BS EN IEC 62040-1:2019+A1:2023
$215.11
Uninterruptible power systems (UPS) – Safety requirements
Published By | Publication Date | Number of Pages |
BSI | 2023 | 82 |
No scope available
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
6 | Blank Page |
8 | Blank Page |
9 | Blank Page |
10 | Annex ZZ (informative)Relationship between this European Standard and the safety objectives of Directive 2014/35/EU [2014 OJ L96] aimed to be covered |
12 | English CONTENTS |
14 | FOREWORD |
16 | INTRODUCTION |
17 | 1 Scope 2 Normative references |
18 | 3 Terms and definitions |
19 | Tables Table 1 – Alphabetical list of terms |
25 | 4 Protection against hazards |
26 | Table 101 – UPS input port configuration |
28 | Figures Figure 101 – Examples of design of openings preventing vertical access |
29 | Table 102 – Overvoltage categories |
31 | Table 103 – Maximum temperature limits for magnetic components during stored energy mode of operation |
38 | 5 Test requirements |
39 | Table 22 – Test overview |
44 | Figure 102 – Test circuit for load-induced change of reference potential – Single-phase output Figure 103 – Test circuit for load-induced change of reference potential – Three-phase output |
47 | Table 104 – Short-time withstand current |
50 | Table 105 – Temperature limits for transformer windings |
52 | 6 Information and marking requirements |
55 | Figure 104 – Voltage backfeed warning label |
59 | Annexes |
60 | Annex A (normative) Additional information for protection against electric shock Table A.101 – Comparison of limits of working voltage |
61 | Annex M (informative) Test probes for determining access |
62 | Annex AA (informative) Minimum and maximum cross-section of copper conductors suitable for connection to terminals for external conductor Figure M.101 – Jointed test finger (IP2X) |
63 | Table AA.1 – Conductor cross-sections(extract from IEC 61439-1:2011) |
64 | Annex BB (normative) Reference loads Figure BB.1 – Reference resistive load |
65 | Figure BB.2 – Reference inductive-resistive load (series) Figure BB.3 – Reference inductive-resistive load (parallel) Figure BB.4 – Reference capacitive-resistive load (series) Figure BB.5 – Reference capacitive-resistive load (parallel) |
66 | Figure BB.6 – Reference non-linear load |
68 | Annex CC (normative) Ventilation of lead-acid battery compartments |
71 | Annex DD (informative) Guidance for disconnection of batteries during shipment Figure DD.1 – Precautionary label for products shipped with the battery disconnected |
72 | Figure DD.2 – Precautionary label for products shipped with the battery connected |
73 | Annex EE (informative) Short-time withstand current test procedure – Guidance and typical values Figure EE.1 – 3-wire test circuit for UPS short-time withstand current |
74 | Figure EE.2 – 4-wire test circuit for UPS short-time withstand current |
75 | Figure EE.3 – 2-wire test circuit for single phase UPS short-time withstand current |
77 | Annex FF (informative) Maximum heating effect in transformer tests Table FF.1 – Test steps |
79 | Annex GG (normative) Requirements for the mounting means of rack-mounted equipment |
81 | Bibliography |