Shopping Cart

No products in the cart.

BS EN 62952-3:2017

$142.49

Power sources for a wireless communication device – Generic energy harvesting adapter module

Published By Publication Date Number of Pages
BSI 2017 24
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

IEC 62952-3:2017 specifies  requirements and a  profile for a power source containing a generic energy harvesting adapter module (GEHAM) used as power source for wireless communication devices (WCD).

PDF Catalog

PDF Pages PDF Title
2 National foreword
7 English
CONTENTS
9 FOREWORD
11 INTRODUCTION
12 1 Scope
2 Normative references
3 Terms, definitions, abbreviated terms, acronyms and conventions
3.1 Terms and definitions
3.2 Abbreviated terms and acronyms
13 3.3 Convention for capitalizations
3.4 Convention for profiles
Tables
Table 1 – Layout of profile (sub)clause selection tables
Table 2 – Contents of (sub)clause selection tables
14 4 Specific requirements for power sources with energy harvesting
4.1 General
4.2 GEHAM and energy harvester
4.3 Mechanical requirements
4.3.1 Connector
4.3.2 Flying lead
15 4.3.3 Cable specification
4.3.4 Enclosure shape
4.4 Electrical characteristics
4.4.1 General
4.4.2 Input rating of GEHAM
4.4.3 Output rating of GEHAM
4.4.4 Protections
4.5 Communication interface
5 Profile for power modules with energy harvesting
16 Table 3 – General power module profile selection
Table 4 – Power Module Type C profile selection
17 Annex A (informative) Mechanical options
Figures
Figure A.1 – Option 1: Fixed connection on energy harvester, connector on GEHAM
Figure A.2 – Option 2: Connectors on both energy harvester and GEHAM
18 Figure A.3 – Option 3: Cable fixed on energy harvester, Flying Lead to GEHAM
Figure A.4 – Option 4: Connector on energy harvester end, Flying Lead connection to GEHAM
Figure A.5 – Option 5: Flying-lead interface on energy harvester, flying-lead interface on GEHAM side
19 Figure A.6 – GEHAM is inside, energy harvester is outside of WCD
Figure A.7 – GEHAM and energy harvester are outside of WCD, it supplies to built-in power source
20 Annex B (normative) Cable and connector specification
B.1 General requirements
Figure B.1 – M12 male
21 B.2 Pin 1, Ground
B.3 Pin 2, Digital communication interface
Figure B.2 – M12 female
Figure B.3 – Flying lead
22 B.4 Pin 3, DC power (positive)
B.5 Pin 4, Sense
B.6 Pin 5, Reserved
23 Bibliography
BS EN 62952-3:2017
$142.49