BS EN IEC 62941:2020
$142.49
Terrestrial photovoltaic (PV) modules. Quality system for PV module manufacturing
Published By | Publication Date | Number of Pages |
BSI | 2020 | 32 |
IEC 62947:2019 is applicable to organizations manufacturing photovoltaic (PV) modules certified to IEC 61215 series and IEC 62108 for design qualification and type approval and IEC 61730 for safety qualification and type approval. The design qualification and type approval of PV modules depend on appropriate methods for product and process design, as well as appropriate control of materials and processes used to manufacture the product. This document lays out best practices for product design, manufacturing processes, and selection and control of materials used in the manufacture of PV modules that have met the requirements of IEC 61215 series, IEC 61730, or IEC 62108. These standards also form the basis for factory audit criteria of such sites by various certifying and auditory bodies. The object of this document is to provide a framework for the improved confidence in the ongoing consistency of performance and reliability of certified PV modules. The requirements of this document are defined with the assumption that the quality management system of the organization has already fulfilled the requirements of ISO 9001 or equivalent quality management system. This document is not intended to replace or remove any requirements of ISO9001 or equivalent quality management system. By maintaining a manufacturing system in accordance with this document, PV modules are expected to maintain their performance as determined from the test sequences in IEC 61215 series, IEC 62108, or IEC 61730.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
5 | Annex ZA(normative)Normative references to international publicationswith their corresponding European publications |
7 | English CONTENTS |
9 | FOREWORD |
11 | 1 Scope 2 Normative references |
12 | 3 Terms, definitions and abbreviated terms |
15 | 4 Support 4.1 Resources 4.1.1 Succession planning 4.1.2 Provision of resources for product warranty system |
16 | 4.2 Monitoring and measuring resources 4.2.1 Control of monitoring and measuring equipment 4.2.2 Control of performance rating (IV) measurement equipment 4.3 Control of documented information 5 Operation 5.1 Operational planning and control |
17 | 5.2 Requirements for products and services 5.2.1 Customer communication 5.2.2 Determining the requirements for products and services 5.2.3 Review of the requirements for products and services |
18 | 5.2.4 Organization manufacturing feasibility 5.3 Design and development of products and services 5.3.1 Design and development planning 5.3.2 Design and development inputs 5.3.3 Design and development controls |
19 | 5.3.4 Design and development outputs 5.3.5 Design and development changes 5.3.6 Manufacturing process design inputs 5.3.7 Manufacturing process design outputs |
20 | 5.4 Control of externally provided processes, products and services 5.4.1 General 5.4.2 Type and extent of control |
21 | 5.4.3 Information on external providers 5.5 Production and service provision 5.5.1 Control of production and service provision 5.5.2 Control plan |
22 | 5.5.3 Control plan for the measurement procedure 5.5.4 Control plan for all solar simulators used for performance rating |
23 | 5.5.5 Validation of processes for production and services provisions 5.5.6 Identification and traceability 5.5.7 Customer property 5.5.8 Preservation of product |
24 | 5.5.9 Post-delivery activities 5.6 Control of nonconforming outputs 6 Performance evaluation 6.1 Monitoring, measurement, analysis and evaluation 6.1.1 Monitoring and measurement of a manufacturing process |
25 | 6.1.2 Monitoring and measurement of product 6.1.3 Ongoing product monitoring |
26 | 6.2 Customer satisfaction 6.3 Analysis and evaluation 6.4 Internal audit 7 Improvement 7.1 Corrective and preventive action 7.2 Continual improvement |
27 | Annex A (informative)Correspondence between ISO 9001:2015 and IEC 62941 |
30 | Bibliography |