BS 7941-1:2006
$102.76
Methods for measuring the skid resistance of pavement surfaces – Sideway-force coefficient routine investigation machine
Published By | Publication Date | Number of Pages |
BSI | 2006 | 20 |
This British Standard describes a method for determining the wet-road skid resistance of a surface using the sideway-force coefficient routine investigation machine (SCRIM). The method provides a measure of the wet-road skid resistance properties of a bound surface by measurement of sideway-force coefficient at controlled speed. The method has been developed for use on roads but is also applicable to other paved areas such as airport runways.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | Contents 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Safety 2 5 Principle 3 6 Test equipment 3 7 Calibration 5 8 Test procedure 7 9 Test report 8 Annexes Annex A (normative) Dynamic calibration check 9 Annex B (normative) Distance calibration check 10 Annex C (informative) Report format 11 Annex D (informative) (informative) Precision of data 12 Bibliography 13 List of tables Table 1 – Static calibration 6 |
5 | Foreword |
7 | 1 Scope 2 Normative references 3 Terms and definitions 3.1 skid resistance 3.2 wet-road skid resistance 3.3 bound surface 3.4 sideway-force coefficient (SFC) 3.5 subsection |
8 | 3.6 test section 3.7 test length 3.8 SCRIM reading (SR) 3.9 corrected data 3.10 SCRIM coefficient (SC) 3.11 index of SFC 3.12 theoretical water film thickness 4 Safety |
9 | 5 Principle 6 Test equipment 6.1 SCRIM test equipment a) test wheel assembly; b) water supply and flow control mechanism; c) electronic recorder and measurement control system. 6.2 Test wheel assembly |
10 | 6.3 Test tyre 6.4 Water supply and flow control 6.5 Measurement control system |
11 | 6.6 Electronic recorder 7 Calibration 7.1 Static calibration of horizontal load measurement |
12 | Table 1 Static calibration 7.2 Static calibration of vertical load measurement |
13 | 7.3 Vertical load static check 7.4 Dynamic calibration check 7.5 Distance calibration 8 Test procedure 8.1 Prior to testing |
14 | 8.2 Testing 9 Test report a) name of the organization; b) names of SCRIM driver and operator; c) machine reference; d) date of test; e) weather conditions; f) test length description; g) start time; h) target speed; i) comments. |
15 | Annex A (normative) Dynamic calibration check A.1 General A.2 Operational procedures for dynamic comparison checks |
16 | Annex B (normative) Distance calibration check |
17 | Annex C (informative) Report format |
18 | Annex D (informative) (informative) Precision of data |
19 | Bibliography |