n<\/tr>\n\n 31<\/td>\n 10 Earthing systems
10.1 General
10.2 Fundamental requirements
10.2.1 Safety criteria <\/td>\n<\/tr>\n\n 32<\/td>\n 10.2.2 Functional requirements
10.2.3 High and low voltage earthing systems
10.3 Design of earthing systems
10.3.1 General
Figure 2 \u2013 Touch voltage limit d.c. <\/td>\n<\/tr>\n\n 33<\/td>\n 10.3.2 Power system faults
10.3.3 Lightning and transients
10.4 Construction of earthing systems
10.5 Measurements
10.6 Maintainability
10.6.1 Inspections <\/td>\n<\/tr>\n\n 34<\/td>\n 10.6.2 Measurements
11 Inspection and testing
11.1 General
11.2 Verification of specified performances
11.3 Tests during installation and commissioning
11.4 Trial running
12 Operation and maintenance manual <\/td>\n<\/tr>\n\n 35<\/td>\n Annex A (informative) Values of rated insulation levels and minimum clearances in air based on nominal voltage of some HVDC projects worldwide <\/td>\n<\/tr>\n \n 37<\/td>\n Annex B (normative) Method of calculating the voltage limit <\/td>\n<\/tr>\n \n 38<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" \n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2015<\/td>\n 42<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":255235,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-255234","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/255234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/255235"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=255234"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=255234"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=255234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}