{"id":224442,"date":"2024-10-19T14:35:00","date_gmt":"2024-10-19T14:35:00","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pas-20302017-4\/"},"modified":"2024-10-25T08:20:33","modified_gmt":"2024-10-25T08:20:33","slug":"bsi-pas-20302017-4","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pas-20302017-4\/","title":{"rendered":"BSI PAS 2030:2017"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
5<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4 The EEM design 4.1 Installer responsibility to be in possession of a location specific EEM design 4.2 EEM design validation <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5 Installation process 5.1 Installation method statement 5.2 Installation equipment and tools <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.3 Checking, handling and storage of materials and supplies 5.4 Provision of installation instructions to operatives 5.5 People 5.6 Engagement of subcontract installers <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.7 Commissioning 5.8 Handover 5.9 Installation control 5.10 Installation documents and record keeping <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6 Installation process management 6.1 Operation and process oversight 6.2 Preinstallation building inspection <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.3 Action in respect of Intermediate inspection 6.4 Installation process change 6.5 Process continuity plan <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.6 Process control 6.7 Internal audit and corrective action 6.8 Installation process records 6.9 Business and financial probity <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 7 Service provision 7.1 Complaints procedure 7.2 Complaints records 7.3 Interaction with customers <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 8 Claims of compliance 8.1 Requirement to claim 8.2 Claims in respect of installer designed installations 8.3 Claims in respect of independent third party designed installations <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 9 Documents essential to the application of the \nAnnexes of this PAS 9.1 Use of the identified documents 9.2 British Standards <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 9.3 Institution of Gas Engineer and Managers \u2013 Standards 9.4 Energy Networks Association Engineering Recommendations 9.5 UKLPG 9.6 Department of Communities and Local Government 9.7 Common, Minimum Technical Competence (MTC) Annexes <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 9.8 National occupational Standards (NOS) <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 9.9 Other insulation installation guidance references. <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Annex A \nMeasure specific Annex selection and co\u2011installation requirements Table A.1 \u2013 Category BFM (Building Fabric Measures) <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Table A.2 \u2013 Category BSM (Building Services Mechanical) <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Table A.3 \u2013 Category BSE (Building Services Electrical) <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Table A.4 \u2013 Guidance for the provision of ventilation when installing EEM in existing buildings with air permeability levels >5m3\/hr\/m2 <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Table A.5 \u2013 Minimum levels of background and extract ventilation in conditions described in Table A.4 <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Table A.6 \u2013 Minimum levels of extract and supply ventilation when continuous extraction is used <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex B (normative) \nBFM energy efficiency measures Table B.1 \u2013 Measure specific requirements for cavity wall insulation (BFM.1) <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Table B.2 \u2013 Measure\u2011specific requirements for draught proofing (BFM.2) <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Table B.3 \u2013 Measure\u2011specific requirements for energy efficient glazing and doors (BFM.3) <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Table B.4 \u2013 Measure\u2011specific requirements for external wall insulation (BFM.4) <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | Table B.5 \u2013 Measure\u2011specific requirements for flat roof insulation (BFM.5) <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Table B.6 \u2013 Measure\u2011specific requirements for floor insulation (BFM.6) <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | Table B.7 \u2013 Measure\u2011specific requirements for hybrid wall insulation (BFM.7) <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | Table B.8 \u2013 Measure\u2011specific requirements for internal wall insulation (BFM.8) <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | Table B.9 \u2013 Measure specific requirements for loft insulation (BFM.9) <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Table B.10 \u2013 Measure\u2011specific requirements for pitched roof insulation (BFM.10) <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | Table B.11 \u2013 Solar Blinds, Shutters and Shading Devices (BFM.11) <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | Table B.12 \u2013 Room\u2011in\u2011roof insulation (BFM12) <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | Annex C (normative) \nBSM energy efficiency measures (normative) <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | Table C.1 \u2013 Measure\u2011specific requirements for chiller units (BSM.1) <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | Table C.2 \u2013 Measure\u2011specific requirements for gas\u2011fired condensing boilers (BSM.2) <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | Table C.3 \u2013 Measure\u2011specific requirements for oil\u2011fired condensing boilers (BSM.3) <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | Table C.4 \u2013 Measure\u2011specific requirements for flue\u2011gas recovery devices (BSM.4) <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | Table C.5 \u2013 Measure\u2011specific requirements for heating system insulation (including ducting, pipes and cylinders) (BSM.5) <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | Table C.6 \u2013 Measure\u2011specific requirements for Heating, hot water system, air conditioning or ventilation controls and components (BSM.6) <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | Table C.7 \u2013 Measure\u2011specific requirements for hot water systems (BSM.7) <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | Table C.8 \u2013 Measure\u2011specific requirements for Mechanical Ventilation and Heat Recovery (BSM.8) <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | Table C.9 \u2013 Measure\u2011specific requirements for Radiant heating (BSM.9) <\/td>\n<\/tr>\n | ||||||
159<\/td>\n | Table C.10 \u2013 Measure\u2011specific requirements for under\u2011floor heating (BSM.10) <\/td>\n<\/tr>\n | ||||||
164<\/td>\n | Table C.11 \u2013 Measure\u2011specific requirements for gas and \/or oil\u2011fired warm\u2011air heating systems (domestic and non\u2011domestic) (BSM.11) <\/td>\n<\/tr>\n | ||||||
170<\/td>\n | Table C.12 \u2013 Water efficient taps and showers (BSM.12) <\/td>\n<\/tr>\n | ||||||
176<\/td>\n | Annex D (normative) \nBSE energy efficiency measures Table D.1 \u2013 Measure\u2011specific requirements for Electric storage heaters (BSE.1) <\/td>\n<\/tr>\n | ||||||
181<\/td>\n | Table D.2 \u2013 Measure\u2011specific requirements for Lighting fittings, lighting systems and lighting system controls (BSE.2) <\/td>\n<\/tr>\n | ||||||
184<\/td>\n | Table D.3 \u2013 Variable speed drives for fans and pumps (BSE.3) <\/td>\n<\/tr>\n | ||||||
187<\/td>\n | Annex E (informative) \nPAS 2030:2014\/PAS 2030:2017 \u2013 Substantive change Table E.1 \u2013 Substantive change introduced in PAS 2030:2017 <\/td>\n<\/tr>\n | ||||||
189<\/td>\n | Annex F (informative) \nInstaller guidance on the use and application of PAS\u00a02030:2017 <\/td>\n<\/tr>\n | ||||||
192<\/td>\n | Annex\u00a0G (informative) \nExample installation project information collation form <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Improving the energy efficiency of existing buildings. Specification for installation process, process management and service provision<\/b><\/p>\n |